Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2016-12-12 General Committee - Attachments 1, 2, 3 to Item 10 - Oyster Restoration Project

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                                                                             LOCALITY PLAN




NORTH                                                NORTH




                             FLOOD FLOW
                             DIRECTION
                                                                                                            NOTES

                                                                                                            1.   All measurements are in meters

                                          TO RIVER                                                          2.   Tidal levels based on Marine Safety Queensland Tide Tables
                                                                                                                 2016
                                          ENTRANCE
          Recent site inspection                                                                            3.   Hydrographic survey by Definium, 2011

          indicates site is                                                                                 4.   Aerial photograph from Google Earth, 20/5/2016


          free of marine plants                                                                             5.   For oyster reef location;
                                                                                                                  - see drawing 2016.0028-002
                                                                                                            6.   For reef unit design;
                                                                                                                  - see drawing 2016.0028-020

                                                                                                            7.   Numerical Modelling data provided by WMA Water
                                                                                                                  - Peak tidal velocity      = 0.17 m/s
                                                                                                                  - 50yr peak flood velocity = 0.47 m/s




        OYSTER REEF




                                                                                S
                                                                               LW
                                                                          T
                                                                         LA




                                                                              M
                                                                                                           LEGEND
                                                                                                                                    Mean High Water Springs (MHWS)

                                                                                                                                    Mean Low Water Springs (MLWS)

                                                                                                                                    Lowest Astronomical Tide (LAT)

                                                                                                                                    RP Boundaries
                                                                                                                                   Oyster
                                                                                                                                   Oyster Reef
                                                                                                                                          Reef Restoration Site
                                                                                                                                   Resource Allocation Area (RAA)
                                                                                                                                   (5.35m Radius)

                                                                                                                                   Buffer Zone
                                                                                                                                   (20m outside boundary of RAA)

 0   10     20   30   40   50m                       0   5   10   15   20m                                 VERTICAL DATUM: AHD

                                                                                                           REVISION REGISTER
                                                                                                                                                 HORIZONTAL DATUM: MGA




                                                                                                                                 add RAA, 20m buffer
                                                                                                             A       19/10/16                                   SK     BC        AJ
                                                                                                                                 updated site location
                                                                                                           REV.NO.    DATE              DESCRIPTION              BY    ENG.      APP.




                                                                                                                                           International
                                                                                                                                           Coastal
                                                                                                                                           Management
                                                                                                                 OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
                                                                                                                 POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
                                                                                                                 TELEPHONE +61 7 55640564          FAX +61 7 55329147
                                                                                                                 WEBSITE www.coastalmanagement.com.au




                                                                                    Definium Survey 2011   PROJECT NAME

                                                                                                              NOOSA
                                                                                                           NOOSA     RIVER
                                                                                                                 RIVER     OYSTER
                                                                                                                       OYSTER     REEFS
                                                                                                                              RESTORATION
                                                                                                           DRAWING TITLE

                                                                                                                      REEF SITE 7
                                                                                                           DRAWING No.
                                                                                                                                                                        REVISION:

                                                                                                                     2016.0028 - 010                                        A
                                                                                                           DRAWN : SK               CHECKED :      BC       APPROVED :      AJ



                                                                                                                                                                         RPEQ 2876

                                                                                                           SIZE: A3                 SCALE :                 DATE :      20 Oct, 2016
Log in to download the original file

2016-12-12 General Committee - Attachments 1, 2, 3 to Item 10 - Oyster Restoration Project(PDF, 10MB).pdf · 10.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.