2017-11-13 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 13 NOVEMBER 2017
DA-07.1216.3D D Roof plan prepared by Andrew McKellar 14.06.2017
Design
DA-07.1216.4D D Elevations prepared by Andrew McKellar 14.06.2017
Design
DA-07.1216.5D D Sections prepared by Andrew McKellar June 2017
Design
DA-07.1216.6D D Sections prepared by Andrew McKellar June
Design
Nature and Extent of Approved Use
2. The approved use must not operate outside the hours of:
a. 6am to 10pm Monday to Thursday
b. 6am to 12pam Friday and Saturday
c. 6am to 10pm Sunday or any public holiday
The requirements of this condition must be included in the Community
Management Statement for any body corporate for the subject site.
3. The outdoor dining areas must not exceed 30m2 and 35m2 as shown on the
approved plans and must not be used after 10pm each night.
4. The approved uses must not cause nuisance as a result of noise emission.
5. Entertainers or speakers used to amplify noise must not be located in any
outdoor, verandah, patio, footpath or beer garden area of the premises.
Building Appearance
6. Ground floor shopfront glazing along the frontages must be fully transparent to a
minimum of 6550% of the street frontage to allow passive surveillance and
encourage social interaction, and must be provided at full height (floor to ceiling).
7. The external finishes of the building must include a mix of materials, variation in
roof form and extensive eaves as shown on the Approved Plans.
8. All mechanical equipment and other service infrastructure located on the site
must be:
a. located not less than 2 metres from a property boundary
b. fully enclosed or screened such that they are not visible from the street
frontages nor adjoining properties. Where screened by landscaping,
landscaping beds must be at least 1.5 metres wide.
Soil Contamination
9. As part of any Operational Works application for the site a detailed site
contamination assessment report prepared by a suitably qualified and
experienced person in accordance with the procedures and practices detailed in
the National Environment Protection (Assessment of Site Contamination)
Measure 1999 (NEPM) is required. The report must conclude:
a. whether the site is suitable for the proposed new use/development (with
and without remediation and/or management);
Page 15 of 22