                         TRAFFIC IMPACT STATEMENT
                                    Noosaville Childcare Centre
                                   Lot 4, Noosa Business Centre



                                                      Prepared for:
                                Stockwell Development Group Pty Ltd
                                                399 Montague Road
                                               WEST END QLD 4101




SLR Ref: 620.30735-R01
Version No: -v1.0
May 2022
Full text of the other 43 pages

Page 2

Stockwell Development Group Pty Ltd                                       SLR Ref No: 620.30735-R01-v1.0 Traffic Impact Statement
Traffic Impact Statement                                                                                           20220520.docx
Noosaville Childcare Centre                                                                                             May 2022
Lot 4, Noosa Business Centre




PREPARED BY
                                           SLR Consulting Australia Pty Ltd
                                           ABN 29 001 584 612
                                           Level 16, 175 Eagle Street
                                           Brisbane QLD 4000 Australia
                                            (PO Box 26 Spring Hill QLD 4004)
                                           T: +61 7 3858 4800
                                           E: [email protected] www.slrconsulting.com



BASIS OF REPORT
                                           This report has been prepared by SLR Consulting Australia Pty Ltd (SLR) with all reasonable
                                           skill, care and diligence, and taking account of the timescale and resources allocated to it
                                           by agreement with Stockwell Development Group Pty Ltd (the Client). Information
                                           reported herein is based on the interpretation of data collected, which has been accepted
                                           in good faith as being accurate and valid.

                                           This report is for the exclusive use of the Client. No warranties or guarantees are
                                           expressed or should be inferred by any third parties. This report may not be relied upon
                                           by other parties without written consent from SLR.

                                           SLR disclaims any responsibility to the Client and others in respect of any matters outside
                                           the agreed scope of the work.



DOCUMENT CONTROL
 Reference                       Date                  Prepared                   Checked                     Authorised
 620.30735-R01-v1.0              20 May 2022           Brendyn Rheinberger        Jeff Baczynski              Jeff Baczynski




                                                             Page 2

Page 3

Stockwell Development Group Pty Ltd                                                             SLR Ref No: 620.30735-R01-v1.0 Traffic Impact Statement
Traffic Impact Statement                                                                                                                 20220520.docx
Noosaville Childcare Centre                                                                                                                   May 2022
Lot 4, Noosa Business Centre




      CONTENTS
      1             INTRODUCTION ........................................................................................................... 5
      2             SUBJECT SITE ............................................................................................................... 5
      2.1           Site Context ................................................................................................................. 5
      2.2           Surrounding Road Network .......................................................................................... 6
      3             DEVELOPMENT OVERVIEW .......................................................................................... 7
      3.1           Yield............................................................................................................................. 7
      3.2           Car Parking................................................................................................................... 7
      3.3           Bicycle Parking ............................................................................................................. 7
      3.4           Site Access ................................................................................................................... 7
      4             DESIGN CONSIDERATIONS ........................................................................................... 8
      5             CAR PARKING CONSIDERATIONS ................................................................................. 9
      5.1           Located within Business Park Precinct .......................................................................... 9
      5.2           Childcare Parking Rates Comparison ............................................................................ 9
      5.3           Noosa Plan 2020 ........................................................................................................ 10
      6             BICYCLE PARKING CONSIDERATIONS ......................................................................... 10
      7             TRAFFIC CONSIDERATIONS ........................................................................................ 11
      7.1           Development Traffic Demand .................................................................................... 11
      7.2           Site Access ................................................................................................................. 11
      8             PEDESTRIAN CONSIDERATIONS ................................................................................. 12
      9             SERVICING CONSIDERATIONS .................................................................................... 13
      10            CODE RESPONSE ........................................................................................................ 13
      11            SUMMARY ................................................................................................................. 13



      DOCUMENT REFERENCES
      TABLES
      Table 1         Key Surrounding Roads .............................................................................................. 6
      Table 2         Proposed Childcare Centre Capacities ........................................................................ 7
      Table 3         Design Compliance Assessment ................................................................................. 8
      Table 4         Noosa Plan 2020 Probable Solution ........................................................................... 9
      Table 5         Childcare Centre Parking Rate Comparison ................................................................ 9


      FIGURES
      Figure 1        Site Location .............................................................................................................. 6


                                                                         Page 3

Page 4

Stockwell Development Group Pty Ltd                                                            SLR Ref No: 620.30735-R01-v1.0 Traffic Impact Statement
Traffic Impact Statement                                                                                                                20220520.docx
Noosaville Childcare Centre                                                                                                                  May 2022
Lot 4, Noosa Business Centre




      CONTENTS
      Figure 2        Proposed Site Access Arrangements .......................................................................... 8
      Figure 3        Sight Distance Desktop Assessment (Source: NearMap, dated 13 November
                      2021) ....................................................................................................................... 12


      APPENDICES
      Appendix A Development Plan
      Appendix B Swept Path Assessment
      Appendix C Code Responses




                                                                        Page 4

Page 5

 Stockwell Development Group Pty Ltd                            SLR Ref No: 620.30735-R01-v1.0 Traffic Impact Statement
 Traffic Impact Statement                                                                                20220520.docx
 Noosaville Childcare Centre                                                                                  May 2022
 Lot 4, Noosa Business Centre




1          Introduction
SLR Consulting Australia Pty Ltd (SLR) has been engaged by Stockwell Development Group Pty Ltd (Stockwell) to
provide traffic engineering advice and prepare a Traffic Impact Statement (TIS) as part of a proposed childcare
centre to be located on Lot 4 within the Noosa Business Centre in Noosaville. Plans of the proposal are provided
at Appendix A for reference.

The intent of this TIS is to document this advice and assess the consistency of the proposed works against
relevant design standards and good engineering practice to inform Noosa Shire Council’s assessment of a
planning application to facilitate the subject development. Specifically, this document considers the car parking,
access and servicing treatments proposed for the subject site.


2          Subject Site
2.1        Site Context
The subject site is located on Lot 4 within the broader Noosa Business Centre development and fronts an
extension of Hofmann Drive which is currently under construction. Ultimately, Hofmann Drive will be extended
to connect with Walter Hay Drive to the east in addition to the current connection to Eenie Creek Road to the
north, with the site also bound by open space (protected via covenant) and a pedestrian access easement to the
northwest, Lot 3 to the north and Lot 5 to the east. It is understood that Lot 5 is intended to be developed to
provide a swim school, with the ultimate use of Lot 3 unknown at the time of writing.

The location of the subject site is shown in Figure 1, with the development within the local government
jurisdiction of Noosa Shire Council (Council). Accordingly, a review of Council’s Enterprise Mapping System
suggests that the subject site is located within Precinct 5A – Business Park Precinct of the Noosa Business Centre
Precinct.




                                                      Page 5

Page 6

 Stockwell Development Group Pty Ltd                                     SLR Ref No: 620.30735-R01-v1.0 Traffic Impact Statement
 Traffic Impact Statement                                                                                         20220520.docx
 Noosaville Childcare Centre                                                                                           May 2022
 Lot 4, Noosa Business Centre




Figure 1     Site Location




2.2        Surrounding Road Network
Details of the key roads proximate to the subject site as shown in Figure 1 are summarised within Table 1.

Table 1      Key Surrounding Roads
 Road Name               Authority     Classification    Existing Form                                                 Speed Limit
                                                         Dual carriageway with 2 lanes in each direction
 Eenie Creek Road                         Arterial       plus bicycle lanes, mostly urban cross-section (kerb            60km/h
                                                         and channel)
                                                         North of Hofmann Drive: dual carriageway with 2
                                                         lanes in each direction plus bicycle lanes, rural               60km/h
                          Council                        cross-section (swales)
 Walter Hay Drive                         Arterial
                                                         South of Hofmann Drive: 2 lanes undivided with
                                                                                                                         80km/h
                                                         bicycle lanes, rural cross-section
                                                         2 lanes divided with bicycle lanes, urban cross-
 Hofmann Drive                         Collector/Local                                                                   50km/h
                                                         section




                                                             Page 6

Page 7

 Stockwell Development Group Pty Ltd                             SLR Ref No: 620.30735-R01-v1.0 Traffic Impact Statement
 Traffic Impact Statement                                                                                 20220520.docx
 Noosaville Childcare Centre                                                                                   May 2022
 Lot 4, Noosa Business Centre




3          Development Overview
3.1        Yield
Based on the plans prepared by Elevation Architecture dated 17 May 2022 (a copy of which is provided at
Appendix A), the subject development is proposed to consist of a childcare facility of a capacity as shown in
Table 2.

