Decision Letter - Change to an Existing Approval - 010.2008.00001704.003 [As Published] · 142008.1704.03

of 16

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                        2008/1704


3     RELEVANT PERIOD OF APPROVAL

The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4     ASSESSMENT MANAGER CONDITIONS

1.    Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans are numbered and titled:
      Plan / Document No.         Rev.     Plan / Document Name                          Date
      WD.707                      C12      Proposed Pontoon & Jetty by Kidd and Co       10 July 2009
                                           Designers

      and as may be amended by these conditions.
2.    Deleted.
3.    The pontoon must not exceed the maximum dimensions of 7 metres in length and 2 metres in
      width.
4.    The overall length of the regatta stairs shall not exceed the overall length of the pontoon.
5.    The regatta stairs shall be of open construction as indicated on the Kidd and Co Designers’
      architectural plan and shall not have vertical riser timbers as indicated on Schwabe Consulting
      Engineers’ plans.
6.    The regatta stairs shall be constructed as close as reasonably possible to the face of the rock
      revetment wall.
7.    All structures associated with the pontoon, including piles, must be constructed wholly within
      the approved Resource Entitlement Area.
8.    All parts of the existing jetty including paths and supporting elements below water level must
      be completely removed.
9.    Deleted.
10.   Deleted.
11.   No boatlifting devices for the purpose of elevating a vessel above the water are to be attached
      or moored at the structures without prior Council approval.
12.   Deleted.
13.   There shall be no electrical reticulation system carrying electricity in excess of 24 volts beyond
      the revetment wall.
14.   Lighting associated with the use shall be designed, installed, operated, and maintained in
      accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
15.   The pontoon is to be used for private purposes only with no commercial operations to be
      undertaken.
16.   Boat repair activities will not be permitted on site.
17.   Wastewater and sullage shall only be disposed of at approved pump out facilities.
18.   The mooring facility shall not be utilised for live-aboard purposes.
19.   Any construction and post construction activity is not to impact on the condition of the
      waterway, and is to be conducted so as not to breach the Environmental Protection Act (EPA)
      1994 and the Environmental Protection (Water) Policy 1997.


                                                                                      Page 2 of 16

Used in these records

About this file

File size
223 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Letter - Change to an Existing Approval - 010.2008.00001704.003 [As Published].pdf · 223 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.