Council archive · source document
Appendix G - Code Responses · MCU23/0070
VISITOR ACCOMMODATION CODE
Performance outcomes Acceptable Outcomes Applicant’s Comment
1. is appropriate to its location and 2. where not located in a sewered
setting; area, the premises are connected
2. maintains environmental and to an onsite effluent treatment
public health; and and disposal system.
3. is commensurate with the needs
of users. Editor’s Note—the Plumbing and Drainage
Act 2003 sets outs requirements for on-
site effluent treatment and disposal.
AO13.2
Visitor accommodation is: Complies
The development will be connected to reticulated
1. connected to the reticulated water
water supply infrastructure
network; or
2. where reticulated water supply is
not available, provided with an
alternative drinking water supply
source (e.g. rainwater) that
complies with the Australian
Drinking Water Guidelines
(NHMRC,2011)
Tourist Parks (including camping grounds)
PO14 AO14.1 Not applicable
The tourist park is of a size and layout that
Any free standing or transportable
ensures: accommodation building or structure
(including cabins or villas) has a
1. it can accommodate the intended maximum gross floor area of 90m2 and does
use, having regard to varying not include facilities for washing clothes.
styles and sizes of
accommodation;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix G - Code Responses.pdfRelated documentApplication case desk ↗
About this file
- File size
- 634 KB (small file)
- File type
No other editions are linked here.