Table 2      Proposed Childcare Centre Capacities
 Development Metric                                                                   Capacity
 Number of children                                                                 94 children
 Number of staff                                                                       15 staff


3.2        Car Parking
A total of 27 car parking spaces plus 1 SRV bay are proposed to be provided off-street, consisting of the following:
          19 set down and pick up spaces for child drop off/pick up;
          7 staff parking spaces, one of which is tandem;
          1 persons with disability space;
          1 SRV space.

In addition to the above, a designated turnaround bay is proposed to facilitate three-point turning manoeuvres
within the car park aisle. Refer to Appendix B for the swept path assessment of this manoeuvre.

3.3        Bicycle Parking
The site plan includes the provision of two bike racks located in close proximity to the secured entrance, with
capacity to house up to 10 bicycles simultaneously.

3.4        Site Access
Vehicular access to the site will be facilitated via a driveway crossover on Hofmann Drive as shown on Figure 2,
with a median break and auxiliary right-turn lane provided as part of the Hofmann Drive extension to
accommodate vehicles entering the site from the east.




                                                       Page 7

Page 8

 Stockwell Development Group Pty Ltd                               SLR Ref No: 620.30735-R01-v1.0 Traffic Impact Statement
 Traffic Impact Statement                                                                                   20220520.docx
 Noosaville Childcare Centre                                                                                     May 2022
 Lot 4, Noosa Business Centre




Figure 2     Proposed Site Access Arrangements




A separate pedestrian access will also be provided to Hofmann Drive as shown on Figure 2, to encourage active
transport use and to improve safety. Along the north-western boundary, a 3m shared path facility is proposed
to facilitate a future connection to the Noosa Civic Shopping Centre.


4          Design Considerations
The design of internal car parking and circulation facilities has been reviewed against the relevant requirements
of Council’s planning scheme and/or the AS2890 suite of Australian Standards as summarised within Table 3.

Table 3      Design Compliance Assessment
 Design Component                                  Proposed Design               Applicable Standard             Compliance
 Visitor parking space dimensions (Class 3A)         2.6m x 5.4m                 Figure 2.2, AS2890.1                  
 Staff parking space dimensions (Class 1)            2.4m x 5.4m                 Figure 2.2, AS2890.1                  
                                               2.6m x 5.4m adjacent to a
 PWD parking space dimensions                                                    Figure 2.1, AS2890.6                  
                                                2.4x x 5.4m shared area
 Parking aisle width                                     6.2m                    Figure 2.2, AS2890.1                  
 Blind aisle extension                                   1.5m                    Figure 2.3, AS2890.1                  

The results of the design compliance assessment presented in Table 3 confirm that the proposed design of the
off-street car parking area is in compliance with relevant design standards.



                                                        Page 8

Page 9

 Stockwell Development Group Pty Ltd                                  SLR Ref No: 620.30735-R01-v1.0 Traffic Impact Statement
 Traffic Impact Statement                                                                                      20220520.docx
 Noosaville Childcare Centre                                                                                        May 2022
 Lot 4, Noosa Business Centre




5          Car Parking Considerations
The car parking requirements for childcare centres of the size proposed herein as specified within Table 9.4.1.4
of Noosa Plan 2020 (the Plan) is summarised within Table 4.

Table 4        Noosa Plan 2020 Probable Solution
 Land Use                                                                                              Probable Solution
                             Yield      Probable Solution Parking Rate
                                                                                                           Provision
                            15 staff    1 space per 2 employees                                             7.5 spaces
 Childcare centre
                          94 children   3 spaces for every employee space                                  22.5 spaces
 TOTAL                                                                                                      30 spaces

The proposed design consists of 27 parking spaces which is three (3) less than Council’s probable solution as per
Table 4 above. As such, the following information is provided to demonstrate the provision of slightly fewer
parking spaces will still provide an acceptable outcome for Council.

5.1        Located within Business Park Precinct
The proposed Childcare centre is located within a designated Business Park precinct as per the Plan. From SLR’s
practical experience it would be expected that a greater than typical proportion of parents would either work
within this precinct, or at the Noosa Civic shopping centre. In situations such as these, it is often the case that
parents will park at their work location, walk their children to the Childcare centre, leave the pram within the
designated pram room, then walk back to their workplace to commence work. This, in turn reduces parking
demand and provides reasonable justification for a slight reduction in car parking supply. Note, the proposed
site plan provides for a designated pram room to facilitate parents leaving their prams at the Childcare centre
while they work.

5.2        Childcare Parking Rates Comparison
SLR have undertaken a car parking rate comparison of five (5) south-east Queensland Council’s along with Noosa
Shire for Childcare centres. This comparison is presented at Table 5 below.

Table 5        Childcare Centre Parking Rate Comparison
 SEQ Council                 Yield      Parking Rate                                                               Provision
 Noosa Shire                            1 space per 2 employees + 3 spaces for every employee space                30 spaces
 Brisbane City                          1 space per 5 children                                                     19 spaces
 Ipswich City                           1 space per 1 employee + 1 space per 8 children                            27 spaces
                          94 children
 Logan City                             1 space per 1 employee + 1 space per 10 children                           24 spaces
                           & 15 staff
 Redland City                           1 space per 1 employee + 1 space per 7 children                            28 spaces
 Sunshine Coast                         1 space per 1 employee + 1 space per 5 children                            34 spaces
           -                            Average Provision                                                         26.4 spaces




                                                            Page 9

Page 10

 Stockwell Development Group Pty Ltd                               SLR Ref No: 620.30735-R01-v1.0 Traffic Impact Statement
 Traffic Impact Statement                                                                                   20220520.docx
 Noosaville Childcare Centre                                                                                     May 2022
 Lot 4, Noosa Business Centre




Out of the five (5) Council’s outside of Noosa Shire, four (4) of these use a Childcare parking rate that equates
to less parking spaces required when applying a yield of 94 children and 15 staff. Across all five (5) Council
jurisdictions, the average car parking provision results in 26.4 spaces, which is also less than what’s proposed
for the subject site.

5.3        Noosa Plan 2020
The Noosa Plan 2020 (the Plan) sets out Council’s strategic intent, amongst other things, for shaping and growing
Noosa Shire in alignment with key values to preserve the Shire’s natural resources and landscapes. The strategic
intent for Transport within the Plan describes prioritising the movement of people and goods rather than cars,
with an immediate focus on delivering infrastructure to support the movement of pedestrians, cyclists, motor
scooters and public transport.

With the above in mind, by Council accepting a slight reduction in parking provision, this decision would be
considered to support the strategic intent for Transport, by further encouraging mode shift from single-
occupancy vehicle use to active and public transport use.


6          Bicycle Parking Considerations
The Plan sets out a probable solution for bicycle parking as follows:
          Community activity:
              a) one space per 50m2 up to 500m2; and
              b) one space per 500m2 in excess of 500m2.
          All uses where not in conflict with QDC MP4.1 for major developments:
           Where five or more bicycle parking spaces is required, end-of-trip cycle facilities are provided at the
           following rate-
                a) one locker per two bicycle parking spaces; and
                b) one shower cubicle with ancillary change room per ten bicycle spaces or part thereof.

The proposed childcare centre consists of approximately 684.2m2 of GFA. Therefore, approximately 10 bicycle
parking spaces are recommended as the probable solution. The site plan depicts two bike racks located near the
secured entrance with each rack having capacity for approximately three (3) to five (5) bicycles simultaneously.
Nevertheless, during the fit out design of the facility, if these bicycle racks are deemed as insufficient, they can
be replaced with slightly larger racks as the space available can accommodate this.

The site plans also show a shower, as well as an Indoor Store and Staff Room which will have available space to
provide the required five (5) lockers. The provision of these end-of-trip facilities satisfies the requirements of
the Plan.

It is important to note, as the proposed site consists of a childcare centre, the proposed bicycle parking and end-
of-trip facilities would not be utilised by parents often, rather, they would more likely be used by staff. Therefore,
the probable solution stated within the Plan to provide 10 bicycle parking spaces are considered to be excessive
when considering only 15 staff members are planned as the total number of employees at the centre.




                                                       Page 10

Page 11

 Stockwell Development Group Pty Ltd                              SLR Ref No: 620.30735-R01-v1.0 Traffic Impact Statement
 Traffic Impact Statement                                                                                  20220520.docx
 Noosaville Childcare Centre                                                                                    May 2022
 Lot 4, Noosa Business Centre




7          Traffic Considerations
7.1        Development Traffic Demand
Peak hour traffic demands have been forecast for the subject development based upon survey data provided
from QLD Government’s Open Data portal. From this portal, there were 17 Childcare centres that were surveyed
between 2006 and 2010 across Queensland, resulting in an average trip generation rate of 0.63 trips per child
for the peak hour. This equates to approximately 59 vph being generated in a peak hour period. In the broader
context of the precinct including the Noosa Civic shopping centre, this level of traffic generation is insignificant,
and it is not expected that further upgrades to what are currently planned would be required.

