Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Item 13 Appendix F - Traffic Impact Statement-1.0 · MCU22/0094

of 44

Text shows just the words. Original shows the document exactly as it was published.

                                            (f)   a constructed footpath;
                                            (g)   a constructed carriageway;
                                            (h)   required alterations to public utility
                                                  mains, services or installations;
                                            (i)   construction of any required
                                                  alterations to public utility mains,
                                                  services of installations;
                                            (j)   stormwater drainage works; and
                                            (k)   installation of electrical condults.
 PO15                                       No acceptable outcome provided                    N/A     PO15 not applicable
 Any alterations or repairs to                                                                        Civil engineering aspects are beyond the scope of
 infrastructure as a result of the                                                                    this traffic assessment.
 development are made at no cost to
 Council.
 PO16                                       No acceptable outcome provided                    N/A     PO14 not applicable
 Road infrastructure is proven to be                                                                  Civil engineering aspects are beyond the scope of
 suitable for its use prior to Council                                                                this traffic assessment.
 accepting the dedicated asset.


Staged development Table 9.4.7.3 Criteria for assessable development (part)
 Performance outcomes                         Acceptable Outcomes                          Compliance Response
                                                                                             //NA
 Staged development
 PO17                                       No acceptable outcome provided                    N/A     PO17 not applicable
 Staged development is planned,                                                                       Civil engineering aspects are beyond the scope of
 designed and constructed to ensure                                                                   this traffic assessment.
 that—
(a)    each stage of the development
       can be constructed without
       interruption to services and
       utilities provided to the previous
       stages;

Used in these records

About this file

File size
5.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Item 13 Appendix F - Traffic Impact Statement-1.0.pdf · 5.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.