2021-04-12 General Committee Meeting Agenda

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


             General
         Committee Meeting


               Monday, 12 April 2021

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
             Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener



                    “Noosa Shire – different by nature”
Log in to download the original file

2021-04-12 General Committee Meeting Agenda(PDF, 8MB).pdf · 8.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 42 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                                   12 APRIL 2021


TABLE OF CONTENTS

ITEM                                                                     PAGE

1      ATTENDANCE & APOLOGIES                                                3

2      CONFIRMATION OF MINUTES                                               3

3      PRESENTATIONS                                                         3

4      DEPUTATIONS                                                           3

5      ITEMS REFERRED FROM COMMITTEES                                        3

       1   MCU20/0128 – DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF
           USE FOR A RESIDENTIAL CARE FACILITY AT 32 VIEWLAND DRIVE, NOOSA
           HEADS                                                             3

       2   PARK ROAD TEMPORARY PATH UPGRADE FURTHER INFORMATION              3

6      REPORTS DIRECT TO GENERAL COMMITTEE                                   4

       3   PROPOSED LEASE - SHOP 8, SUNRISE BEACH SHOPPING CENTRE            4

       4   BUDGET REVIEW 3 (BR3) FOR THE 2020/21 FINANCIAL YEAR              10

       5   FINANCIAL PERFORMANCE REPORT – MARCH 2021                         29

7      CLOSED SESSION                                                  43




                                                                   Page 2 of 43

Section 3

GENERAL COMMITTEE MEETING AGENDA                                                      12 APRIL 2021



1   ATTENDANCE & APOLOGIES




2   CONFIRMATION OF MINUTES

    The Minutes of the General Committee Meeting held on 15 March 2021 be received and
    confirmed.




3   PRESENTATIONS

    Nil.




4   DEPUTATIONS

    Nil.




5   ITEMS REFERRED FROM COMMITTEES


    PLANNING & ENVIRONMENT COMMITTEE

    1      MCU20/0128 – DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE
           FOR A RESIDENTIAL CARE FACILITY AT 32 VIEWLAND DRIVE, NOOSA HEADS
           (Planning & Environment Committee Agenda, 6 April 2021, Item 1, Page 4)
           Reason for referral – For further consideration




    SERVICES & ORGANISATION COMMITTEE

    2      PARK ROAD TEMPORARY PATH UPGRADE FURTHER INFORMATION
           (Services & Organisation Committee Agenda, 6 April 2021, Item 1, Page 4)
           Reason for referral – Significance of the issue




                                                                                      Page 3 of 43

Section 4

GENERAL COMMITTEE MEETING AGENDA                                                     12 APRIL 2021


6    REPORTS DIRECT TO GENERAL COMMITTEE



3    PROPOSED LEASE - SHOP 8, SUNRISE BEACH SHOPPING CENTRE

Author            Property Advisor – Commercial Property, Robyn Mercer
                  Corporate Services Department

Index             ECM/Subject: 46.01 Leases

Attachments       1.   Application Support Summary



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Property Advisor – Commercial Property to the General
Committee Meeting dated 12 April 2021 regarding the lease of Shop 8, Sunrise Neighbourhood
Shopping Centre and:
A.   Agree to enter a commercial lease of the premises to Tanglewood Company Pty Ltd, for a five
     (5) year term, as generally outlined in the report;
B.   Agree to an initial rent-free period of 6 months; and
C.   Authorise the CEO to award up to 4 subsequent lease extensions each of 5 years, subject to
     the lessee complying with the terms of the lease.



REPORT
The purpose of this report is to seek Council approval to enter into a new lease for Shop 8 - Sunrise
Neighbourhood Shopping Centre. Shop 8 is the largest tenancy in the centre comprising 305m 2, is
the centre’s key anchor tenancy and has traditionally been leased as a convenience store/grocer. In
recent years the shop has been vacant which has affected overall centre performance.

Colliers International is Council’s managing agent for the centre and have been actively seeking new
tenants for the vacancy. Colliers have received an offer to lease from a local business, Tanglewood
Company Pty Ltd, who are proposing to lease Shop 8 for wholesale and retail food production,
grocery, organic and wholefoods purposes.

In accordance with their role as managing agent, Colliers has undertaken an assessment of the
lease proposal and supporting information as per the Tenant Assessment Criteria noted in
Attachment 1. The proposal scored highly against the criteria and Colliers notes in their opinion
‘Tanglewood are an excellent fit for the Sunrise Beach Shops’.

The agreed rent achieves a fair market value in line with an independent market valuation. The
primary lease provisions proposed are as follows:




                                                                                     Page 4 of 43

Section 5

GENERAL COMMITTEE MEETING AGENDA                                                             12 APRIL 2021


    Lease Provision                  Proposal
    Lessee Name:                     Tanglewood Company Pty Ltd
    Premises:                        Part of Lot 8 RP901384
    Annual Rent:                     $85,400 (excluding GST)
    Nett Lettable Area:              305m2
    Indicative Commencement Date:    1June 2021
    Rent Free Period:                6 months
    Initial Lease Terms:             5 years
    Options to Extend:               4 x 5 years
    Market Rent Reviews:             At the commencement of each option.
    Outgoings:                       Lessee is responsible for their proportionate share of outgoings for the
                                     centre.
    Permitted Use:                   Wholesale and retail food production, grocery, organic and wholefoods.

Previous Council Consideration
Nil.

Finance
The financial return posed by the new lease is as detailed above. Tanglewood Company proposes
to undertake substantial fit out works to the premises. The proposed six (6) month rent free period
is intended to help offset the lessee’s establishment costs. Some legal and transactional costs will
be incurred by Council in the order of $3,000 and will be absorbed in the current Property budget.
Lease revenue will be recognised in the 2021/22 budget.

Risks & Opportunities
Risks

The proposed lease poses minimal risk as it seeks to re-establish an anchor commercial tenant.

Opportunities

The lessee’s proposal demonstrates a commitment to the centre and identifies new business and
employment opportunities. The new lease proposal will help activate the centre and meet the needs
of the community.

Consultation
External Consultation - Community & Stakeholder
Colliers International Sunshine Coast
Savills Valuations Pty Ltd

Internal Consultation
      Director Corporate Services
      Property Manager




                                                                                              Page 5 of 43

Section 6

GENERAL COMMITTEE MEETING AGENDA                                                          12 APRIL 2021


Departments/Sections Consulted:

    Chief Executive Officer       Community Services                      x   Corporate Services
    Executive Support             Director                                x   Director
                                  Community Development                       Financial Services
                                  Community Facilities                        Fleet
                                  Libraries & Galleries                       ICT
                                  Local Laws                              x   Procurement
                                  Waste & Environmental Health            x   Property
                                                                              Revenue Services

    Executive Services            Environment & Sustainable Development       Infrastructure Services
    Director                      Director                                    Director
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
    People and Culture            Environmental Services                      Disaster Management
                                  Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                           Page 6 of 43

Section 7

GENERAL COMMITTEE MEETING AGENDA    12 APRIL 2021


                                   ATTACHMENT 1




                                    Page 7 of 43

GENERAL COMMITTEE MEETING AGENDA                                                           12 APRIL 2021

                                                                                         ATTACHMENT 1

    Level 5,57 The Esplanade PO Box 796           man +61 7 5478 3788
   Cotton Tree QLD 4558     Cotton Tree QLD 4553  Fax +61 7 5443 5982
                            www, colliers.com.au  Eman jesse. [email protected] Colliers
                                                                                    INTERNATIONAL

   18 March 2021

   Robyn Mercer
   Noosa Council (Commercial Property)
   PO Box 141
  TEWANTIN QLD 4565

   Dear Robyn,
  RE: APPLICATION OF TANGLEWOOD PTY LTD TO SUNRISE BEACH SHOPS

  Thank you for the privilege of allowing us to assist with your tenant search for the 2 Grasstree Court
   (Sunrise Beach Shops).   It is the view of Colliers Sunshine Coast that the successful placement of
  Tanglewood will be a key milestone in Noosa Council's strategic objective of re-activating the complex.
  This letter outlines the process that was followed to procure Tanglewood in addition to our assessment
  of Tanglewood as a potential tenant for the complex.

  Procurement Process
  Colliers International (Sunshine Coast) followed the procurement processes required of Council in
  addition to generally accepted methods of advertising online and approaching potentially suitable
  tenants within our own database.   The below table outlines the timeframes surrounding the tenant
   procurement.