7.2        Site Access
The driveway crossover has been designed in accordance with Council’s Standard Drawing for Heavy duty vehicle
crossing type B2.

Sight distance requirements for driveways used by commercial vehicles are prescribed within AS2890.2. For a
frontage road speed of 50km/h as per Hofmann Drive, a sight distance from the centre of the driveway to
oncoming traffic (either direction along Hofmann Drive) must achieve a minimum of 69m. A desktop assessment
has been undertaken utilising NearMap to check the available sight distance from the proposed access. Refer to
Figure 3 below.




                                                       Page 11

Page 12

 Stockwell Development Group Pty Ltd                           SLR Ref No: 620.30735-R01-v1.0 Traffic Impact Statement
 Traffic Impact Statement                                                                               20220520.docx
 Noosaville Childcare Centre                                                                                 May 2022
 Lot 4, Noosa Business Centre




Figure 3     Sight Distance Desktop Assessment (Source: NearMap, dated 13 November 2021)




The above figure depicts the sight distance envelopes for a vehicle waiting stationary in the centre of the
driveway with a 3m setback from the Hofmann Drive kerb alignment. If a significant obstruction were to be
located within these envelopes, it would indicate a possible non-compliance to AS2890.2, particularly if that
obstruction could not be removed. Upon inspection of these envelopes on NearMap, it is evident that there are
no significant obstructions to driver sight lines located within the two envelopes and it can be concluded that
the site access is in compliance with AS2890.2.


8          Pedestrian Considerations
Access to the proposed Childcare centre for staff and/or parents walking can utilise the future 2m wide footpath
located on the north-eastern side of Hofmann Drive. For people catching public transport to Noosa Civic
shopping centre and then walking to the proposed site, a future 3m shared path is proposed along the western
boundary connecting Hofmann Drive with the shopping centre. This pedestrian and cyclist connection would
utilise the reserved pedestrian easement to the north.




                                                     Page 12

Page 13

 Stockwell Development Group Pty Ltd                               SLR Ref No: 620.30735-R01-v1.0 Traffic Impact Statement
 Traffic Impact Statement                                                                                   20220520.docx
 Noosaville Childcare Centre                                                                                     May 2022
 Lot 4, Noosa Business Centre




9          Servicing Considerations
The Plan does not specifically prescribe any refuse collection requirements. As such, it is proposed that the
collection of refuse occurs on-street, alleviating any conflicts with parents and children within the car parking
area.

Similarly, the Plan does not specifically prescribe any requirements to provide commercial vehicle parking, other
than to say: ‘the layout of the development provides adequate, clearly defined and easily accessible (b) loading
and manoeuvring areas for delivery and service vehicles’. This requirement is from the Driveways and Parking
Code under Performance Outcome 7 (PO7). In response to this requirement, the development proposes one
SRV parking space to facilitate the delivery of groceries which is anticipated to occur at most once per day during
operating hours, avoiding peak times during the drop-off and pick-up of children. Other deliveries that may be
required will occur outside of operating hours. Refer to Appendix B for swept paths demonstrating the safe
turnaround and manoeuvring of an SRV vehicle into and out of the proposed SRV parking space.


10         Code Response
The traffic and transport aspects of the proposed development have been assessed against the relevant
requirements of the following codes included within the Noosa Plan 2020:
          Driveways and Parking Code.
          Transport Code.

Responses to each of these codes are provided at Appendix C and confirm that the subject development is
generally consistent with relevant code requirements.


11         Summary
SLR has been engaged by Stockwell to provide traffic engineering advice and prepare a Traffic Impact Statement
as part of a proposed Childcare facility located on Hofmann Drive on Lot 4 within the Noosa Business Precinct in
Noosaville, as shown on development plans provided at Appendix A. Based on the assessment documented
herein, the following can be concluded:
          Internal access, circulation and parking infrastructure is generally designed in accordance with relevant
           standards and meets the functional requirements of the development.
          The proposed supply of car parking is three (3) less than what’s prescribed within the Plan. However,
           a slight reduction of parking supply can be justified based on:
              the development is located within the Business Park Precinct which will likely attract parents who
               also work within this Precinct and can park at their workplace and walk to/from the Childcare centre
               and store their prams during the day.
              A comparison of five (5) other SEQ Council’s resulted in an average parking supply of 26.4 spaces of
               which this proposed development meets.
              A slight reduction in parking supply aligns with the Plan’s Strategic Intent for Transport.
          The subject development provides for a sufficient amount of bicycle parking, along with suitable end-
           of-trip facilities, noting that the Plan’s requirement for 10 spaces is considered excessive.


                                                        Page 13

Page 14

Stockwell Development Group Pty Ltd                            SLR Ref No: 620.30735-R01-v1.0 Traffic Impact Statement
Traffic Impact Statement                                                                                20220520.docx
Noosaville Childcare Centre                                                                                  May 2022
Lot 4, Noosa Business Centre




         The proposed development’s traffic generation is considered insignificant and is unlikely to provide a
          material impact on local traffic conditions relative to the traffic demands generated by the broader
          Noosa Civic shopping centre. Consequently, a code-level assessment not including a detailed
          operational assessment of the surrounding road network is considered to be acceptable.
         The site access has been designed in accordance with Noosa’s Standard Drawing for Heavy duty vehicle
          crossing type B2 and complies with the sight distance requirements of AS2890.2.
         Pedestrian facilities have been designed to connect with the Noosa Civic shopping centre and to
          encourage active transport and public transport use.
         Refuse collection is proposed to be undertaken along Hofmann Drive to minimise interactions with
          parents, children and heavy vehicles entering the site.
         The subject development provides for one SRV parking space to facilitate the functional requirements
          of the site.
         The code responses provided at Appendix C confirm that the subject development is generally in
          accordance with the relevant requirements of the Noosa Plan 2020.




                                                     Page 14

Page 15

                                                            APPENDIX A
                                                            Development Plans




620.30735-R01-v1.0 Traffic Impact Statement
20220520.docx                                 Page 1 of 1

Page 16

                                                                                                                                                                                                                                                                                                                                                                                                                                        Indicative shade structure
                                                                                                                                                                                                                                                                                                                                                                                                                                        locations min 5% coverage
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    SITE PLAN LEGEND




                                  Boundary
                                                                                                                                                                                                                                                                                                                                                                                                                                        to playscape
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    BDY               Boundary
                                                                                                                                                                                                                                                                                                          BDY                                                                                                                                                                                                                                                       COL               Structural Column
                                                                                                                                                                                                                                                                                                          FEN - 1                                                                                                                                                                                                                                                   HR                Handrail
                                                                                                           Emt CB                                                                                                                                                                                                                                                                                                                                                                                                                                                   LOU               Louvre




                                                                                                                                                                                                                                                                    4,185
                                                                                                                                                                                         Tree 7
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    RW                Retaining Wall
                                                                                                                      Tree 6                                                                                                                                                                            Outdoor Play
                                                                                                                                                                                                                                                                                                                                                                                                                           3,087                                                                                                                                    TOW               Top of Wall
                                                                                            Tree 5                                                                                                                                                                                                                                                                                                                       FEN - 4
                                                                                                                                                                                               Turning                              STAFF                                                                                                                                                                                                                                                                                                                           FENCE TYPES

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    FEN - 1 Non Combustible
                                                                                                                                                                                    STAFF                                                                                                                                                                                                                                                                                                                                                                                   Fence TBA
                      Carpark                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       FEN - 2 Acoustic Fence




                                                                                                                                                                                                                                                                                                                                                                                                                                                       BDY
                      Shade Trees
                                                                                                                                                                                    STAFF                                                                                                                                                                                                                                                                                                                                                                                   TBA
                                                                                           Tree 4                                                                                                                                                                                                                                                                                                                                                                                                                                                                   FEN - 3 Acoustic Fence
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            TBA
                                             Proposed 3.0m Public Thoroughfare Footpath




                                                                                                                                                                                    STAFF
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    FEN - 4 Pool Fence 1.5m
                                                                                                                                                                                                                                                                                                                                                                                                                                          3,314
                                                                                                                                                                                     STAFF                                                                                                                                                                                                                                                                                                                                                                          G-1               Gate type 1

                                                                                            Tree 3                                                                                  STAFF


                                                                                                                                  Carpark




                                                                                                                                                                                                                                                                                                                                                                                                                                                                       FEN -
              Environment                                                                                                     (27 Place + SRV)
              Covenant




                                                                                                                                                                                                                                                                                                                                                                                                                                                                          1
                                                                                           Tree 2
           Pedestrian Easement




                                                                                                                                                                                                                                                           CHILDCARE (94 PLACE)
                                                                                             4m SETBACK
                                 BDY




