Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Flood Study BSM Job2013 08 Date 15 Sep 2014 Revised

Attached to the e-mail REC14/0009 Information Response.

of 64

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 17, section 1. The text section number identifies this passage in the reader.

Table 17 :   Discharge Points From Urbs Hydrologic Model To XPStorm Hydraulic Model
          Pre-Development Scenario                    Post-Development Scenario
   Urbs Subareas          XPStorm Node          Urbs Subareas         XPStorm Node
 (Location, Figure 4) (Location, Figure 6)    (Location, Figure 5)  (Location, Figure 6)
         1 –5                    1                   1–5                     1
           6                     3                     6                     3
           7                     4                     7                     4
           8                     8                     8                     7
           9                    13                     9                     8
          10                    16                  10 - 18                 10
          11                    20                    19                    11
       12 – 16                  23                    20                    13
          17                    25                    21                    16
          18                    28                    22                    20
       19 - 20                  31                  24 - 28                 23
          21                    32                  29 - 36                 27
          22                    35                    37                    28
          23                    38                   3823                   29
                                                      44                    31
                                                      45                    32
                                                      46                    35
                                                      47                    38




   Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                     Page 16


[OCR of page images]
Table 17 :

Discharge Points From Urbs Hydrologic Model To XPStorm Hydraulic Model

 

Pre-Development Scenario

Post-Development Scenario

 

Urbs Subareas
(Location, Figure 4)

XPStorm Node
(Location, Figure 6)

Urbs Subareas
(Location, Figure 5)

XPStorm Node
(Location, Figure 6)

 

 

 

 

 

1-5 1 1-5 1
6 3 6 3

7 4 7 4

8 8 8 7

9 13 9 8
10 16 10 - 18 10
11 20 19 11
12-16 23 20 13
17 25 21 16
18 28 22 20
19 - 20 31 24 - 28 23
21 32 29 - 36 27
22 35 37 28
23 38 3823 29
44 31
45 32
46 35
47 38

 

 

 

Brisbane Stormwater Management Pty Ltd Document File: WalkevSDF.Doc

Page 16
Log in to download the original file

Flood Study BSM Job2013 08 Date 15 Sep 2014 Revised.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.