Item 13 Appendix F - Traffic Impact Statement-1.0 · MCU22/0094
(f) a constructed footpath;
(g) a constructed carriageway;
(h) required alterations to public utility
mains, services or installations;
(i) construction of any required
alterations to public utility mains,
services of installations;
(j) stormwater drainage works; and
(k) installation of electrical condults.
PO15 No acceptable outcome provided N/A PO15 not applicable
Any alterations or repairs to Civil engineering aspects are beyond the scope of
infrastructure as a result of the this traffic assessment.
development are made at no cost to
Council.
PO16 No acceptable outcome provided N/A PO14 not applicable
Road infrastructure is proven to be Civil engineering aspects are beyond the scope of
suitable for its use prior to Council this traffic assessment.
accepting the dedicated asset.
Staged development Table 9.4.7.3 Criteria for assessable development (part)
Performance outcomes Acceptable Outcomes Compliance Response
//NA
Staged development
PO17 No acceptable outcome provided N/A PO17 not applicable
Staged development is planned, Civil engineering aspects are beyond the scope of
designed and constructed to ensure this traffic assessment.
that—
(a) each stage of the development
can be constructed without
interruption to services and
utilities provided to the previous
stages;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Item 13 Appendix F - Traffic Impact Statement-1.0.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.