                                                                                                                                                                                         ENTRY



                                                                                                                                                                           PWD Shared




                                                                                                                                                                                                                                                                                                                                                                                                                                                           2m SE
                                                                                                                    STAFF




                                                                                                                                                                                                                                                                                                                                                                                                                                                                 T
                                                                                                                                                                                                                                                                                                                                                                                                                                                               BACK
                                                                                                                    STAFF


                                                                                          Tree 1


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Indicative shade structure
                                                                                                          Emt CC                                                                                                                                                                                                                                                                                                                                                                                               locations min 5% coverage
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               to playscape

                                                                                                                                                           4m
                                                                                                                                                              S         ET
                                                                                                                                                                               BA




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        BDY
                                                                                                                                                                                       CK


                    Hofmann Dr


                                                                                                                                                                                                                                                                                                                                                                                                                                   Outdoor Play
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   8,979



                                                                                                                                                                                                                                Entry Arbour                                                                                                                                                                                                                                                                            Deep
                                                                                                                                                                                                                                                                                                                      4,069




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Landscaping
                                                                                                                                                                                             Pedestrian                                                                                                                                                                                                                                                                                                                 hatched
                                                                                                                                                                                             Entry Access
                                                                                                                                                                                                                                                                                                                                                                                                                 7,445




                                                                                                                                                                                                                                          Feature                                         FEN
                                                                                                                                                                                                                                          Fencing to                                                   -2
                                                                                                                                                                                                                                          Front Facade


                                                                                                                                                                                                                                                                                                                                                          BDY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Emt CD




                                                                                                                        Revision                                                                                                                                                                  Project                                                                                                            Architect                                              Stage                                                                     Project No.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Proposed Site Plan
                                                                                                                               H                            Preliminary Issue                                                                                    5/17/2022                        Sanctuary Noosa Childcare Centre                                                                                   SC                                                     Development Approval                                                      1187-05
                                                                                                                               I                            Preliminary Issue                                                                                    5/17/2022                        Lot 4 Noosa
                                                                                                                                                                                                                                                                                                  Client
                                                                                                                                                                                                                                                                                                  Stockwell Development Group Pty Ltd
                                                                                                                                                                                                                                                                                                                                                                                                                     Drawn
                                                                                                                                                                                                                                                                                                                                                                                                                     HZ
                                                                                                                                                                                                                                                                                                                                                                                                                                                                            Status
                                                                                                                                                                                                                                                                                                                                                                                                                                                                            Not For Construction (#Notes)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Scale
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      1:250 at A3
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    A-DA-01.02                                                                                          I
(07) 3251 6900 [email protected]                                                                        Elevation Architecture Pty Ltd ACN 606 170 807 © Copyright reserved this document is and shall remain the property of Elevation Architecture. Unauthorised use of this document in any form whatsoever is prohibited. All information to be printed in colour. Figured dimensions take precedence over scale dimensions. Contractors must verify all dimensions on site before commencing any work or making shop drawings.                     P:\Data 1\1187-05 Sanctuary Noosa Childcare Centre\5.2 Development Application\5.2.1 ArchiCAD\1187-05 Master DA 24.pln

Page 17

                                                               APPENDIX B
                                                            Swept Path Assessment




620.30735-R01-v1.0 Traffic Impact Statement
20220520.docx                                 Page 1 of 1

Page 18

                               LY
                          ON
                    T
                 EP
       NC
     CO




                                 L16, 175 EAGLE STREET
                                                             Project No:   620.30735          SWEPT PATH LEGEND
                                                                                                                                                                                   Stockwell
                                          BRISBANE 4000                                                  Vehicle Path
                                               AUSTRALIA     Date:         18/05/2022                    Vehicle Body
                                         T: 61 7 3858 4800                                                                                                          Noosaville Hoffman Drive Childcare Centre
                                    www.slrconsulting.com    Drawn by:     BR                            Body Clearance
                                                                                                                                         N
                                                             Scale:        AS SHOWN
                                                                                                         Front Wheels
                                                                                                                                                                           SRV Swept Path
The content contained within this document may
                                                                           A3
                                                                                                                          0.0   1.0       2.0       3.0       4.0        Space at Front, Entry
be based on third party data.                                Sheet Size:                                                                                  METRES
SLR Consulting Australia Pty Ltd does not                    Projection:   (GDA94) MGA Zone                                           SCALE 1:100
guarantee the accuracy of any such information.                                                                                                                                   FIGURE 3

Page 19

                               LY
                          ON
                    T
                 EP
       NC
     CO




                                 L16, 175 EAGLE STREET
                                                             Project No:   620.30735          SWEPT PATH LEGEND
                                                                                                                                                                                   Stockwell
                                          BRISBANE 4000                                                  Vehicle Path
                                               AUSTRALIA     Date:         18/05/2022                    Vehicle Body
                                         T: 61 7 3858 4800                                                                                                          Noosaville Hoffman Drive Childcare Centre
                                    www.slrconsulting.com    Drawn by:     BR                            Body Clearance
                                                                                                                                         N
                                                             Scale:        AS SHOWN
                                                                                                         Front Wheels
                                                                                                                                                                           SRV Swept Path
The content contained within this document may
                                                                           A3
                                                                                                                          0.0   1.0       2.0       3.0       4.0         Space at Front, Exit
be based on third party data.                                Sheet Size:                                                                                  METRES
SLR Consulting Australia Pty Ltd does not                    Projection:   (GDA94) MGA Zone                                           SCALE 1:100
guarantee the accuracy of any such information.                                                                                                                                   FIGURE 4

Page 20

                               LY
                          ON
                    T
                 EP
       NC
     CO




                                 L16, 175 EAGLE STREET
                                                             Project No:   620.30735          SWEPT PATH LEGEND
                                                                                                                                                                                   Stockwell
                                          BRISBANE 4000                                                  Vehicle Path
                                               AUSTRALIA     Date:         18/05/2022                    Vehicle Body
                                         T: 61 7 3858 4800                                                                                                          Noosaville Hoffman Drive Childcare Centre
                                    www.slrconsulting.com    Drawn by:     BR                            Body Clearance
                                                                                                                                         N
                                                             Scale:        AS SHOWN
                                                                                                         Front Wheels
                                                                                                                                                                       B85 U-Turn Manoeuvre
The content contained within this document may
                                                                           A3
                                                                                                                          0.0   1.0       2.0       3.0       4.0       Carpark Circulation
be based on third party data.                                Sheet Size:                                                                                  METRES
SLR Consulting Australia Pty Ltd does not                    Projection:   (GDA94) MGA Zone                                           SCALE 1:100
guarantee the accuracy of any such information.                                                                                                                                   FIGURE 6

Page 21

                                                            APPENDIX C
                                                                Code Responses
                                                            Driveways and Parking Code
                                                                        Transport Code




620.30735-R01-v1.0 Traffic Impact Statement
20220520.docx                                 Page 1 of 1

Page 22

Driveways and Parking Code
Table 9.4.1.3 – Criteria for assessment
Driveways Table 9.4.1.3 Criteria for assessment (part)
Performance outcomes                        Acceptable Outcomes                       Compliance   Response
                                                                                        //NA
Assessable development
Driveways
PO1                                         AO1.1                                                 Complies with AO1.1
Vehicular access does not adversely         Vehicular access is located and                        The subject development’s vehicular access is
impact on safety, capacity and operations   designed in accordance with the current                located and designed in accordance with AS2890.
of the existing or planned road network,    Australian Standards for Parking
cycleways or pedestrian pathway systems     Facilities.                                            Complies with AO1.2
                                                                                                  The subject development proposes one new
                                            AO1.2                                                  driveway crossover across a singular footpath.
                                            Only one footpath crossing is provided.
                                                                                                  Complies with AO1.3
                                            Editor’s Note — Justification for                      The proposed driveway has been designed in
                                            additional driveways may need to be                    accordance with AS2890 and Council’s Standard
                                            supported by a detailed Traffic Study.                 Drawing for Heavy Duty Vehicle Crossing Type B2.

                                            AO1.3
                                            Driveways, have a maximum grade in
                                            accordance with Council’s standard
                                            requirements
PO2                                         AO2.1                                                 Complies with AO2.1
Driveways and crossovers                    Design and construction of driveways,                  The proposed driveway has been designed in
a) are suitable and safe for their intended including across the footpath, is in                   accordance with AS2890 and Council’s Standard
     use; and                               accordance with Council Standard                       Drawing for Heavy Duty Vehicle Crossing Type B2.
b) match Council infrastructure.            Drawings as appropriate for the
                                            particular type of development as
                                            annotated on the drawings.

                                            AO2.2                                                 Complies with AO2.2
                                            The change of grades in driveways and                  The proposed driveway has been designed in
                                            ramps is in accordance with Council’s                  accordance with AS2890 and Council’s Standard
                                            Standard Drawings.                                     Drawing for Heavy Duty Vehicle Crossing Type B2.