  Procurement Timeline

    Pre November 2019      ~==Property had been advertised with other commercial leasing agents.
    15th November 2019     Publicly advertised online via major commercial real estate websites:
    to current                                  .
                               e   Realcommercial.com.au
                               e   Commercialrealestate.com.au
                               ®   Colliers.com.au
    10th December 2019     Publicly Advertised in Noosa News (1/4 page advert.). See Annexure A
    2nd December 2019      Discussions with several potential users over the leasing period.
    to current
    March 2020             Any potential tenants expressing interest advised applications would soon
                           be presented to council.

                                                                                            Page 7 of 43

Section 8

GENERAL COMMITTEE MEETING AGENDA   12 APRIL 2021




                                   Page 8 of 43

GENERAL COMMITTEE MEETING AGENDA                                                                12 APRIL 2021

     Level 5,57 The Esplanade PO Box 796            man +61 7 5478 3788
     Cotton Tree QLD 4558     Cotton Tree QLD 4558  Fax +61 7 5443 5982
                              www, colliers.com.au  Evan jesse. [email protected]  Colliers
                                                                                       INTERNATIONAL

    Tenant Overview: Tanglewood Pty Ltd
    Tanglewood was created by a local family who have a passion for high quality, natural, and locally
    sourced produce. Beginning in 2014 and named after the iconic Tanglewood track that’s found in the
    world-famous Noosa National Park, Tanglewood’s artisan products are now found in many households
    and local restaurants.

    Tenant Assessment Criteria
     Commercial Terms                 20/20      The commercial lease terms offered by Tanglewood
                                                 are reflective of the asking terms.
                                                 The “rent free incentive” is below market in a post covid
                                                 environment.
     Business Track Record             18/20     After it’s conception in 2014, Tanglewood has grown
                                                 substantially with it’s products found in households and
                                                 respected restaurants.
     Capability and Resources         20/20      Based on the information provided by the firms qualified
                                                 Chartered    Accountant,   we   are   confident   that
                                                 Tanglewood    will be  able   to meet the    financial
                                                 obligations of the lease.
     Suitability & Compatibility       17/20     A growing local company that supports other local
                                                 businesses, Tanglewood’s offering is set to attract large
                                                 volumes of patrons to the complex and fill a gap in the
                                                 market.
     Contribution to Local Economy = 18/20       In addition to working with other local business,
                                                 Tanglewood    will  be   providing  the   surrounding
                                                 catchment areas with much needed products. They will
                                                 also be creating a space for locals to relax, eat and
                                                 drink.
     Total Assessment                 93/100     —siIt is the opinion of Colliers that Tanglewood are an
                                                 excellent fit for the Sunrise Beach Shops.

                                                                                                 Page 8 of 43

Section 9

GENERAL COMMITTEE MEETING AGENDA   12 APRIL 2021




                                   Page 9 of 43

GENERAL COMMITTEE MEETING AGENDA                                                                              12 APRIL 2021

      Level 5, 57 The Esplanade   PO Box 796                 man +61 7 5478 3788
      Cotton Tree QLD 4558        Cotton Tree QLD 4558       Fax +61 7 5443 5982                               -
                                  www, colliers.com.au       Eman jesse. [email protected]        Colliers
                                                                                                      INTERNATIONAL

    Conclusion
    We again thank you for the opportunity to work alongside Noosa Council to find a suitable tenant for
    the Sunrise Shops.       Having followed the Council’s due process and having assessed the potential
    tenant against the Council's criteria, we strongly support the application of Tanglewood and can be
    called upon anytime to provide further feedback.

    Yours sincerely

    Jesse Howitt
    Colliers Sunshine Coast

    Annexure A — Newspaper advertisement image:

                                         Accelerating success                     OTS eS
                                         Reach more people - better results faster oe

                                   COMMERCIAL TENANCIES FOR LEASE
                                   FOR LEASE
                                   iat et
                                                                    Se              COURT,
                                                       Way
                                      a              —       |
                                   os                seco             v      LO
                                          ey          bat a           300-  Anchor   Busy
                                           S           % Aan         1,000m* tenant neighbourhood
                                          ci.         =        t            sought  centre
                                   es                 +
                                   Ooo eine            ‘       —
                                    — Kio   /*           2
                                   A =\        GQ   ——         .    253 DAVID LOW WAY,
                                       =      i       ha            PEREGIAN BEACH DIGITAL HUB
                                   “        Na ,     3        ,     PEREGIAN BEACH
                                            TaN
                                         ‘Sabi                  we    m      9      O
                                              ‘  \               |
                                            ir        “il      = >    45m? Close to Joie vibrant
                                                   d    Pi    =             beach   digital
                                               5    fh  t                          community
                                           cee -*     y         3
                                    i     RE STORAGE        ro
                                                                    COOROY DATA CENTRE
                                                                    1iA MAPLE STREET,
                                    by                              COOROY
                                                                      m      $
                                   zs                                 97m?  $36,375 pa Purpose
                                    =                                       exclGST built date
                                          =              _       ‘                  centre
                                                     ee ot
                                    Jesse Howitt 0468 495 640
                                                                                 colliers.com.au

                                                                                                               Page 9 of 43

Section 10

GENERAL COMMITTEE MEETING AGENDA                                                       12 APRIL 2021


4      BUDGET REVIEW 3 (BR3) FOR THE 2020/21 FINANCIAL YEAR


Author             Manager Financial Services, Trent Grauf
                   Corporate Services Department

Index              ECM / Subject / 7.26 – 2020-2021 Budget

Attachments        1.   Proposed Operating Budget Submissions
                   2.   Proposed Capital Budget Submissions
                   3.   Revised Capital Program
                   4.   Revised Statement of Income and Expenditure
                   5.   Revised Budget Financial Statements



EXECUTIVE SUMMARY
The Local Government Act 2009 and Local Government Regulation 2012 require Council to
undertake regular reviews of the adopted budget to ensure it remains reflective of planned activities
to be funded through the financial year. This third and final budget review for the 2020/21 financial
year (BR3) incorporates any new or emergent actions arising from Council resolution, Executive
Team or Capital Works Executive Committee review, reallocation of funds or realised revenue
variance since the adoption of the current BR2 budget in December 2020.
In summary the budget review is proposing a net improvement of $2.0 million to Council’s operating
position, resulting in the operating deficit decreasing from $3.0 million to $0.9 million. This decrease
is primarily due to the additional revenue raised from facilities reopening earlier than anticipated due
to COVID-19 pandemic related closures. The revised capital expenditure program has also
decreased by $4.2 million to $31.2 million.

Item                                       Current Budget           Proposed      Revised Budget
                                                    (BR2)         Adjustments              (BR3)
                                                   ($’000)             ($’000)            ($’000)
Operating Revenue                                 $96,958               $4,203          $101,162
Operating Expenditure                              $99,915             ($2,194)           $102,109
Operating Result                                   ($2,957)             $2,009               ($947)
Capital Grants and Subsidies                       $11,642                 $46             $11,688
Capital Works Expenditure                          $35,392             ($4,150)            $31,243


RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee Meeting
dated 12 April 2021 and approve the proposed changes to the budget for the 2020/21 financial year
as outlined in the revised Budget Financial Statements attached to the report.



REPORT
Section 170(3) of the Local Government Regulation 2012 allows Council, by resolution, to amend
the budget at any time before the end of the financial year. Consequently, formal budget reviews
are scheduled to occur during August, November and April using the latest financial information
available as the basis to revise the budget forecast.




                                                                                      Page 10 of 43

Section 11

GENERAL COMMITTEE MEETING AGENDA                                                        12 APRIL 2021


The key criteria for budget reviews include:
1.      Council must ensure compliance with its financial sustainability policy targets. Note for the
        2020/21 adopted budget, one indicator will not be met due to COVID-19 impacts.
2.      The eligible capital or operating projects must be delivery-ready with a commitment to complete
        the project during the year.
3.      Capital submissions will be reviewed and authorised by the Executive Team before inclusion
        as a budget review submission, where the group will consider justification for the request,
        deliverability as well as organisational and community priorities before endorsing any capital
        works.
4.      All operating and capital submissions for additional spend, reallocation of savings or additional
        revenue will be confirmed by the Executive Team based on business risk assessment.
The revised statement of comprehensive income, included as Attachment 4, identifies the financial
statement line items that have been affected by the proposed budget adjustments. The budget
financial statements, included in Attachment 5, also identify the impact of the proposed budget
adjustments to Council’s financial sustainability indicators.

