2017-11-13 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 13 NOVEMBER 2017
3. The outdoor dining areas must not exceed 30m2 and 35m2 as shown on the
approved plans and must not be used after 10pm each night.
4. The approved uses must not cause nuisance as a result of noise emission.
5. Entertainers or speakers used to amplify noise must not be located in any
outdoor, verandah, patio, footpath or beer garden area of the premises.
Building Appearance
6. Ground floor shopfront glazing along the frontages must be fully transparent to a
minimum of 6550% of the street frontage to allow passive surveillance and
encourage social interaction, and must be provided at full height (floor to ceiling).
7. The external finishes of the building must include a mix of materials, variation in
roof form and extensive eaves as shown on the Approved Plans.
8. All mechanical equipment and other service infrastructure located on the site
must be:
a. located not less than 2 metres from a property boundary
b. fully enclosed or screened such that they are not visible from the street
frontages nor adjoining properties. Where screened by landscaping,
landscaping beds must be at least 1.5 metres wide.
Soil Contamination
9. As part of any Operational Works application for the site a detailed site
contamination assessment report prepared by a suitably qualified and
experienced person in accordance with the procedures and practices detailed in
the National Environment Protection (Assessment of Site Contamination)
Measure 1999 (NEPM) is required. The report must conclude:
a. whether the site is suitable for the proposed new use/development (with
and without remediation and/or management);
b. whether any site contamination is causing, or is likely to cause,
‘environmental harm’ (as defined under the Environmental Management
and Pollution Control Act 1994); and
c. whether any site contamination presents an occupational health and safety
risk to workers involved in redevelopment of the site.
10. If the site contamination assessment report concludes that remediation and/or
management strategies are necessary to avoid risks to human health or the
environment, a proposed remediation and/or management plan must be
submitted to Council prior to the commencement of building works. Any
remediation or management plan involving soil disturbance must include a
detailed soil and water management plan to prevent off-site transfer of
potentially-contaminated soil or stormwater.
NB: It is mandatory for any contaminated land investigation documents, including
investigation reports, validation reports and draft site management plans to be
certified by an approved auditor and must have approval from the Department of
Environment and Heritage and Protection (DEHP). DEHP have list of approved
auditors.
Page 8 of 22