Page 23

PO3                                            AO3.1                                              Complies with AO3.1
The number of driveways across                 Design of multi-tenanted developments               The development proposes a singular driveway
pedestrian footpaths is minimised.             include shared driveways and parking                crossover for all vehicular access.
                                               areas.

                                               AO3.2                                              Complies with AO3.2
                                               Driveways are located so they abut                  The subject development is located off Hofmann
                                               existing driveways of adjoining                     Drive in Noosaville and currently does not have
                                               development where practicable and                   neighbouring developments present.
                                               reciprocal easements are created to
                                               reduce the sealed driveway width.
PO4                                            AO4                                                Complies with AO4.1
Vehicular access does not adversely            Footpath and kerb crossings are                     Existing public footpath and kerb infrastructure is to
impact on the capacity, operations and         located clear of existing stormwater                generally remain unchanged with the subject
maintenance of the existing infrastructure.    inlet structures, water and sewerage                development in place, and therefore no new services
                                               infrastructure fittings, any other exiting          conflicts are created.
                                               utility infrastructure, existing
                                               landscaping and vegetation.
PO5                                            AO5                                                Complies with AO5.1
Vehicular access does not adversely            Vehicular access avoids disturbance to              Vegetation considerations are beyond the scope of
impact on the health and integrity of          the tree protection zone of trees on                this traffic assessment; however the proposed site is
existing landscaping or native vegetation,     public land.                                        situated within a new development area of Noosaville
where possible.                                                                                    and is clear of existing trees and vegetation.



Parking and manoeuvring                       Table 9.4.1.3 Criteria for assessment (part)
Performance outcomes                                          Acceptable Outcomes               Compliance Response
                                                                                                  //NA
Assessable development

Parking and manoeuvring

Page 24

PO6                                                           AO6.1                                             Does not comply with AO6.1
Sufficient parking                                            The number of car parking spaces,                  The subject development provides
(a) is provided having regard to the specifics of the use     motor cycle spaces, bicycle spaces                 sufficient parking for bicycles and service
     including—                                               and loading bays is not less than the              vehicles for the functional requirements of
                                                              minimum number specified in Table                  the land use. Car parking has been
     (i)    the type and intensity of land use;               9.4.1.4 Minimum parking requirements               provided with a deficit of three spaces to
                                                              including end of trip facilities.                  what’s prescribed within Table 9.4.1.4,
     (ii)   any existing parking available on the site;                                                          however, justification is provided within the
     (iii) hours of operation;                                                                                   attached Traffic Assessment report.
                                                              Editor's note— with regard to the
     (iv) likely numbers of users;                            provision of end of trip facilities, where
                                                              there is a conflict with the QDC MP 4.1
     (v) accessibility to the site by means other
                                                              for major developments the QDC
            than private motor vehicle;                       applies. For all other development
     (vi) the peak parking demand periods of uses on          Table 9.4.1.4 applies.

            the site; and                                     AO6.2                                        N/A   AO6.2 not applicable
     (vii) the availability of alternative car parking; and   Where appropriate, motorcycle spaces               The subject development is a childcare
                                                              can be provided on site in lieu of                 centre and there’s no requirement to
(b) is provided to accommodate the number and type                                                               provide motorcycle spaces.
                                                              required car parking spaces, excluding
    of vehicles and motorcycles likely to be generated
                                                              industry activities, at the following
    by the development.
                                                              rates:
                                                              (a) 2 motorcycle spaces provided for
                                                                   0.5 car parking space; or
                                                              (b) 4 motorcycles spaces provided
                                                                   per 1 car parking space; and
                                                              (c) up to a maximum of 4 car parking
                                                                   spaces.

                                                              AO6.3                                             Complies with AO6.3
                                                              Secure and convenient parking spaces               Bicycle parking has been provided in
                                                              for bicycles are designed and provided             accordance with AS2890.3 and Austroads.
                                                              on site in accordance with—
                                                              (a) AS2890.3 Bicycle Parking
                                                                   Facilities; and
                                                              (b) Cycling aspects of Austroads
                                                                   Guides (AP-G88-14).

Page 25

                                                                                                       
                                                           AO6.4                                             Complies with AO6.4
                                                           Bicycle spaces and end of trip facilities         Bicycle spaces and end of trip facilities are
                                                           need to be accessible to all users.               accessible for all users.




PO7                                                        AO7.1                                            Complies with AO7.1
The layout of the development provides adequate,           Parking bays, manoeuvring areas,                  The design of the proposed developments
clearly defined and easily accessible                      queuing areas, loading, set down,                 parking facilities are in accordance with
(a) on-site vehicle parking and manoeuvring areas;         pickup areas and driveways are                    AS2890.
                                                           designed in accordance with the
    and
                                                           Australian Standards for Parking
(b) loading and manoeuvring areas for delivery and         Facilities.
    service vehicles.
                                                           AO7.2                                       N/A   AO7.2 not applicable
                                                           Development includes purpose
                                                           designed spaces for motorcycles and
                                                           motor scooters, which are easily
                                                           identified from the driveway of the
                                                           property and located as close as
                                                           practicable to the entrance of the
                                                           building on site.

PO8                                                        AO8.1                                            Complies with AO8.1
Parking and manoeuvring areas are designed to              Parking, service areas and                        Parking, service areas and manoeuvring
(a) not unduly conflict with pedestrians; and              manoeuvring areas are setback a                   areas are setback a minimum of 2 metres
(b) be sufficiently setback from road frontages to not     minimum of 2 metres from road                     from road frontages.
                                                           frontages to allow for landscaping, with
    dominate the streetscape or surrounding areas;
                                                           the exception of Walter Hay Drive,
(c) allow for landscaping to reduce the visual impact of   Eenie Creek Road and Holts Road
    the parking, servicing and manoeuvring areas;          frontages, where no development

Page 26

(d) complement the future planned character of the       occurs within the landscaped frontage
    area; and                                            setbacks.
(e) avoid development within the Walter Hay Drive,                                                  N/A   AO8.2 not applicable
                                                         AO8.2                                            The subject development is not located
    Eenie Creek Road and Holts Road frontage
                                                         In Centre zones, parking, service and            within a Centre zone.
    setbacks.                                            manoeuvring areas are either
                                                         integrated within or under buildings and
                                                         sleeved by usable floor space, or
                                                         located to the rear of buildings.

                                                         Editor's note— Refer to Figure AP3-
                                                         11A and Figure AP3-11B for outcomes
                                                         for car parking in centres.
                                                                                                    N/A   AO8.3 not applicable
                                                                                                          Vehicular access via a rear lane is not
                                                         AO8.3
                                                                                                          practical in this instance.
                                                         Where practicable vehicle access is
                                                         from rear laneways
PO9                                                      AO9                                             Complies with AO9
On-site car parking spaces are identified and reserved   Car parking spaces are provided for              AS2890.6 defers to the Building Code of
for people with disabilities.                            people with disabilities at the rate             Australia with regard to the provision of
                                                         specified in the current Australian              parking for Persons with a Disability
                                                         Standards for Parking Facilities                 (PWD). Section 4 of the attached traffic
                                                                                                          assessment confirms that the proposed
                                                                                                          PWD parking provision aligns with the
                                                                                                          requirements specified therein.
PO10                                                     AO10                                            Complies with AO10
Access and egress points do not impact on the safety     Vehicle manoeuvring areas are                    Vehicle manoeuvring areas have been
and operations of the road system.                       provided in accordance with the current          provided in accordance with AS2890.
                                                         Australian Standards Australian
                                                         Standards for Parking Facilities so
                                                         vehicles enter and leave the site in a
                                                         forward gear, excluding dual occupancy
                                                         or detached dwellings on local roads.
PO11                                                     AO11                                            Complies with AO11
Parking areas are designed to                            At locations where pedestrian and                The subject development proposes
                                                         vehicle conflicts are likely to occur:           separate pedestrian and vehicle accesses.

