Council archive · source document
SUPERSEDED Decision Notice - Minor Change - 51983 3225 16 [As Published] · 51983.3225.16
As Annotated by Council
DA019 Building Section A, prepared by GT Group Building 30 June 2023
Rev A Design
As Annotated by Council
DA020 Building Section A, prepared by GT Group Building 30 June 2023
Rev A Design
As Annotated by Council
A101 Site Plan, prepared by Earth Creation Landscapes 4 Sept 2023
Rev A
A102 Planting Plan / Schedule, prepared by Earth Creation 4 Sept 2023
Rev A Landscapes
3 Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed within this Decision Notice.
Construction Management Plan & Pre-Start Meeting
4 A Construction Management Plan must be submitted to and approved by Council prior to
obtaining a building approval and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including.
i. Traffic Management Control Plan in accordance with Manual of Uniform Traffic
Control Devices (MUTCD) detailing all temporary signage and traffic control
measures prior to construction.
ii. Maintenance of safe and unobstructed access across the frontage of the site for
pedestrians and vehicles both during daily construction and after daily
construction has ceased.
iii. Parking arrangements, number, and locations for vehicles associated with the
proposed construction works that need to be onsite or in proximity to the site at
any time during the phases of the construction works. Where relevant, time slots
and off-peak hours should be indicated. All efforts must be made to prevent or
minimise adverse impact on public parking availability in the local area.
b. Works programme identifying key components of the works and their respective
durations.
c. Written confirmation from the Body Cooperate accepting the use of the common
property for activities associated with the construction works as identified in the final
Construction Management Plan and the Traffic Management Plan.
d. Proposed fencing to the site during the construction phase of the development.
e. Protection fencing for existing landscaping and trees in proximity to the work activities.
f. Maintenance and protection of water quality and existing drainage lines through the
construction site through the implementation of appropriate erosion and sediment
control measures to prevent silt and contaminants from entering existing stormwater
system.
g. Establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic and services and other relevant issues.
h. identification of complaint management procedures including:
i. Contact details for the on-site manager.
Page 7 of 15
Document Set ID: 22666915
Version: 4, Version Date: 17/11/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - Minor Change - 51983 3225 16 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 199 KB (small file)
- File type
No other editions are linked here.