NOOSA COUNCIL IDAS Development Application Decision Notice                                                            5


26.       Each water connection to the water reticulation system shall extend to the property boundary and be
          metered. Where multiple units are served by a single service, multiple water meters to each individual
          unit shall be installed. All fees for the supply of water meters shall be paid to the Council.

          Service Easements

27.       A registered easement shall be created over the existing sewer main that crosses the northern portion of
          the site. The easements shall generally be parallel to and centred over the sewer main and be equivalent
          in width to twice the depth to invert level of the sewer at the deepest point within the allotment (measured
          from the finished surface) and be no less than 3.0 metres wide.
          In this regard, plans submitted for Operational Works approval shall accurately show the location of the
          easement.
          In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in
          writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any
          additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly.
          A duly executed copy of the easement shall be submitted to Council for perusal prior to the use
          commencing.
          Any changes required by Council’s Solicitor must be corrected immediately.

28.       No building or other structure shall be constructed or encroach over an easement. Any building or
          structure within proximity of an easement or any other public utility’s underground must have its
          foundations designed so that no surcharge loads are imposed upon such underground infrastructure.
          Foundations must be taken down a minimum of 1 metre below a line of influence measured 1 metre in the
          direction of the foundation from the centreline of the closest underground service and along the natural
          angle of repose of the foundation soil type(s).
          Plans, and supportive documents, detailing these proposed foundations shall be designed by a registered
          practising Geotechnical Engineer and submitted with the application for a Development Permit for
          Operational Works.

          Headworks

29.       Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30
          on Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at
          the rates applicable at the time of payment. An estimate only of the contribution rates as of March 2003
          under the current policies is as follows:

          Water Supply               $3,635

          Sewerage                   $2,745

          TOTAL                      $6,380
          All headworks contributions must be paid prior to the issue of a Development Permit for Operational
          Works.
          Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks
          contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full.
          In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
          the contribution or trading bank guarantee will be returned.

          Erosion and Sediment Control

30.       Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
          control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
          waste, will be necessary.
          In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
          to the Council for approval prior to obtaining a Development Permit for Operational Works.
          Please note that prior to the commencement of any work on site all site control measures shall be
          installed and the approved plan adhered to.




H o:\database\onestop\decision.doc

Used in these records

About this file

File size
44 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED - COMPLIED Decision Notice [As Published].pdf · 44 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.