Original source · versioned page text
FRI - 20210153 Maple St WMP
5 Limitations
The purpose of this report is to document a WMP, as part of a development application. It has the following
limitations:
◼ It relates only to operational waste (excludes demolition/construction stages).
◼ It is based on drawings provided.
◼ Volumes presented are estimates only; the actual amount of waste may vary depending on occupancy
rates, waste generation intensity and the operator's approach to waste management.
◼ This report is not to be used for the purposes of estimating operational costs or to document operational
or safety procedures
Project number 20210153 File 20210153 - WMP.docx, 2023-04-28 Revision 1 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (FRI - 20210153 Maple St WMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.