Page 27

a)   provide a progressive reduction in speed between        a)    sight distances of at least 2.5             Where conflicts may occur, these areas are
     the external road and internal parking spaces;                seconds travel time at the                  clear of any obstructions and encourage
b)   ensure lower speeds near areas of high pedestrian             designated speed are provided;              slow vehicle speeds.
     activity through the use of appropriate road            b) splayed corners on structures are
     geometry or devices designed to limit speed; and              incorporated;
c)   maintain sight distances which are appropriate for      c)     landscaping is designed to allow
     the likely operating speeds in all areas of potential         clear views; and
     pedestrian/vehicle conflict.                            d) sign placement ensures that sight
                                                                   distance requirements are not
                                                                   impeded.
 PO12                                                        AO12.1                                      N/A   AO12.1 not applicable
 A clearly defined pedestrian network is provided that –     In large open carparks with greater than          The subject development does not
(a) is located in areas where people will choose to walk;    200 car parking spaces, a pedestrian              propose a large open carpark with greater
(b) ensures that pedestrian movement through car             path between parking spaces is                    than 200 car parking spaces.
                                                             provided on every second aisle.
    parking areas or structures are along aisles rather
    than across them.                                                                                         Complies with AO12.2
                                                             AO12.2                                            Approximately 12 of a total of 27 car
             .                                               For a minimum of 50% of car parking               parking spaces are located so that people
                                                             spaces, pedestrian access to buildings
                                                                                                               accessing the buildings may need to cross
                                                             is not across or through driveways,
                                                                                                               the centre parking aisle, which is less than
                                                             carparks, setdown or manoeuvring
                                                             areas.                                            50%.
PO13                                                         No acceptable outcome provided                   Complies with PO13
Provision is made for pedestrian and vehicular queues at                                                       Sufficient space is provided to
conflict points.                                                                                               accommodate pedestrian and vehicular
                                                                                                               queuing at conflict points.
PO14                                                         AO14                                        N/A   AO14 not applicable.
Parking areas are lit to provide security for night-time     Lighting is provided in accordance with           Lighting considerations are beyond the
users.                                                       the Australian Standard for Road                  scope of this traffic assessment.
                                                             Lighting - Vehicular Traffic (Category
                                                             V) Lighting - Performance Installation
                                                             and Design Requirements.
PO15                                                         AO15                                        N/A   AO15 not applicable
Site facilities encourage users and employees                End-of-trip facilities are maintained and         End-of-trip facilities are provided for
to access the site by means of foot or bicycle through       accessible to all users of the premises           childcare centre staff while bicycle parking
                                                             as part of common property.                       is provided for all users. Parents dropping

Page 28

provision of appropriate end of-trip facilities including                                                     off their children are likely not to require
bicycle parking and shower/change rooms.                                                                      end-of-trip facilities.



PO16                                                           No acceptable outcome provided           N/A   PO16 not applicable
Development with the potential to generate significant                                                        The subject development is not considered
traffic and parking impacts gives appropriate                                                                 to be of a use and size which would
consideration to transport and land use issues.                                                               generate significant traffic and parking
                                                                                                              impacts relative to those generated by the
Editor’s Note—A detailed Traffic Impact                                                                       broader Noosa Business Centre in which it
Assessment Report may be required.
                                                                                                              is located.
PO17                                                           AO17.1                                   N/A   AO17.1 not applicable
Parking and manoeuvring areas are designed to ensure           Development providing less than five           Stormwater management considerations
run-off is treated to remove pollutants prior to leaving the   car parking spaces is designed so that         are beyond the scope of this traffic
premises.                                                      the driveway, parking and manoeuvring          assessment.
                                                               areas are formed to drain to
                                                               landscaped areas.

                                                               AO17.2
                                                                                                        N/A   AO17.2 not applicable
                                                               Development providing five or more car
                                                               parking spaces is designed to                  Stormwater management considerations
                                                               incorporate stormwater treatment               are beyond the scope of this traffic
                                                               methods to remove water contaminants           assessment.
                                                               likely to runoff from the general
                                                               operation of the of the driveway,
                                                               parking and manoeuvring areas.

                                                                Editor’s Note—Further details are
                                                               provided in the Water Quality and
                                                               Drainage Code.

PO18                                                           No acceptable outcome provided           N/A   PO18 not applicable
Parking areas are designed to ensure drainage without                                                         Stormwater management considerations
the use of pumps or other electrical apparatus.                                                               are beyond the scope of this traffic
                                                                                                              assessment.

Page 29

PO19                                                AO19                                      N/A   AO19 not applicable
Site layout and building design provides for soft   Below ground components of buildings,           Landscaping considerations are beyond
landscaping to be established.                      including carparks, do not extend               the scope of this traffic assessment.
                                                    beyond the above ground footprint to
                                                    allow for the provision of landscaping,
                                                    particularly within building setbacks.

Page 30

Transport Code
Table 9.4.7 – Criteria for Assessable development
Strategic transport network                    Table 9.4.7.3 Criteria for assessable development (part)
Performance outcomes                          Acceptable Outcomes                      Compliance   Response
                                                                                         //NA
Strategic Transport Network
PO1                                           AO1.1                                                Complies with PO1
Traffic generation from development is        Where the development leads to the                    The attached traffic assessment prepared by SLR
considered in a localised and a Shire wide    need to increase transport                            Consulting suggests that the peak traffic generation
context to ensure that—                       infrastructure in the Shire, the                      potential of the subject development is expected to
                                              development contributes to the                        be immaterial relative to that generated by the
(a) the transport network has the capacity    transport network in accordance                       broader Noosa Business Centre. Consequently, no
    to safely and efficiently accommodate     with Council’s infrastructure network                 transport infrastructure upgrades are considered
    projected movements;                      planning.
                                                                                                    necessary to support the subject development.
(b) development does not have an adverse
                                              Editor’s Note— Council may require
    impact upon the functioning of the road   the preparation of a Transport Impact
    network; and                              Assessment Report.
(c) development includes measures to
    improve transport options rather than   AO1.2
    relying on the widening of roads.       Development provides for high trip
                                            generating land uses, such as higher
                                            density residential development and
                                            employment generators, to be located
                                            in and around activity centres and
                                            around major public transport hubs.
PO2                                         AO2.1                                                  Complies with PO2
Development respects the road hierarchy and Arterial and distributor roads are                      The subject development makes use of existing
supports the intended function of adjacent  designed so they can operate with                       road accesses and therefore does not impact on the
and nearby roads.                           acceptable volumes of traffic during                    function of any public roads.
                                            peak times.
Editor’s Note — The Noosa Shire road
hierarchy is depicted on Regional           AO2.2
Infrastructure Overlay Maps.                Collector and local streets are provided
                                            to support short trips for local traffic

Page 31

                                              moving in and between
                                              neighbourhoods.

                                              AO2.3
                                              Local streets are designed to
                                              discourage through traffic and traffic is
                                              channelled towards collector streets to
                                              ensure that traffic volumes on local
                                              streets are kept low.

                                              AO2.4
                                              A collector street is provided parallel to
                                              arterials particularly where they pass
                                              through centres.

                                              AO2.5
                                              Appropriate width of road and verge is
                                              provided to allow streets to perform
                                              their designated functions in the street
                                              network.

 PO3                                            No acceptable outcome provided                       Complies with PO3
 Development access does not compromise                                                               The subject development’s proposed access does
 the functions of particular roads as indicated                                                       not compromise the function of Hofmann Drive, nor
 in the road hierarchy, and does not adversely                                                        does it impact on safety, capacity and operations.
 impact on the safety, capacity and operations
 of the road system.


Transport Connectivity                    Table 9.4.7.3 Criteria for assessable development (part)
 Performance outcomes                     Acceptable Outcomes                              Compliance Response
                                                                                             //NA
 Strategic Transport Network
 PO4                                      No acceptable outcome provided                             Complies with PO4
 The transport network, including roads
 and pathways, has high levels of

Page 32

connectivity, both within the                                                                      The subject development provides direct vehicular,
development site and to the surrounding                                                            pedestrian and cycle connections to the external
area.                                                                                              network.
PO5                                       AO5.1                                                   Complies with A05.1
Development is designed to facilitate     Development is designed and arranged to:                 The subject development includes provision of
efficient, safe and accessible bus                                                                 direct pathway connections to the site’s road
services that connect to existing and     (a)   provide on-site or off-site public                 frontages.
future public passenger transport               transport facilities, having regard to the
facilities.                                     specific nature and scale of
                                                development, and the number of
                                                people involved in the use;
                                          (b)   provide convenient and attractive
                                                linkages to existing and proposed
                                                public transport facilities; and
                                          (c)   maximise accessibility for all
                                                anticipated users.

                                          AO5.2
                                                                                             N/A   AO5.2 not applicable
                                          Roads catering for buses are:
                                                                                                   The subject development proposes to utilise existing
                                          (a)   arterial, distributor, or collector roads;         road infrastructure.
                                          (b)   roads which provide highly accessible
                                                routes;
                                          (c)   roads that provide for the shortest and
                                                most direct route for an efficient public
                                                transport service; and
                                          (d)   roads that can efficiently service
                                                adjoining development areas.

                                          AO5.3                                              N/A   AO5.3 not applicable
                                          Roads catering for buses provide convenient              The subject development proposes to utilise existing
                                          connections to existing and future public                road infrastructure.
                                          passenger transport facilities.
                                                      ss

Page 33

                                           AO5.4                                           N/A   AO5.4 not applicable
                                           Bus routes are located to maximise patron             The subject development does not propose any
                                           catchment and to consider personal safety,            changes to existing public transport operations.
                                           lighting and traffic management.
                                                                                                Complies with AO5.5
                                           AO5.5                                                 The subject development does not modify existing
                                           Development on bus routes does not impact
                                                                                                 public transport infrastructure or hinder public
                                           on bus stop infrastructure or the efficient
                                                                                                 transport operations.
                                           running of bus services.

