Council archive · source document
Item 13 Appendix F - Traffic Impact Statement-1.0 · MCU22/0094
Stockwell Development Group Pty Ltd SLR Ref No: 620.30735-R01-v1.0 Traffic Impact Statement
Traffic Impact Statement 20220520.docx
Noosaville Childcare Centre May 2022
Lot 4, Noosa Business Centre
1 Introduction
SLR Consulting Australia Pty Ltd (SLR) has been engaged by Stockwell Development Group Pty Ltd (Stockwell) to
provide traffic engineering advice and prepare a Traffic Impact Statement (TIS) as part of a proposed childcare
centre to be located on Lot 4 within the Noosa Business Centre in Noosaville. Plans of the proposal are provided
at Appendix A for reference.
The intent of this TIS is to document this advice and assess the consistency of the proposed works against
relevant design standards and good engineering practice to inform Noosa Shire Council’s assessment of a
planning application to facilitate the subject development. Specifically, this document considers the car parking,
access and servicing treatments proposed for the subject site.
2 Subject Site
2.1 Site Context
The subject site is located on Lot 4 within the broader Noosa Business Centre development and fronts an
extension of Hofmann Drive which is currently under construction. Ultimately, Hofmann Drive will be extended
to connect with Walter Hay Drive to the east in addition to the current connection to Eenie Creek Road to the
north, with the site also bound by open space (protected via covenant) and a pedestrian access easement to the
northwest, Lot 3 to the north and Lot 5 to the east. It is understood that Lot 5 is intended to be developed to
provide a swim school, with the ultimate use of Lot 3 unknown at the time of writing.
The location of the subject site is shown in Figure 1, with the development within the local government
jurisdiction of Noosa Shire Council (Council). Accordingly, a review of Council’s Enterprise Mapping System
suggests that the subject site is located within Precinct 5A – Business Park Precinct of the Noosa Business Centre
Precinct.
Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Item 13 Appendix F - Traffic Impact Statement-1.0.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.