Appendix E - Soil and Effluent Disposal Report
Notes
Levels shown are
approximate and are sourced
from local council mapping N
or information provided by
the client. These levels are
solely to demonstrate the
functionality of the system.
Actual floor height is to be
confirmed with the builder
prior to installation.
All pipe work from the
structure to the proposed Proposed Cabin 2
system should be covered Proposed Cabin 4 Proposed Cabin 3 (Approx RL 120) Proposed Septic Tank
and adequately vented and (Approx RL 121) (Approx RL 122) (1200L) & Pump Well
be vermin/insect proof. (Approx RL 120)
All work carried out should
meet relevant
Proposed Cabin 1
codes/standards and be done
(Approx RL 121)
by an appropriately qualified
and licensed person.
Proposed system should be Proposed Advanced
constructed in a way to BH7 Secondary ASTP
maximize evapotranspiration (Approx RL 121)
and minimize potential Slope
pooling and runoff. 3%
Creek
If plans were not available at Slope Creek
2m
the time of investigation 8%
BH6
further reporting and design
work may be needed prior to
council submission and B8
installation. 2m
Care is to be taken not to BH3 BH9
compact,smear or damage
15m
55
the soil structure during BH10
m
installation (This can lead to 11m
premature failure).
If structures have been built Proposed Advanced
since our initial investigation BH5 BH4 Secondary ASTP
15 Proposed Surface
(Including neighboring 8m m
(Approx RL 120.5)
Irrigation Area - 160sqm
structures) please contact us
(16 x 10m)
to confirm this will not
m
(Approx RL 121)
91
adversely effect the design.
Final landscaping and
Proposed Surface
installation should discourage
Irrigation Area - 160sqm
and limit causal pedestrian
(16 x 10m)
access.(By way of plantings,
(Approx RL 119.5)
border, mounds, visual and
or physical deterrents)
The owner should obtain BH1
knowledge on how to use
and maintain the proposed BH2
system. Most of this is Creek
available from your chosen Creek
supplier/installer.
This report must be
approved by the local council
prior to any work
commencing.
The effluent disposal
report must be
accompanied by a Site
Classification Report. If
the Site Classification is
H1,H2, E or P an
articulation joint will need
to be designed by a
person licensed to do so.
Client- M. McGee
Site - 157 Lawnville Road, Black Mountain
Ground Drill Pty Ltd
Date - 29/11/22
Abbreviations Sunshine Coast, QLD.
Job# - 22/408
BH : Borehole DCP : Dynamic Cone Penetrometer QBCC # 150 345 80
Scale - 1 : 1600 @ A4 (Site features are approximate-Do not scale)
PT : Percolation Test HD : Heavy Droplet Lilac Sprinkler E: [email protected]
TV : Turf Valve RWT : Rain Water Tank W: www.grounddrill.com.au
P: 0407 035 220
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.