                                           AO5.6                                           N/A   AO5.6 not applicable
                                           Roads catering for buses are designed and             The subject development proposes to utilise existing
                                           constructed in accordance the relevant State          road infrastructure.
                                           government standards.

                                            Editor’s Note — Queensland’s Department
                                            of Transport and Main Roads, and the
                                            TransLink division within the Department
                                            have design standards for public transport
                                            networks and infrastructure
PO6                                        AO6.1                                                Complies with AO6.1
Development enhances connectivity          Development provides direct and convenient            The subject development includes provision of
between existing and future public         pathway linkages between existing and                 direct pathway connections to the site’s road
passenger transport facilities and other   future public passenger transport facilities.         frontages.
transport modes.
                                           AO6.2                                                Complies with AO6.2
                                           Development provides wayfinding
                                                                                                 The subject development provides a 3m shared
                                           information for existing public transport
                                           facilities and interconnecting transport              path providing connections to the existing Noosa
                                           modes.                                                Civic shopping centre to the north. Wayfinding
                                                                                                 signage will be located along this shared path.
                                           Editor’s Note— Council has design
                                           standards that apply to wayfinding signage

Page 34

Pedestrian and cycle infrastructure                      Table 9.4.7.3 Criteria for assessable development (part)
 Performance outcomes                     Acceptable Outcomes                          Compliance Response
                                                                                         //NA
 Pedestrian and cycle infrastructure
 PO7                                      No acceptable outcome provided                         Complies with PO7
 Road planning and development designs                                                            The subject development provides connecting
 for pedestrian and cycle movements and                                                           active transport facilities to the existing external
 provides for future connectivity and                                                             network. It does not hinder, rather accommodates
 integration with adjoining sites.                                                                future active transport linkages.
 PO8                                      AO8                                             N/A     PO8 not applicable
 Development provides for cyclists on     Roads provide for on-road cycling in                    The subject development does not propose any
 roads as required for each category of   accordance with the standards specified in              new public roads.
 road as identified in the Noosa Road     Council’s Planning Scheme Policy PSP6
 Hierarchy.                               Engineering Design Standards – Roads,
                                          drainage and earthworks.
 PO9                                      AO9.1                                                  Complies with AO9.1
 Development is designed to encourage     Pathway planning and design is in                       Pedestrian and cycling facilities are designed in
 walking and cycling wherever possible    accordance with pedestrian and cycling                  accordance with Austroads Guidelines.
 over the use of private vehicles         aspects of Austroads Guides.

                                          AO9.2                                           N/A     AO9.2 not applicable
                                          Attractive and safe pedestrian and cycle                Architectural considerations are beyond the scope
                                          connections to and through the site are                 of this traffic assessment.
                                          provided with shade trees, graded walking
                                          and cycle paths and lighting.

                                          AO9.3                                                  Complies with AO9.3
                                          Pathways are provided to cater for shared               A shared path is proposed as part of the
                                          use and cater for both commuting and                    development to cater for shared uses.
                                          recreational usage.

                                          AO9.4                                           N/A     AO9.4 not applicable
                                          Pathways have ramps at all kerbs designed               Subject development does not propose new roads.
                                          for wheelchair and pram access across
                                          roads.

Page 35

AO9.5                                              Complies with AO9.5
Development has convenient and prominent            Subject development proposes a direct pedestrian
pedestrian entrances that:                          entrance from Hofmann Drive and caters for
                                                    universal access.
(a)   are oriented towards the street; and
(b)   cater for universal access.

AO9.6                                         N/A   AO9.6 not applicable
Pathways are adequately lit and have                Architectural considerations are beyond the scope
navigational signs.                                 of this traffic assessment.

AO9.7                                         N/A   AO9.7 not applicable
Pedestrian and cycle pathways are                   Civil engineering design is beyond the scope of this
designed and constructed to:                        traffic assessment.
 (a) provide a stable, smooth surface,
     including across driveways, sections
     and joins;
(b) be easily maintained;
(c) have a width with longitudinal gradient
     to cater for projected usage;
(d) provide clear sight-lines for safe use;
     and
(e) be free of any obstructions such as
     fences, signage and bollards

                                                   Complies with AO9.8
AO9.8
                                                    Pedestrian routes are designed to avoid where
Pedestrian routes border the frontages of
                                                    possible travelling through car parking areas and at
residential land, public parks and business
                                                    the rear of the lot.
uses with routes through parking lots or at
the rear of lots avoided.

Page 36

Road Design and Construction                     Table 9.4.7.3 Criteria for assessable development (part)
Performance outcomes                        Acceptable Outcomes                         Compliance Response
                                                                                          //NA
Road Design and Construction
PO10                                       AO10                                            N/A     AO10 not applicable
Roads and pathways are planned and         Road planning and design is in accordance               Civil engineering design is beyond the scope of this
designed to support the function of        with Council’s Planning Scheme Policy PSP6              traffic assessment.
the road hierarchy and ensure that—        Engineering Design Standards – Roads,
                                           drainage and earthworks.
(a) design and alignment of roads,
    intersections and all associated
    works —
    (i)    convey the primary function
           of each type of street;
    (ii)   provide a safe environment
           for all users;
    (iii) are adequate for the design
           speed environment;
    (iv) are adequate for predicted
           traffic volumes;
    (v)    maintains the safe and
           efficient functioning of the
           road network incorporating
           roundabouts as a preference
           to T intersections;
    (vi) are compatible with existing
           infrastructure;
    (vii) are easily maintained by
           Council equipment; and
    (viii) where appropriate, have the
           ability to accommodate public
           transport services;

(b) road pavement surfaces —
     (i)  are durable enough to carry
          estimated wheel loads of

Page 37

           travelling and parked
           vehicles;
    (ii)   provide for the safe passage
           of vehicles, pedestrians,
           cyclists, and discharge of
           stormwater run-off from
           contributing catchments and
           the preservation of all-
           weather access;

(c) kerb and channel—
     (i)  controls vehicle movement by
          delineating the carriageway
          for all users;
     (ii) conveys road pavement run-
          off to stormwater drainage in
          a manner that allows the road
          to be trafficable in 1%AEP
          local rainfall events; and

(d) verges and footpaths provide—
    (i)   safe access for pedestrians
          and cyclists clear of
          obstructions;
    (ii)  an access area for vehicles
          onto properties;
    (iii) a corridor allocated for
          services and utilities; and
    (iv) additional amenity for minor
          roads.

Page 38

Activity Centres and Community Facilities                            Table 9.4.7.3 Criteria for assessable development (part)
 Performance outcomes                         Acceptable Outcomes                               Compliance Response
                                                                                                  //NA
 Activity Centres and Community Facilities
 PO11                                       AO11.1                                                        Complies with AO11
 All key destinations such as activity      Adjoining and within 200 metres of activity                    The subject development proposes pathway
 centres, educational establishments,       centres, educational establishments,                           networks designed for pedestrians and cyclists, that
 community facilities, aged car facilities, community facilities, beaches and sports                       provide direct access to transit opportunities to the
 beaches and sports grounds can be          grounds:                                                       north at the existing Noosa Civic shopping centre.
 reached by a range of travel modes
 including public transport, walking,       (a) road and pathway networks are
 cycling, taxis, and shared and private          designed for safe pedestrian and cyclist
 vehicles.                                       movement;
                                            (b) pathways provide direct pedestrian and
                                                 cyclist access to focal points and transit
                                                 opportunities;
                                            (c) designated bus stops, taxi and shared
                                                 vehicle set down facilities are provided.

                                            AO11.2                                                        Complies with AO11.2
                                            On-street parking, drop-off, access to parking                 Walking and cycling safety and amenity is not
                                            and loading facilities and vehicle                             compromised by the subject development.
                                            manoeuvring do not compromise walking and
                                            cycling safety and amenity.

                                            AO11.3                                                 N/A     AO11.3 not applicable
                                            Roads that function as main streets within an                  The subject development does not propose any
                                            activity centre are designed to facilitate active              new roads.
                                            frontages through means such as wide
                                            footpaths and slow speed environments.