1.      Proposed Operating Budget Adjustments
The proposed 24 operational budget adjustments will result in a $2.0 million decrease to the
operating deficit. The following table summarises the operational carryovers by type of funding, with
a detailed list contained in Attachment 1. The financial statements in Attachments 4 and 5 outline
the revised budget position as a result of these proposed adjustments.

    Type                                    Submissions         Revenue            Expense
                                                                 ($’000)             ($’000)
    Increased Revenue (net)                       7               $4,061               $980
    Grant Funded                                  9                 $142               $313
    Levy Funded                                   1                    $-               $18
    General Revenue and Reserve Funded            7                    $-              $883
    Total                                        24               $4,203             $2,194

2.      Proposed Capital Budget Adjustments
A total of 20 budget review submissions were received for capital works, with a proposed decrease
of $4.2 million to the 2020/21 capital works program. All capital submissions have been reviewed by
the Capital Works Executive.
The table below summarises the budget submissions by program and categorised as:
       Emergent Works: Initiation of new capital works item which have arisen since BR2.
       Variation: Acceptance of tender, change in scope or reallocation of funds.
       Grant / Levy Funded: Initiation of works funded through successful grant application or
        utilisation of constrained reserves set aside for that purpose.
       Timing Adjustment: Commencement of construction has been delayed or brought forward
        and works will straddle two financial years into 2021/22.
The full list of submissions is contained in Attachment 2.




                                                                                        Page 11 of 43

Section 12

GENERAL COMMITTEE MEETING AGENDA                                                      12 APRIL 2021


 Program                             Emergent        Variation     Grants /   Timing of      Total
                                                                    Levies       Works

   Bridges                                                                     ($1,696)   ($1,696)
   Community Facilities                      $20                       $100    ($2,100)   ($1,980)
   Corporate Buildings                       $85                                               $85
   Environmental Assets                                                $950                   $950
   Libraries & Galleries                                                         ($350)     ($350)
   Parks & Playgrounds                                                             $480       $480
   Pathways & Boardwalks                                                           $340       $340
   Sealed Road Network                                                 $998                   $998
   Stormwater Drainage                       $266                                ($152)       $114
   Waste Management                                                            ($3,090)   ($3,090)
   Grand Total                               $371             $-     $2,048    ($6,568)   ($4,150)

The following table summarises the proposed revised 2020/21 capital budget.

Total Capital Budget                                    Amount
                                                         ($'000)
Current BR2 Capital Expenditure Budget                  $35,392
Proposed BR3 Adjustments                                ($4,150)
Revised BR3 Capital Expenditure Budget                  $31,243

The following table summarises the proposed revised 2020/21 capital budget by program, with the
full program contained in Attachment 3.

Program                                            2020/21 Adjustments   Proposed
                                              Current BR2              BR3 Budget
                                                   Budget
Capital Works
   Bridges                                           $5,199        ($1,696)     $3,503
   Coastal Canals and Waterways                        $245                       $245
   Community Facilities                              $6,505        ($1,980)     $4,525
   Corporate Buildings                                                  $85        $85
   Environmental Assets                                               $950        $950
   Gravel Road Network                                 $410                       $410
   Holiday Parks                                       $410                       $410
   Libraries & Galleries                               $925         ($350)        $575
   Parks & Playgrounds                               $1,224           $480      $1,704
   Pathways & Boardwalks                             $1,888           $340      $2,228
   Public Amenities                                    $220                       $220
   Public Transport Infrastructure                     $250                       $250
   Sealed Roads Network                              $4,507           $998      $5,505
   Stormwater Drainage                               $1,265           $114      $1,379
   Transport and Infrastructure Management           $2,211                     $2,211
   Waste Management                                  $3,653        ($3,090)       $563
Other Works
   Fleet - Plant Replacement                         $1,234               -     $1,234
   Asset Management                                  $3,796               -     $3,796
   Information Technology                              $713               -       $713
   Planning Scheme                                     $736               -       $736
   Grand Total                                      $35,392        ($4,150)    $31,243



                                                                                     Page 12 of 43

Section 13

GENERAL COMMITTEE MEETING AGENDA                                                         12 APRIL 2021


Previous Council Consideration
The 2020/21 original budget was adopted by Council resolution on 10 July 2020 (Ref. Special
Meeting Minutes, 10 July 2020, Item 3, Page 3).
The 2020/21 budget review 1 (BR1) was adopted by Council resolution on 20 August 2020 (Ref.
Ordinary Meeting Minutes, 20 August 2020, Item 6, Page 10).
The 2020/21 budget review 2 (BR2) was adopted by Council resolution on 17 December 2020 (Ref.
Ordinary Meeting Minutes, 17 December 2020, Item 6, Page 22).

Finance
The financial sustainability ratios for asset sustainability and net financial liabilities are forecast to
meet the benchmark targets under the revised BR3 budget for 2020/21; however the operating
surplus ratio will continue to fall below the target range.

Ratio                         Target     Original Budget         BR1             BR2           BR3
Operating Surplus            0 – 10%          (1.9%)            (2.3%)          (3.0%)        (0.9%)
Net Financial Liabilities     < 60%           (11.1%)           (6.3%)          (8.5%)       (14.5%)
Asset Sustainability          > 90%           87.5%            101.5%          100.1%         96.1%




Risks & Opportunities
Risks
Council’s risk register includes a number of risks that could impact on ongoing financial sustainability.
Effective budget management and reporting is an important risk mitigation tool.

Consultation

External Consultation - Community & Stakeholder
Nil.

Internal Consultation
Financial Services have been in contact with all Council branches. Directors of each department
have reviewed endorsed all submissions received. The Executive Team has also reviewed and
endorsed all submissions received.


                                                                                         Page 13 of 43

Section 14

GENERAL COMMITTEE MEETING AGENDA                                                              12 APRIL 2021


Departments/Sections Consulted:

 X   Chief Executive Officer      X   Community Services                      X   Corporate Services
     Executive Support                Director                                X   Director
                                      Community Development                   X   Financial Services
                                      Community Facilities                        Fleet
                                      Libraries & Galleries                       ICT
                                      Local Laws                                  Procurement
                                      Waste & Environmental Health                Property
                                                                                  Revenue Services

 X   Executive Services           X   Environment & Sustainable Development   X   Infrastructure Services
     Director                         Director                                    Director
     Community Engagement             Building & Plumbing Services                Asset Management
     Customer Service                 Development Assessment                      Buildings and Facilities
     Governance                       Economic Development                        Civil Operations
     People and Culture               Environmental Services                      Disaster Management
                                      Strategic Land Use Planning                 Infrastructure Planning,
                                                                                  Design and Delivery




