Council archive · source document
Appendix G - Code Responses · MCU23/0070
TOURIST ACCOMMODATION ZONE CODE
Performance Outcomes Acceptable Outcomes Applicant’s Comments
2. steps down slopes or uses AO25.2 Complies
suspended floor construction, On sloping sites, split-level buildings, with The development will involve a split level
minimising cut and fill and avoiding small floorplates, that step down the slope are building, but will still require a slab on ground
benching of the site. used as an alternative to slab on ground due to the nature of the development and
construction to minimise building bulk and slope.
benching of the sites.
Editor's note- Refer to Figure 6.9.1A
and Figure 6.9.1B
AO25.3 Complies
The distance between the ground level and the Refer to the proposal plans in Appendix A.
lowest part of the floor of the building does not
exceed 3 metres.
Earthworks and drainage
PO26 AO26 Complies
Filling and excavation for operational works do Filling and excavation for operation works are The development has been designed in
not directly, indirectly or cumulatively cause designed and constructed to ensure overland accordance with a stormwater management
adverse impacts external to the flow and/or flooding is not worsened, impeded, plan to ensure overland flow and flooding is
development site by: or otherwise diverted to adversely affect other not worsened, impeded or directed towards
properties or downstream environments. adjoining premises (refer to Appendix C).
1. causing ponding of water on
the site or nearby land;
2. increasing flooding, which
adversely affects the safety or use
of any land upstream or
downstream; or
3. adversely affecting the flow of
water in any overland flow path.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix G - Code Responses.pdfRelated documentApplication case desk ↗
About this file
- File size
- 634 KB (small file)
- File type
No other editions are linked here.