Minor Change Existing Approval 132004 240137 2 (As Published) · 132004.240137.2
Land Development
Carparking
10. Carparking shall be provided within the site in accordance with Bennett & Francis Pty Ltd
letter and the attached drawings numbered 014634.01 and 014634.02 received by Council
on 8 December 2004 except as modified herein.
11. The carparking area shall be designed to comply with the provisions of AS 2890.1-2004
Park Contributions
12. A Park contribution of $3,012 towards the acquisition of additional parkland or the
improvement of existing parkland and facilities in the locality shall be paid to the Council prior
to obtaining a Development Permit for Operational Works in accordance with Council’s
Planning Scheme Policy PSP24 Park Requirements. This amount will be subject to
variations in the Price Index, All Groups Brisbane from September 2004 until the date of
payment.
Pathway Contributions
13. A pathway contribution of $272 towards external major pathways, in accordance with
Planning Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the
Council prior to obtaining a Development Permit for Operational Works. This amount will be
subject to variations in the Price Index, All Groups Brisbane from September 2004 until the
date of payment.
Headworks
14. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates under the current policies is outlined below. These amounts
will adjusted in line with changes to the Price Index, All Groups Brisbane from September
2004 until the date of payment.
Water Supply $9,643
Sewerage $7,588
TOTAL $17,231
All headworks contributions must be paid prior to use commencing.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or
is cancelled, the contribution or trading bank guarantee will be returned.
General
15. Any damage caused to any public utility during the course of construction shall be repaired
to Council’s standards and at no cost to Council.
16. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
17. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to
or from the site shall be covered to prevent materials including dust being windblown from
the vehicle.
Page 3 of 6
Document Set ID: 24199432
Version: 3, Version Date: 03/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval 132004 240137 2 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 152 KB (small file)
- File type
No other editions are linked here.