                                                                                             Page 14 of 43

Section 15

GENERAL COMMITTEE MEETING AGENDA   12 APRIL 2021




                                   Page 15 of 43

GENERAL COMMITTEE MEETING AGENDA                                                               12 APRIL 2021

   2020/21 Budget Review 3 - Operating Submissions                                        ATTACHMENT 1
                                                                                   Type                Tt
  Item              iets                                       CC(‘C*dEXpernse ' [Revenue |
  AdditionalRevenue |
  Development           Search fees and infringement revenue above budget                -205,000     -205,000
  Assessment            YTD
  Holiday Parks         Additional Holiday Parks revenue due to reopening      585,332] -1,524,540    -939,208
                        earlier than anticipated following COVID-19 pandemic.
                        Partially offset by additional operating and
                        maintenance costs
                        Search fees performing above budget expectations   f              -55,500 |     65,500)
 |                   «Additional general rates due to growth in properties f             -100,000     -100,000
  Waste Management      {Additional revenue from waste charges, green waste    195,000] -1,236,000}  -1,041,000
                        disposal and recyclables sales. Partially offset by
                        additional concrete crush, emergent leachate pit works
                        & subscriptions
  Community Facilities  |Additional revenue due to reopening earlier than      199,300]  -792,000     -592,700
                        anticipated following COVID-19 pandemic. Partially
                        offset by additional operating and maintenance costs
  Building and Plumbing |Additional YTD revenue - partially offset by additional         -148,000     -148,000
                        operating costs
  Additional Revenue Total                                                     979,632| 4,061,040}   -3,081,408
  Grant Funded                                               eT Tt
  Art Gallery and Butter |Arts Queensland QASP funding - Floating Land 2021     56,000    -56,000
  Factory
  Financial Services    Cost of Schoolies 2020 response, with proposed 50/50}  138,000    -69,000       69,000
                        State Government funding yet to be provided
  Library Services      Engaging Science grant funding (late final payment for              -4,950       -4,950
                        2019/20 program)
  Natural Areas         2019 Bushfire Recovery Exceptional Assistance          122,571                 122,571
                        Immediate Support Package. $1.275M grant received
                        in 2019/20, now fully allocated to projects
  Noosa Community       Increased HAS grant funding for Noosa Community         13,707    -13,707
  Support               Support to be expended on delivery programs
  Parks and Landscape |Local Economic Recovery Program funding - road           33,205    -33,205
                        corridor vegetation clearing project
  Tourism and           Firetech grant instalment to be received next financial -50,000    50,000
  Economic              year
  Development
 | ———S—s—S—SSsRevision of trainee commencement incentive grant           |         |       4,000        4,000
  Transport and Traffic }Go Noosa Community Cycle Skills funding                          -19,233
  Planning
  GrantFundedTotal |                                                         813,483] 142,095]         171,388
  Unfunded Emergent Requests                                                       ee          ee           ee
  Risk Management and|Governance legal costs                                   261,843                 261,843
  Insurance
  Chief Executive Office [Kin Kin Quarry review - expenditure to date           67,000          |       67,000
  Development           Development Inspector (temporary) engaged to            25,494
  Assessment            support progression of STA local law
                        Additional legal costs associated with development     352,000
                        appeals
  Environmental         Flying fox management additional maintenance and        18,184                  18,184
  Services and          operating costs
  Protection

                                                                                              Page 15 of 43

Section 16

GENERAL COMMITTEE MEETING AGENDA   12 APRIL 2021




                                   Page 16 of 43

GENERAL COMMITTEE MEETING AGENDA                                                            12 APRIL 2021

                                                                               Type                 Total
litem                 Details                                    CCCC*dEXpeernsee [Revenue |_|
  Natural Areas        Increase in proactive tree maintenance and tree      88,201                  88,201
                       related customer requests
  Council Buildings and |Emergent works at Noosaville depot to address water 70,000                 70,000
  Facilities           leakage issues including roof and carpet replacement
                       (total project $154k - maintenance component $70k)
  Unfunded Emergent Requests Total                                         Te                      882,722
  Levy Funded         ee es
  Heritage Levy        Additional costs required to finalise conservation   17,937 ||               17,937
                       management plan levy initiative
  LevyFundedTotal |                                                     |   87,937]                 17,937
 Grand Total                                                             2,193,774] 4,203,135]  -2,009,364

                                                                                           Page 16 of 43

Section 17

GENERAL COMMITTEE MEETING AGENDA   12 APRIL 2021




                                   Page 17 of 43

a.     rane    ae          permease                                              aera   a eee
    ee                                                                          BR2        Proposed           ‘BR3| Change          Nataite                 ATTACHMENT                   2
    ane                                                                     Budget          Changes        Budget |Category         Petals                 ATTACHMENT 2

Perel cy                                                                  28,912,327 -      4,149,502    piel: P ay)
    Bridges                   eee
    Orealla Crescent Overpass Refurbishment - BRP                           Zoe]           ——SSC«dtCi OBA] CPOOCOCOSCSOSCSCSCSCSCSCSCSCSC‘;‘C;SCSC~*?'
    Tewantin Doonella Bridge Renewal                                           50,000]                       50000)
    Cooran Tablelands Road Bridge Renewal - BRP.                              795,480         -545,480      250,000 | Delay into    Delayed tender release (March 2021) resulting in revised
                                                                                                                    2021/22         construction commencement date of June 2021
    Kin Kin Wahpunga Lane Bridge Renewal Annual - BRR                       4,272,767       -1,150, 767     122,000 |Delay into     Delayed tender release (March 2021) resulting in revised
                                                                                                                    2021/22         construction commencement date of June 2021
    Eerie Cresk Road Pedestrian Brdge- USR                                    Topo] SCS—~dtCtC‘ OOYCPOOCOCOCOCOCCCC‘“‘(‘#SNNWNWCN#S
    Cooroy Belli Creek Road Bridge Renewal                                     35,000f                       85,000
    Noosa Heads Garth Prova Bridge Renewal                                     S000)                id SiO CdSCOCSCSCSCSCSCSCSCSCSCSCSCSCNCNNC
    Black Mountain Lawnvile Road Bridge Renewal                                oof                   +d? io] SCdCSCOCOCOCOCCCOCCSCSC
    Monks Bridge Abutment Renewal                                              go,o0of                       90,000
    Directional Signage Hiton Tee                                              zooop _+4t                    2000]                id) CCS
    Total Bridges                                                           5,198,579       1,696,247      3,502,332
    Coastal Canals and Waterways                                      _              n               in            IL                                                                        A
    Noosa Heads Dog Beach SEMP                                                110,000]                      110,000)
    Noosa Waters Revetment Wall                                               Toooof |                      tooo TTS
    Replace Dune Fencing at Fist Cutting - Catb2018                            woof                  +4?      aooo]SS—CS| SSTTTTTTTTTTTTTTTTCTTTC~*™
    Total Coastal Canals and Waterways                                       245,000                 0      245,000
   KS rua arava                                                                                                    |                                                                          l
    NAC - LTS AMP Pool Renewal Program                                         13.435{                       13,495]
    Rufous St - Stage 3 Community House, Car Park & Landscape               4,307,176       -2,100,000     2,207,176                Contract awarded & construction starting March 2021 and
                                                                                                                    2021/22         complete by October 2021
    Rufous St Stage 3 Digital Hub Expansion                                    Te]                 |         wem|     |                                       CCOCOCSC.C‘¥S
    Rufous St~ Stage 3 Project Management                                      Sel                 iY            ST CPOOCOCOCOCCCCSC~C~CSY
    Community Facilties Minor Works Brought Forward                            arson)               | _er6oo)                  S| CCC
    NAC Replacement of Light Pole Fittings                                     59,500)                       89.500)
    Pomona School of Arts Hall- Amenities Upgrade                             203,000] |                    309000]                                              TCTCCCCCCTC~S
    Shire Electrical Distribution Board Renewals                              120,000]                      120,000)
    Shire Community Halls and Facilities Renewals - W4Q                       270,00of                      270,000)
    Coorcy Lower Mil Site Shed- Remove and Replace Arienties                   S000, +d?                     SS—i]CdCOSCSCSCSCSCSCSCSCSCSCSCSCSCSCSCSCSCSCSCSCSCSCSCSCSC~*d
    Tewantin - Building Renewal Works Cadets Bldg                             150,000]                      150,000]
    Shine House - Stand Alone Unit Construction                              250,000            70,000      320,000 }Grant / Levy   Budget revised to reflect tendered construction cost, with shortfall
                                                                                                                    Funded Work    [funded from Salvation Army co-contribution
    Cooroy Butter Factory - Security Fence                                     10,000f                       10,000]
    Tnbeerwah Hall Cladding and Roof refurbishment                            Teo,00of              |       160000]               <i               CCC                                 CCS
    New Amenities - United Synergies Community Building                       60,000            30,000              Grant / Levy    Budget revised to reflect tendered construction cost, with shortfall
                                                                                                                    Funded Work    [funded from United Synergies co-contribution
    Lifeguard Tower Renewal works                                              S7,00of                       57,000}
    Noosa Trathion Club clubroom alterations                                    zoo)                it       sof] TTY
    The J Community Centre seating refurbishment                              Toco]     _————«d(CSCSCiO OO] SC*dSCSSSCSCSCSCSCSCCCCCCSCS
    NAC Switchboard Replacement                                               135,000]                      135,000)
    Peregian Beach Rufous St Public At Cat2070                                 zoop id                       SOCdSOCOSOCOOCCSCSCSCSCSCSCSCS
    Replacement of NAC Pool Blankets                                  |                         20,000       20,000)                Replacement of deteriorating pool blankets
                                                                                                                    Works
    Total Community Facilities                                              6,194,781       -1,980,000     4,214,781

    Noosaville Depot Roof Replacement Works                                                     84,602       84,602 |Emergent       Emergent works at Noosaville depot to address water leakage
                                                                                                                    Works           issues including roof and carpet replacement {total project $154k -
                                                                                                                                    maintenance component $85k)

