Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Appendix G - Code Responses

of 156
                                                      BUSINESS ACTIVITIES CODE
Performance outcomes                             Acceptable outcomes                              Applicant’s Comments
                                                                                                  accords with the Visitor Centre hierarchy
                                                                                                  designation for Duke St, by providing mixed
                                                                                                  use developments in the form of cafes and
                                                                                                  restaurants that service the needs of tourist.
                                                                                                  In doing so, it also reinforces Dukes St
                                                                                                  village centre hierarchy by offering a local
                                                                                                  level of visitor services.
PO4                                                                                               Complies
Business activities contribute to the local      No acceptable outcome provided                   The new food and drink outlet is suitably
economy and vibrancy of the area in which it                                                      located in Dukes St local service centre. The
is located.                                                                                       site’s refurbishment aims to provide a
                                                                                                  positive contribution to the area through the
                                                                                                  inclusion of a modern mixed-use
                                                                                                  development. The development would not
                                                                                                  only contribute to the economy through the
                                                                                                  construction phase but will also provide
                                                                                                  ongoing services and employment
                                                                                                  opportunities throughout the life of the
                                                                                                  development. The renewal of the site will
                                                                                                  provide a positive uplift to the streetscape
                                                                                                  and subtly add to the existing vibrancy of the
                                                                                                  Duke St precinct.
Major Infrastructure
PO5                                              AO5.1                                            Complies
Development is sufficiently separated from       Buildings and structures are not constructed     The proposed development is not proposed
infrastructure including electricity             under overhead electricity transmission lines,   to be constructed underneath an overhead
infrastructure and substations to minimise the   or within easements.                             electricity line or easement
likelihood of nuisance or complaint.

                                                 AO5.2                                            Not applicable
                                                 Development adjacent to or within 50 metres
                                                 of a substation, major electricity
                                                 infrastructure or major utility incorporates

Log in to download the original (Appendix G - Code Responses.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.