Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Flood Study BSM Job2013 08 Date 15 Sep 2014 Revised

Attached to the e-mail REC14/0009 Information Response.

of 64

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 12, section 1. The text section number identifies this passage in the reader.

The consequent changes in local discharges from the site, to No2 Pearsons Road, are collated from
Tables 7, 9 and 10 and summarised in Table 11, below. The changes are seen to be non-adverse, from Q1
to Q100.

Table 11: Changes To Local Stormwater Discharges (m3/sec) From Site To No 2 Pearsons Road
 Scenario              Q1        Q2         Q5        Q10        Q20        Q50      Q100
 Pre-Development      0.25      0.30       0.45       0.56       0.66      0.85       0.97
 Post-Development    0.003     0.004      0.006       0.14       0.27      0.48       0.63




   Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                       Page 11
Log in to download the original file

Flood Study BSM Job2013 08 Date 15 Sep 2014 Revised.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.