    Total Corporate Buildings                                                       0           84,602       84,602
   Environmental Assets, Bushland, Tracks and          Trails
    Environment Land Purchase - Lake Front Rd, Boreen Point                     OW             950,000      950,000                 Levy Funded environmental land purchase
                                                                                                                    Works
    Total Environmental Assets, Bushland, Tracks and Trails                         0         950,000       950,000
    Gravel Road Network
    Shire Gravel Resheeting Annual                                           wooo CCC‘                      IOOOCCCOCOC™COOCOCCCCC(NC#@d’
    Total Gravel Road Network                                                410,000                 0      410,000
   Holiday Parks                                                       :                                           |               :
    Boreen Point Campground Upgrade Works                                    410,000}                       410,000)
    Total Holiday Parks                                                      410,000                 0      410,000
   Libraries & Galleries                                                                              .             |              :
    Cooroy Library Renewal of CCTV Cameras                                     25.00]         T5000
    Whole of Shire Mobile Library Service Solution                           700,000          -350,000      350,000                 Revised scheduled forecast for works, with kiosks completed in
                                                                                                                    2021/22         2020/21 but vehicles delayed to 2021/22
    Noosa Regional Gallery Foyer & Amenities upgrade                          200,00of                      20,0007
    Total Libraries & Galleries                                              925,000          ~350,000      575,000
   Parks & Playgrounds _                                                      ==                      ———S         |                       :        a
    Noosa Hinterland Priority Playground                                      739,554         480,446      1,220,000 |Brought       Contract awarded & construction schedule to commence during
                                                                                                                    Forwardfrom     |2020/21. Complete by December 2021
                                                                                                                    2021/22
    Noosavile Pandorea Park Playground Renewal                                 ool                 —+dt      eon] TCTCCCCCCTCCTCCTCCTCCCCTCSSY
    Renewal of Noosa Waters Seagull Playground                                100,000f_                     100,000}
    Renewal of Lake Macdonald Playaround                                       sooo]                Sid SSC OOO]CPSCCCCCCCCCCC
                                                                                                                                                            Page 17 of 43

Section 18

GENERAL COMMITTEE MEETING AGENDA   12 APRIL 2021




                                   Page 18 of 43

Project                                                                  heie          Proposed         Bes Change:            Details
      s                                                                     Budget          Changes       Budget | Category        seo)
  rs                                                                 ee                       SA    a      SEE oo    SE
    Sunshine Beach Skate Park New Shade Structure                            woo] CT SC OOCC~—CSCSCSCSCSYS
    [ake Cooroibah Foreshore - Catb2019                                       oof |                         __aooof            i)                                                          SY
    Replace Shade Shelters at Noosa Banks - Cat D2019                         50.000]                       50000)
   Total Parks & Playgrounds                                               1,224,554         480,446      1,705,000
   Pathways & Boardwalks                                                            :                :            |
    Noosa Heads Noosa Parade Road Corridor Upgrade                                            100,000      100,000) Brought forward |Planning and design works brought forward from 2021/22 following
                                                                                                                   from 2021/22   —|successful grant application
    Cooroy Maple Street Raised Pedestrian Crossing - LGGSP                   347,000[                      347,000)
    Tewantin, Hiton Terrace CNLGGP & Ivory Palms                             ES A                   RE <
    Wallace Park Pathway 586 Waa                                             Temp «id                      SSC] OOCOCOCOCOCC~C~*Y
    Shire Pathway Renewal Program Annual - W4Q                               332,000}                     892,000]
    Noosavile Sea Eagle Diive & Shire Drive Pathway Upgrades                 sete] id                      IT] COOOCOCOCOCSCSCSCSCSCSCSC“CNC*”
    Noosa Heads Main Beach Boardwalk LED Lighting Renewal                    Too0f —SC~dCC‘OOOOCSOOCOCOCOCOCOCCSY
    Peregian Beach Boardwalk - U&R                                           230,000[                      20,0007
    Noosa Heads Sunshine Beach Road Pathway Lighting USR                     Teo.00o[              <i      S000                                                                           CS
    Cooroora Trail Loop and Trail Hub                                 |;       &             240,000       240,000]Grant /Levy — [Planning and design works included in 2021/22 program following
                                                                                                                   Funded Work    __|successful grant application
   Total Pathways & Boardwalks                                             1,888,002         340,000     2,228,002
   Public Amenities                                                                 _               _             ie                                                                        i
    Public amenities renewal and upgrade works - UR                          i a
   Total Public Amenities                                                   220,000                0       220,000
   Public Transport Infrastructure
    Shire Bus Shelter Disabled Compliant Program Annual - PTIAP              250,000f                      250,000]
   Total Public Transport Infrastructure                                    250,000                0       250,000
   SealedRoads Network
    Shire Reseal & Rehabilitation Renewal Program Annual                   3,091,726)        997,811     4,089,537 |Grant / Levy  Additional reseal works fully funded under LRCI grant (half to
                                                                                                                   Funded Work    _Joccur this financial year
    Damaged Guardral Renewals (Various)                                       Brel                 id       rT OOCOCOCOOCCC‘(‘#*‘’
    Shire Sealed Road Network Rehabilitation and Reconstruction              790,000)                      70000; fe
    Tewantin Bypass Stage 1                                                  600,000}               |      800,000
   Total Sealed Roads Network                                              4,507,494         997,811     §,505,305
   ‘Sports Ground and Facilities                                                                                  Me                                                                        !
    Tewantin Netball Courts Upgrade - U&R                                    310,00of                      80000
   Total Sports Ground and Facilities                                       310,000                0       310,000
   Stormwater Drainage                                               _                              ;             |               :
    Gympie Terrace Stormwater                                                 Dol _-i|                      ool]                                         TTTTTTTTCTTCTCCTC—CS™Y
    Shire Bioretention Basin Renewals Program Annual                          Teo) ——<d[                    to]      |                                   TTTTTTCCCC~™Y
    Noosaville, Project Ave Stormwater Drainage Easement Upgrade             237 ,324|       -152,324       85,000                Revised schedule with procurement underway and construct to
                                                                                                                   2021/22        start June 2021 into the 2021/22 financial year
    Sunrise Beach Sobraon Street Slope Stabiisation - 4G &LRCI               Teel                 —i|      teamey            CE                                                    CSC~SCS
   Marcus Beach DLW -Emergent Stormwater Culvert Works              |                        266,210       266,210                Emergent works to address abutment B on Marcus Beach
                                                                                                                   Works          stormwater culverts
   Total Stormwater Drainage                                               1,264,860         113,886      1,378,746
   ‘Transport and  Infrastructure Management                                                                      {|
    Whole of Shire Forward Planning & Design Program                         500,000]                      500,000)
    Tewantin, Hitton Tce & Emest St intersection Upgrade                   Tasso]                         SiC] PTC
    Sunshine Beach Pacific Avenue Pathway, Pedestrian & Dranage               moe]                 Sid      SCO OOOCOCOCOCOCSCSCSCSSY
    Transport Strategy, Walking & Cycling Strategy &CNLG Grant               2s0as6f                       06]
   Total Transport and Infrastructure Management                          2,210,701                0     2,210,701
   Waste Management                                                                                               |
    Noosa Heads The
5	1	1	1	54	4	328	2444	82	19	83	Woods Bin Storage Enclosure samo]                                                                                        COCSCSCSCSCSC*dS
    Masterplan Landfill SW Controls & Design                                 115.466)                     115,466f
    illegal Dumping Hotspot                                                   59.433}                        9,43]
    Noosaville Eumundi Road Landfill Outbound Weighbridge                    560,000         -480,000       80,000 | Delay into   Works delayed due to revision of tender and scope. Scheduled for
                                                                                                                   2021/22        construction in 2021/22
    Noosaville Eumundi Road Landfill Liner, Cell capping design            2,110,000       -1,910,000      200,000 | Delay into   Works delayed due to revision of scope. Scheduled for
                                                                                                                   2021/22        construction in 2021/22
    Noosaville Eumundi Road Landfill Expansion of Resource Recovery Area     750,000         -700,000       50,000                Works delayed due to revision of scope. Scheduled for
                                                                                                                   2021/22        construction in 2021/22
   Total Waste Management                                                 3,653,356        -3,090,000      $63,356

