Original source · versioned page text
Ecological Assessment Technical Memorandum
b) minimise threat of fire to the natural environment, as bushfire risk. As no clearing works are proposed as a mitigation measure, it is
well as life and property; and determined that works are consistent with the intent of PO12.
c) provide for effective use and maintenance of buildings
and structures.
www.thereforgroup.com.au 24-0565E/BF | Sunshine Butterflies | Ecological Memorandum | 12.03.2026 | Version 1.0 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.