Original source · versioned page text
Appendix G - Code Responses
TRANSPORT CODE
Performance outcomes Acceptable Outcomes Applicant’s Comments
1. controls vehicle movement by
delineating the carriageway for all
users;
2. conveys road pavement run-off to
stormwater drainage in a manner
that allows the road to be
trafficable in 1%AEP local rainfall
events; and
4. verges and footpaths provide—
1. safe access for pedestrians and
cyclists clear of obstructions;
2. an access area for vehicles onto
properties;
3. a corridor allocated for services
and utilities; and
additional amenity for minor
roads.
Activity Centres and Community Facilities
PO11 AO11.1 Complies.
All key destinations such as activity centres, Adjoining and within 200 metres of activity
No additional pathway works are required.
educational establishments, community centres, educational establishments,
facilities, aged car facilities, beaches and community facilities, beaches and sports
sports grounds can be reached by a range of grounds:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix G - Code Responses.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.