Shit mer Tel                                                              6,480,000                 0    6,480,000
   Asset Management                                                                                               AL                                                                        !
    Shire Bridge Annual Level 3 Inspections Annual                            S5o00f                       55000
    Zero Emissions Noosa Project Implementation                              521655]                       524655]
    Shire CCTV Dranage Condition Assessment Program Annual                   7000     _———+4dt             nooo]             Sid SCCCCCSCSCSCOCCCC~C~S
    Shire Road Infrastructure Asset Data Mat & Condition Annual              340,000f                      840,000
    Asset Management Systems Implementation                                  200,000]                      200,000)
    Noosa Junction Streetscape                                                oof                +          000d SSCS
   Total Asset Management                                                  1,382,655               0      1,382,655
   Fleet - Plant Replacement                                                                                      |
                                                                                                                                                           Page 18 of 43

Section 19

GENERAL COMMITTEE MEETING AGENDA   12 APRIL 2021




                                   Page 19 of 43

BR2        Proposed           BR3 | Change
 Project                                                                     F         *roposet            R3 | Chang         natails
   2                                                                     Budget        Changes        Budget | Category        .
 Plant and Fleet Replacement Program                                   Tae]                  Sirs] i                                                          TTCCTTTCTCCS™Y
Total Fleet - Plant Replacement                                        1,234,345               0     1,234,345
Information Technology                                           E                                            |              Z                                                        !
 Imblemienfainn of Gl Anywlere Functionally for Technoteuyone            XT
Total Information Technology                                            713,000                0      713,000

     Capital Debt Redemption                                           Zao]             SiC TTTCTCTCTTC~S™
Total Other                                                            2,414,000               0     2,414,000
Planning Scheme Expansion
 Whole of Shire, Clmate Change Adaptation Strategy                      A a
 Whole of Shire, Project Team Resources for New Planning Sche           301,000          120,000)     421,000                Reallocation of Strategic Planning resources based on status of
Shire Planning Scheme Constancy                                          Tapp |                        tooo]                 projects
 Shire Project Place Spaced Approach - Placemaking Pilot Program         125,000)       -120,000      ae Reallocation of Strategic Planning resources based on status of
                                                                                                                             projects
Total Planning Scheme Expansion                                         736,000                0      736,000

Grand Total                                                          35,392,327       4,149,502    31,242,825

                                                                                                                                                      Page 19 of 43

Section 20

Page 20 of 43

Noosa Shire Council
 2020/21 Capital Budget Review 3 - Capital Program                                                                                                                                                        ATTACHMENT 3
 Renewal Projects                                                                                                                                       _                                                2          ;
Program                                      ete a lice                                                                                         Grants   External Funds          Loans   LevyReserves     General Rates            Total
 Capital Works
  Bridges                                    Cooran Tablelands Road B Bridge Renewal                                                            250,000.                |                                               0        250,000
  Bridges                                    Eenie Creek Road Pedestrian Bridge Renewal                                                         100,000                 |                                                        100,000
  Bridges                                    Kin Kin Wahpunga Lane Bridge Renewal                                                               463,661                 |                                       -341,661         122,000
  Bridges                                   ‘Sunrise Beach Orealla Bridge Renewal                                                               412,380.                |                                       2,337,953       2,750,333
  Bridges                                    Tewantin Doonella Bridge Renewal                                                                                                                                     50,000          50,000
  Bridges                                    Cooroy Belli Creek Road Bridge Replacement                                                                |                |                                          35,000         35,000
  Bridges                                    Garth Prowd Bridge Replacement                                                                            |                |                                         50,000          50,000
  Bridges                                    Lawnville Road Bridge, Black Mountain                                                                                                                                35,000          35,000
  Bridges                                    Monks bridge abutment relieving slab repairs                                                              |                |                               |         90,000          90,000
  Bridges                                    Directional Signage _ Hilton Terrace                                                                      |                |               |               |         20,000          20,000
   Coastal Canals and Waterways              Noosa Heads Dog Beach SEMP                                                                                                                                          110,000         110,000
   Coastal Canals and Waterways              Noosa Waters Revetment Vall                                                                               |                |                         40,000           70,000        110,000
   Community Facilities                      Community Facilities - Other Minor Works                                                                  |                |                                         57,500          57,500
   Community Facilities                      Cooroy Lower Mill Site Shed - Remove and Replace Amenities                                          50,000                 |                                              0          50,000
   Community Facilities                      Lifeguard Tower Renewal works                                                                       57,000,                |               |               |                |        57,000
   Community Facilities                      NAC - Renewal Program                                                                                                                                                 13,435         13,435
   Community Facilities                      NAC - Replacement of Light Pole Fittings                                                                                                                              59,500         59,500
   Community Facilities                      Pomona Memorial School of Arts Hall - Amenities Upgrade                                            264,000         45,000                                                 0         309,000
   Community Facilities                      Shire Community Halls and Facilities Renewals                                                      270,000                                                               om)        270,000
   Community Facilities                      Shire Electrical Distribution Board Renewals                                                        60,000                                                            60,000        120,000
   Community Facilities                      Tewantin - Building Renewal Works Tewantin Sports Complex                                          150,000                 i               i               [              0         150,000
   Community Facilities                      The J Community Centre seating refurbishment                                                       100,000                 |                                          20,000        120,000
   Community Facilities                      Tinbeerwah Hall Cladding and Roof refurbishment                                                    150,000                                                                          150,000
   Community Facilities                      NAC switchboard replacement                                                                               |                                                         135,000         135,000
   Gravel Road Network                       Shire Gravel Resheeting - Annual Program                                                                 Oo                |               |               |        410,000.        410,000
   Libraries & Galleries                     Cooroy Library Renewal of CCTV Cameras                                                                                                                               25,000          25,000
   Libraries & Galleries                    Whole of Shire Mobile Library Service Solution                                                             |                |                                        350,000         350,000
   Parks & Playgrounds                       Noosaville Pandorea Park Playground Renewal                                                              0                 |                                         55,000          55,000
   Parks & Playgrounds                       Renewal of Noosa waters - Seagull Playground & Lake Macdonald Playground                           170,000.                                                          20,000         190,000
   Pathways & Boardwalks                     Noosa Heads Main Beach Boardwalk LED Lighting Renewal                                                     |                |               |               |        120,000.        120,000
   Pathways & Boardwalks                    ‘Noosaville Wallace Park Pathways Renewal Stage 3 &4                                                119,000                                                                0         119,000
   Pathways & Boardwalks                     Shire Pathway Renewal Program                                                                      332,000                                                                0         332,000
   Public Amenities                          New Amenities - United Synergies Community Building                                                 60,000.          30,000,                                                         90,000
   Public Amenities                          Public amenities renewal and upgrade works                                                         220,000                                                                          220,000
   Public Transport Infrastructure          ‘Shire Bus Shelter Disabled Compliant Program: Year 7                                               170,115.                                                          79,885.        250,000
   Sealed Roads Network                      Shire Reseal Program                                                                             1,519,537.                |               |               l      2,570,000        4,089,537
   Sealed Roads Network                      Shire Sealed Road Network Rehabilitation and Reconstruction Priority                                     oO         790,000.                                              0         790,000
   Stormwater Drainage                       Noosaville Gympie Terrace Stormwater Renewals                                                                              |                                         40,000          40,000
   Stormwater Drainage                       Shire Bioretention Basin Renewals Program                                                                 |                |                                         72,190          72,190
   Stormwater Drainage                       Sunrise Beach Sobraon Street Slope Stabilisation                                                   915,346                                 |               |               0        915,346
   Stormwater Drainage                       Marcus Beach DLW -Emergent Stormwater Culvert Works                                                       |                |                                        266,210         266,210
   Transport and Infrastructure Management   Shire Forward Planning & Design Program Construction Ready Designs                                  79,375                 |                                        420,625         500,000
   Transport and Infrastructure Management   Sunshine Beach Pacific Avenue Pathway, Pedestrian & Drainage                                              |                |                                         24,608          24,608
   Transport and Infrastructure Management   Tewantin Hilton Terrace & Ernest St Intersection Upgrade Construction                                                                                      {       1,435,597       1,435,597
 Capital Works Total                                                                                                                            912,414          865,000                          40,000        8,690,842     15,508,256
   Asset Management                          Noosa Junction Streetscape                                                                                |                |                         46,000                          46,000
   Asset Management                          Shire Bridge Annual Level 3 Inspections                                                                   |                |               |                         55,000          55,000
   Asset Management                          Shire CCTV Drainage Program                                                                               |                |                                        220,000         220,000
   Asset Management                          Shire Road Infrastructure Asset Data Management & Condition Program                                      Oo                |                                        340,000         340,000
   Asset Management                          Bushfire Disaster Recovery Cat D - capital works component                                                |                |                               |                        135,000
   Fleet - Plant Replacement                 Council Fleet and Plant Replacement Program                                                                                                                        1,234,345       1,234,345
Other Capital Total                                                                                                                      |     _     0              =                   ’        46,000         1,849,345       2,030,345

