Original source · versioned page text
RFI - P0478-26-001_Cooroy_Development_OPW
Original PDF page 10, section 3. The text section number identifies this passage in the reader.
ExS
PROPOSED EXTERNAL CARPARK ASPHALT
2
3.
11
PROPOSED WALKWAY
PROPOSED WALKWAY
3KL RAINWATER TANK
---- ---- ---- ---- ---- North Point Approved Project Address Title
---- ---- ---- ---- ----
EOIN WHITMORE
45 MAPLE ST, COOROY AND 9 MYALL ROADWORKS AND DRAINAGE LAYOUT PLAN
N
---- ---- ---- ---- ---- 31423 17/04/2026 ST COOROY
---- ---- ---- ---- ---- For and on behalf of RECOR Pty Ltd.
C 24/06/2026 ISSUED FOR OPERATIONAL WORKS CS EW Scale ENGINEERING & PROJECT SERVICES Client Details Project Name Sheet Size
SUNSHINE COAST | BRISBANE
B 15/06/2026 ISSUED FOR APPROVAL - ARCHITECTURAL UPDATE CS EW 2 0 2 4 6 8 10 www.recor.au | ABN 89 647 469 707 MYALL RISE PTY LTD COOROY SOCIAL HOUSING A1
SCALE (metres)
A 17/04/2026 ISSUED FOR OWP APPROVAL CS EW 1 : 200 (FULL SIZE) COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's Project Number Drawing Number Revision
client. This drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as
Rev Date Revision Description Drawn Check DO NOT SCALE, IF IN DOUBT ASK 'Issued For Construction' in the revision description. P0478-26-001 C040 C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - P0478-26-001_Cooroy_Development_OPW.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.