Council archive · source document
09/1405 - Suncert - Preliminary Building Works [As Published] · 172009.1405
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
HERITAGE ze 7 - a
11A {s any part of the 18 proposal intended to be carried out on a Queensland heritage nlace under the Queensland Heritage Act 1992?
[X] No-Goio118 = ([] Yes
IFA, schedule 8, part 1, table §, tem 2-7 Regulation. schedule 2, fable 2. en 18.
1.18 Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land?
[X] No-Gotoa12 ([_] Yes
IPA, schedute 8, part 1 table 5, tem 24, #P Regulation, scnedure 1, part 2, table 5, tem 2.
remy panererenymcigerrN omnes 9 cy
sats t it whe ut wi “Ae 0 oun
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
BX] No-Gowoar3 [[] Yes
IPA, schedule 8, part 1, table 6, item 1; IP Regulation, schedule 2, table 2, item 11: 1P Regulation, schedule 1, table 5, item 2 (wild river area); Water Act 2000.
section $66C; Wild Rivers Act 2005, section 434
one
[REMOVING QUARRY MATERIAL; WILD RIVER AREA >a
13 Does the oropoeel involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
(J No-Gotoars [] Yes
IPA, schedule 8, part |. table 2, lem 1: IPA, schedule 8, part 1. table 5, tems 3 and 4: IP Regulation, schavule 2, table 2, tems 1 and 23; Environmental Protection Act 1994, section
T3AA (wil! river area): Wild Rivers Act 2005, section 43A: relevant wild river declaration: Wild Rivers Code.
WITHIN:THE: LIMITS OF A PORT:
14 is any part of the premises within the limits of a port under the Transport infrastructure Act 1994?
No - Goto 01,5
(] Yes
JP Regulation, schedule 2, table 2, items 15 ant 16
sari
af
ee
ati
iDECLARED FISH:HABITAT ‘AREA..’:
1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
DX] No - Goto 01.6
C] Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation, schedule 2, table 2, item 26)
‘COMMUNITY INFRASTRUCTURE
1.6 ts any part of the premises designated for community infrastructure?
No - Goto Q1.7
(J Yes
IP Regulation, schedule 2. table 3. ten 7
WASTE WATER MANAGEMEN
V7 Does the proposal involve the establishment or expansion of a waste water disposal system?
[X] No - End of Section 1 O Yes
IP Regulation. schudiue 2, table 3. ten 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1405 - Suncert - Preliminary Building Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.