                                                                                                                                                                                                              Page 20 of 43

Section 21

Page 21 of 43

Noosa Shire Council
2020/21 Capital Budget Review 3 - Capital Program

Upgrade, New and Expansion Projects
Program                                    ered tC                                                                                           Grants   External Funds          Loans   LevyReserves     General Rates           Total
ery
  Community Facilities                     Cooroy Butter Factory - Security Fence                                                             10,000                                                                0         10,000
  Community Facilities                     Noosa Regional Gallery Foyer & Amenities upgrade                                                  200,000                                                                         200,000
  Community Facilities                     Noosa Triathlon Club clubroom alterations                                                           3,000                                                                           3,000
  Community Facilities                     Peregian Beach 5 Rufous St Redevelopment Digital Hub Expansion                                                                                                      17,827         17,827
  Community Facilities                     Peregian Beach 5 Rufous St Redevelopment Project Management                                                                                                         55,343         55,343
  Community Facilities                     Peregian Beach 5 Rufous St Redevelopment Stage 3 Construction                                      80,179                                                        2,126,997       2,207,176
  Community Facilities                     Shine House - Stand Alone Unit Construction                                                       250,000           70,000                                               0        320,000
  Community Facilities                     Sunshine Beach Skate Park New Shade Structure                                                     150,000                                                                         150,000
  Community Facilities                     Tewantin Netball Courts Upgrade                                                                   310,000                                                                         310,000
  Community Facilities                     Living FireTech Laboratory                                                                        568,351                                                                               0
  Corporate Buildings                      Noosaville Depot Roof Replacement                                                                                                                                                  84,602
  Environmental Assets, Bushland, Tracks and
  Trails                                    Environment Land Purchase - Lake Front Rd, Boreen Point                                                                                          950,000                0        950,000
  Holiday Parks                            Boreen Point Campground Upgrade Works                                                             410,000                                                                         410,000
  Parks & Playgrounds                      Cooroy Hinterland Playground                                                                            0                                                        1,220,000       1,220,000
  Pathways & Boardwalks                    Noosa Heads Sunshine Beach Road Pathway Lighting Upgrade                                          150,000                                                                         150,000
  Pathways & Boardwalks                    Noosaville Sea Eagle Drive & Shire Drive Pathway Upgrades                                                                                                          163,137        163,137
  Pathways & Boardwalks                    Noosaville Sea Eagle Drive Pathway upgrats STIP Grant                                             195,000                                                                         195,000
  Pathways & Boardwalks                    Peregian Beach Boardwalk Upgrade North of Tower to Access 57                                      230,000                                                                         230,000
  Pathways & Boardwalks                    Tewantin, Hilton Terrace CNLGGP Shared Pathway                                                                                                                       6,568          6,568
  Pathways & Boardwalks                    Ivory Palms Shared Pathway Upgrade                                                                                                                                225,297         225,297
  Pathways & Boardwalks                     Noosa Heads Noosa Parade Road Corridor Upgrade                                                  1,115,000                                                                        100,000
  Pathways & Boardwalks                     Cooroora Trail Loop and Trail Hub                                                                483,218                                                                         240,000
  Sealed Roads Network                     Damaged Guardrail Renewals (Various)                                                                                                                                25,768         25,768
  Sealed Roads Network                     Tewantin Beckmans Rd Bypass Forward Design                                                        600,000                                                                         600,000
  Stormwater Drainage                      Noosaville Project Avenue Stormwater Drainage Easement Upgrade                                                                                                      85,000         85,000
  Transport and Infrastructure Management  Cooroy Maple Street - Car Parking and Raised Pedestrian Crossing (Hinterland Playground)                0                                                         347,000         347,000
  Transport and Infrastructure Management  Transport Strategy, Walking & Cycling Strategy and CNLG Grant Applications (2 Year Program)        22,500                                                         227,996         250,496
  Waste Management                         Illegal Dumping Hotspot                                                                            10,030                                                           49,403         59,433
  Waste Management                         Noosa Heads The
5	1	1	5	31	6	1010	1416	98	22	96	Woods Bin Storage Enclosure                                                                                         58,457         58,457
  Waste Management                         Noosaville Eumundi Road Landfill Design Stormwater Controls for Cell 2.3                                                                                           115,466        115,466
  Waste Management                         Noosaville Eumundi Road Landfill Expansion of Resource Recovery Area                                                                    0                                          50,000
  Waste Management                         Noosaville Eumundi Road Landfill Liner, Cell capping design and associated clearing works                                               0                                         200,000
  Waste Management                         Noosaville Eumundi Road Landfill Outbound Weighbridge                                                                                   0                                          80,000
Capital Works Total                                                                                                                        4,787,278           70,000              0         950,000       4,724,259        9,119,570
  Asset Management                         Asset Management Systems Implementation                                                                 0                                                         200,000         200,000
  Asset Management                         QTC Capital Debt Redemption                                                                               |               |              |                |     2,414,000        2,414,000
  Information Technology                   Technology One Cl Anywhere Systems Implementation                                                                                                                 713,000         713,000
  Planning Scheme                          Climate Change Adaptation Program                                                                  98,000                 |                               |        112,000        210,000
  Planning Scheme                          Shire Project Place Based Approach - Placemaking Program                                                 |                |              i                |         40,000         40,000
  Planning Scheme                          Shire Project Team Resources for + Planning scheme amendment and supporting policy                                                                                486,000         486,000
  ZEN Program                              Zero Emissions Noosa Project Implementation                                                              |                                                !       521,655.        521,655
Other Capital Total                        i                                                                                        ;         98,000 —        ——                   sai         eet          4,486,655   SE 4,584,655

                                                                                                                                                                                                        Page 21 of 43

Section 22

GENERAL COMMITTEE MEETING AGENDA   12 APRIL 2021




                                   Page 22 of 43

GENERAL COMMITTEE MEETING AGENDA                                                               12 APRIL 2021

Noosa Council                                                                                    ATTACHMENT 4
Statement of Income and Expenditure
For the Year Ended 30 June 2021
                                                       Original Current Budget            Proposed        Revised BR3
                                                        Budget                         Adjustments              Budget
                                                         ($'000)          ($000)              ($000)             ($'000)

Revenue
   Recurrent Revenue
   Rates, levies and charges                              68,388           68,388                936             69,324
   Fees & charges                                          6,640            6,640                409               7,048
   Interest received                                        870               870                   -               870
   Sale of Goods and major services                        7,254            7,296               at Vt             10,013
   Sale of contract and recoverable works                    23                23                   -                23
   Rental & lease income                                   1,197             1,197                  -              1,197
   Other income                                             771               796                 69                865
   Grants, subsidies, contributions and donations          5,406            6,100                 73               6,173
   Unitywater Distributions                                5,650            5,650                                  5,650
                                                          96,198           96,958              4,203            101,162
Expenses
   Recurrent Expenses
   Employee benefits                                      34,656           34,752                116             34,868
   Matenals & services                                    42,671           44,473              2,078             46,551
   Finance costs                                           1,538             1,538                  -              1,538
   Depreciation                                           18,963            18,963                  -             18,963
   Other expenses                                            189              189                   -               189
                                                          98,017           99,915              2,194            102,109
Operating Result                                         (1,819)           (2,957)             2,009               (947)

Summary of Capital Expenditure and Funding

Capital Funding Sources
   Capital contributions and donations                     3,521            3,521                100               3,621
   Grants, subsidies, contributions and donations          7,254            11,642                46              11,688
   Cash / revenue                                         14,842            18,810              (875)             17,934
   New loan borrowings                                     3,420            3,420             (3,420)                  -
   Other capital revenue                                       -                 -                  -                  -
Total Capital Funding Sources                            29,037            37,392             (4,150)            33,243
Capital Expenditure
   Contributed assets                                      2,000            2,000                   -              2,000
   Capital works - constructed assets                     21,419           28,912             (4,150)            24,763
   Capital works - other capital                           3,204            4,066                   =              4,066
   Loan redemption                                         2,414            2,414                   -              2,414
   Other capital expenses                                      -                 -                  -                  -
Total Capital Expenditure                                 29,037           37,392             (4,150)            33,243