                                            AO11.4                                                 N/A     AO11.4 not applicable
                                            Commercial sites fronting main streets,                        The subject development does not propose a
                                            including Sunshine Beach Road, Poinciana                       commercial use.
                                            Avenue, Maple Street and Diamond Street,

Page 39

are provided with access from rear lanes or
other access streets for service vehicles and
to parking areas, to reduce potential conflicts
with pedestrians and cyclists by having
driveways to these streets.
                                                        AO11.5 not applicable
AO11.5                                            N/A   The subject development does not propose any
Taxi or shared vehicle infrastructure is                new road infrastructure.
provided parallel to the kerb, conveniently
located to minimise passenger walking and
designed in accordance with:

(a)    AS2890.5–1993 Parking facilities –
       on-street parking and AS1428.1–
       2009 Design for access and mobility
       – general requirements for access –
       new building work;
(b)    AS1742.11–1999 Parking controls –
       manual of uniform traffic control
       devices;
(c)    AS/NZS 2890.6–2009 Parking
       facilities – of-street parking for
       people with disabilities;
(d)    Disability standards for accessible
       public transport 2002 made under
       section 31(1) of the Disability
       Discrimination Act 1992; and
(e)    AS/NZS 1158.3.1 – Lighting for
       roads and public spaces, Part 3.1:
       Pedestrian area (category P) lighting
       – Performance and design
       requirements.

Page 40

Environmental Protection                       Table 9.4.7.3 Criteria for assessable development (part)
Performance outcomes                     Acceptable Outcomes                             Compliance Response
                                                                                           //NA
Environmental Protection
PO12                                    AO12.1                                              N/A     PO12 not applicable
Road infrastructure is located and      Roads follow the edge of existing disturbed                 The subject development does not propose any
aligned so as to—                       areas, or alternatively, these works are co-                new road infrastructure.
(a)     minimise disturbance to         located with other services within a combined
        native vegetation and/or        utility corridor.
        other habitat areas;
(b)     protect and maintain wildlife   AO12.2
        corridor movements and the      Low impact construction techniques are used
        safety of native fauna;         around areas of vegetation to be retained to
(c)     provide for compensatory        minimise interference with the vegetation.
        habitat establishment and
        maintenance;                    AO12.3
(d)     minimise changes to the         Roads avoid native vegetation and provide
        hydrological regime,            appropriate fauna movement corridors and
        including drainage patterns,
                                        protection measures.
        run-off and water quality;
(e)     avoid crossing
                                        Editor’s Note— Measures may include fauna
        watercourses, drainage lines
                                        underpasses, ropes, fencing and the like.
        and wetlands, but where
        such crossing are
        unavoidable, disturbed          AO12.4
        areas are reinstated and        Road infrastructure within or adjacent to
        revegetated on completion       native habitat incorporates fences which allow
        of works; and                   for protected wildlife movement and controls
(f)     minimise bulk earthworks.       unrestricted access of domestic cats and
                                        dogs.

                                        AO12.5
                                        Native vegetation is protected
                                        from clearing or construction activities by—
                                         (a)    clearly marking vegetation to be
                                                retained with flagging tape;

Page 41

                                         (b)    installing protective fencing around
                                                the dripline of vegetation; and
                                         (c)    ensuring stock pling, storage and
                                                vehicle parking occur outside the
                                                areas of vegetation to be retained.
                                         AO12.6
                                         Where clearance of habitat is unavoidable,
                                         once the area disturbed by the works is re-
                                         established, replacement habitat is planted
                                         in proximity of the works to create native
                                         fauna habitat suitable for the area and
                                         maintained for the life of the works.
 PO13                                    AO13                                             N/A     PO13 not applicable
 Road infrastructure is constructed to   Road infrastructure is constructed in                    The subject development does not propose any
 minimise adverse environmental          accordance with Council’s Planning                       new road infrastructure.
 impacts, including from run-off and     Scheme Policy PSP6 Engineering Design
 erosion                                 Standards – Roads, drainage and earthworks


External Works and Infrastructure               Table 9.4.7.3 Criteria for assessable development (part)
 Performance outcomes                     Acceptable Outcomes                          Compliance Response
                                                                                         //NA
 External Works and Infrastructure
 PO14                                    AO14                                             N/A     PO14 not applicable
 Development is provided with external   Where not already existing, the following                Civil engineering design is beyond the scope of this
 works—                                  infrastructure components are provided at                traffic assessment.
 (a)    along the full extent of the     the frontage of the site—.
        frontage of the site to an
        appropriate standard having      (a)   full width sealed road;
        regard to the specified          (b)   concrete kerb and channel where
        function of the road; and              appropriate;
  (b)   provided beyond the site’s       (c)   forming and grading to footpaths;
        frontage if required.            (d)   vehicular kerb and footpath
                                               crossing;
                                         (e)   a constructed bikeway;

Page 42

                                            (f)   a constructed footpath;
                                            (g)   a constructed carriageway;
                                            (h)   required alterations to public utility
                                                  mains, services or installations;
                                            (i)   construction of any required
                                                  alterations to public utility mains,
                                                  services of installations;
                                            (j)   stormwater drainage works; and
                                            (k)   installation of electrical condults.
 PO15                                       No acceptable outcome provided                    N/A     PO15 not applicable
 Any alterations or repairs to                                                                        Civil engineering aspects are beyond the scope of
 infrastructure as a result of the                                                                    this traffic assessment.
 development are made at no cost to
 Council.
 PO16                                       No acceptable outcome provided                    N/A     PO14 not applicable
 Road infrastructure is proven to be                                                                  Civil engineering aspects are beyond the scope of
 suitable for its use prior to Council                                                                this traffic assessment.
 accepting the dedicated asset.


Staged development Table 9.4.7.3 Criteria for assessable development (part)
 Performance outcomes                         Acceptable Outcomes                          Compliance Response
                                                                                             //NA
 Staged development
 PO17                                       No acceptable outcome provided                    N/A     PO17 not applicable
 Staged development is planned,                                                                       Civil engineering aspects are beyond the scope of
 designed and constructed to ensure                                                                   this traffic assessment.
 that—
(a)    each stage of the development
       can be constructed without
       interruption to services and
       utilities provided to the previous
       stages;

Page 43

(b)   the infrastructure provided is
      capable of servicing the
      entire development; and
(c)   the materials used are
      consistent throughout the
      development.

Page 44

ASIA PACIFIC OFFICES

ADELAIDE                       BRISBANE                        CAIRNS                         CANBERRA
60 Halifax Street              Level 16, 175 Eagle Street      Level 1 Suite 1.06             GPO 410
Adelaide SA 5000               Brisbane QLD 4000               Boland’s Centre                Canberra ACT 2600
Australia                      Australia                       14 Spence Street               Australia
T: +61 431 516 449             T: +61 7 3858 4800              Cairns QLD 4870                T: +61 2 6287 0800
                               F: +61 7 3858 4801              Australia                      F: +61 2 9427 8200
                                                               T: +61 7 4722 8090


DARWIN                         GOLD COAST                      MACKAY                         MELBOURNE
Unit 5, 21 Parap Road          Level 2, 194 Varsity Parade     21 River Street                Level 11, 176 Wellington Parade
Parap NT 0820                  Varsity Lakes QLD 4227          Mackay QLD 4740                East Melbourne VIC 3002
Australia                      Australia                       Australia                      Australia
T: +61 8 8998 0100             M: +61 438 763 516              T: +61 7 3181 3300             T: +61 3 9249 9400
F: +61 8 9370 0101                                                                            F: +61 3 9249 9499


NEWCASTLE CBD                  NEWCASTLE                       PERTH                          SYDNEY
Suite 2B, 125 Bull Street      10 Kings Road                   Grd Floor, 503 Murray Street   Tenancy 202 Submarine School
Newcastle West NSW 2302        New Lambton NSW 2305            Perth WA 6000                  Sub Base Platypus
Australia                      Australia                       Australia                      120 High Street
T: +61 2 4940 0442             T: +61 2 4037 3200              T: +61 8 9422 5900             North Sydney NSW 2060
                               F: +61 2 4037 3201              F: +61 8 9422 5901             Australia
                                                                                              T: +61 2 9427 8100
                                                                                              F: +61 2 9427 8200
TOWNSVILLE                     WOLLONGONG
12 Cannan Street               Level 1, The Central Building
South Townsville QLD 4810      UoW Innovation Campus
Australia                      North Wollongong NSW 2500
T: +61 7 4722 8000             Australia
F: +61 7 4722 8001             T: +61 2 4249 1000


AUCKLAND                       NELSON                          WELLINGTON
Level 4, 12 O'Connell Street   6/A Cambridge Street            12A Waterloo Quay
Auckland 1010                  Richmond, Nelson 7020           Wellington 6011
New Zealand                    New Zealand                     New Zealand
T: 0800 757 695                T: +64 274 898 628              T: +64 2181 7186


SINGAPORE
39b Craig Road
Singapore 089677
T: +65 6822 2203

Used in these records

About this file

File size
5.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Item 13 Appendix F - Traffic Impact Statement-1.0.pdf · 5.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.