                                                                                                     Page 22 of 43

Section 23

Page 23 of 43

ATTACHMENT 5

se  NOOSA COUNCIL         am       tans

                        2020/2021               ~
                 BUDGET REVIEW 3 (BR3)
                FINANCIAL STATEMENTS

                                                        Page 23 of 43

Section 24

Page 24 of 43

Noosa Shire Council
 2020/21 Budget Statements
 For the period ending 30 June
                            .                                    Original
                                                       2020       2021        2021        2021        2021       2022        2023        2024       2025        2026        2027        Pips)      2029        Pk
 Statement of Comprehensive Income                    Buty        BAT         CH tT)     EAT         SAT)       BAT          BAT)       AT)         $,000      EAT)         $,000     EAT]         $,000       $,000
 —                                                Pe
 Revenue
   Operating revenue
   Net rates, levies and charges                    $ 69,238 | $ 68,388]    $ 68,388]   $ 68,388]  $ 69,324]   $ 71,328    $ 73,797   $ 76,175    $ 78,155    $ 80,186    $ 82,270   $ 84,408    $ 86,601    $ 88,852
   Fees and charges                                 $   6445]   $   6640]   $   6640|$      6640]  $   7,048)  $   6931    $   7,127  $   7,296   $   7,521   $   7,753   $   7,991  $   8238    $   8466    $   8,701
  Rental income                                     $    1,003] $   1,197]  $   1,197]  $   1,197] $   1,197]  $   1,396   $   1,475  $    1,512  $   1,542   $   1,573   $   1,605  $   1,637   $   1,669   $   1,703
   Interest received                                $    1,545/$      870/$       870/$      870|$       s870|$      876   $    847   $     828   $     812   $     823   $    847   $     865   $     886   $    908
   Sales revenue                                    $   8485|$      7,276]  $   7,319]  $   7,319] $ 10,036]   $ 10,044    $ 10984    $ 11,259    $ 11,605    $ 11,963    $  12,332  $  12,712   $  13,064   $  13,426
  Other income                                      $    1,074] $     771)  $     771)  $    796 | $     865]  $     878   ¢    923   $     946   $     975   $   1,008   $   1,036  $   1,068   $   1,098   $   1,128
   Grants, subsidies, contributions and donations   $   5447]   $   5406|$      5741]  $    6099]  $   6173/$      518     $   5082   $   5080    $   5080    $   5080    $   5080   $   5080    $   5080    $   5,080
   Unitywater Distributions                         $   5645]   $   5650]   $   5650]   $   5650]  $   5650]   $   5650    $   5650   $   5650    $   5650    $   5650    $   5650   $   5650    $   5650    $   5650
   Total operating revenue                          $ 98,882]   $ 96,198]   $ 96,576 | $ 96,958 | $101,162 | $102,286      $105,885   $108,746    $111,340    $114,033    $116,810   $119,656    $122,515    $125,448
   Capital revenue
      Government subsidies and grants - capital     $   5241]   $   7,299]  $ 11,385]   $ 11,687]  $ 12023]    $   6395    $   3012   $   3236    $   1,762   $   1,312   $   1,312  $   1,312   $   1,612   $   1,312
      Contributions - Assets and other non-nonetary $    1,099] $   2,000}  $   2,000}  $   2000]  $   2000}   $   2,000   $   2000   $   2000    $   2,000   $   2000    $   2000   $   2,000   $   2000    $   2,000
     Contributions - Monetary                       $   2058|$      1476|$      1476|$      1476|$     1476|$      2000    $   2000   $   2000    $   2000    $   2000    $   2000   $   2000    $   2000    $   2,000
   Total capital revenue                            $   3,398   $ 10,775|   $ 14,861 eae           $ 15,498]   $ 10,395    $   7,012  $   7,236   $   5,762   $   5312    $   5312   $   5312    $   5612    $   5,312
   Total revenue                                    $ 107,280 | $ 106,973 | $111,437 | $112,121 | $ 116,660 | $112,681     $112,897   $115,982    $117,102    $119,345    $122,122   $124,968    $128,127    $ 130,760
   Capital income
   Total capital income                             $     -     $     -     $     .     $     &    $     .     $     “i    $    Fs    $     i     $           $     <     $    es    $     fs    $     es    $     =
 Total income                                       $ 107,280 | $ 106,973 | $ 111,437              $ 116,660 | $112,681    $112,897   $115,982    $117,102    $119,345    $122,122   $124,968    $128,127    $130,760
 Expenses
   Operating expenses
   Employee benefits                                $ 32996]    $ 34,656]   $ 34,806]   $ 34,752]  $ 34,868]   $ 36,013    $ 37,091   $ 38,061    $ 39,343    $ 40,664    $ 42,027   $ 43433     $ 44,882    $ 46,377
   Materials and services                           $ 42454|    $ 42,671 | $ 43,293]    $ 44,473 | $ 46,551 | $ 45,563     $ 47,080   $ 48464     $ 49,294    $ 50,497    $ 51,626   $ 52,679    $ 54,708    $ 56,364
   Finance costs                                    $   4688]   $   1,538]  $   1,538]  $   1,538|]$   1538]   $   1343    $   1179   $     999   $     80    $     600   $    502   $     489   $     477   $    466
   Depreciation and amortisation                    $  16,522]  $ 18,963]   $ 18,963]   $ 18,963]  $ 18,963]   $ 19,664    $ 20,235   $ 20,722    $ 21,243    $ 21,730    $ 22,216   $ 22,688    $ 22,127    $ 21,817
   Other expenses                                   $     180 | $     189 | $     189]  $    189 | $     189 | $     189   $     189  $     189   $     193   $     197   $    202   $     206   $     211   $    216
   Total operating expenses                         $ 96,840]   $ 98,017]   $ 98,789]   $ 99,915 | $102,109 | $102,772     $105,774   $108,435    $110,877    $113,689    $116,572   $119,495    $122,405    $125,239
   Capital expenses
   Total capital expenses                           $   4,151]  $     -     $     -     $     -    $     -     $     s     $    zs    $     2     $     e     $     z     $     .    $     4     $     Bs    $     si
   Total expenses                                   $100,991 | $ 98,017]    $ 98,789]   $ 99,915 | $102,109 | $102,772     $105,774   $108,435    $110,877    $113,689    $116,572   $119495     $122,405    $125,239
 Net result                                         $   6,290]  $   8956]   $ 12,648]   $ 12,206               $   9909    $   7,123  $   7,547   $   6,225   $   5,656   $   5,550  $   5474    $   5,722   $   5,521
 Operating result
 Operating revenue                                  $ 98882]    $ 96,198]   $ 96576]    $ 96,958]  $101,162}   $102,286    $105,885   $108,746    $111,340    $114,033    $116,810   $119,656    $122,515    $125,448
Operating expenses                                  $ 96,840 | $ 98,017 | $ 98,789]     $ 99.915]  $102,109 | $102,772     $105,774   $108435     $110,877 _ $113,689     $116,572   $119495     $122405     $125,239
Operating result                                    $   2,043   |($ 1,819)  }($ 2,213)  |($ 2,957              $    486)   $     111  $     310   =$    463   $     344.  $    238 = $     162   $     110   $    209

                                                                                                                                                                                                  Page 24 of 43

Section 25

Page 25 of 43

Noosa Shire Council
 2020/21 Budget Statements
 For the period ending 30 June
                                                              Original
                                                   2020         2021         pa         Pipa        2021         2022        2023        2024         2025        2026        2027         2028        2029        2030
 Statement of Financial Position                   aT)         RMT)       BAL)          $,000       Sa         BAI         Sa]           at          $,000        Bm)         St          SIT          RAI)        SALT]
Assets                                         Ti EO                      CCC
   Current assets
   Cash and cash equivalents                    $   57,024|$     47,536]/$   43,.016/$   52550/$      554511$     49,705  $   45,759  $   41,675   $   42603   $   43470   $   45,202   $   48,118  $   50,837  $   53,062
   Trade and other receivables                  $    8883|/$      9054/$      9085/$      9117]/$      9471]/$     9623   $    9,983  $    10253   $   10543   $   10812   $    11,088  $   11,340  $   11,657  $    11,951
   Inventories                                  $      181] $       1981 $      198|$       181] $      181] $       181  $      181  $      181   $      181  $      181  $      181  $       181  $      181  $      181
   Other current assets                         $    2912/$       2466/$      2466/$      2912]/$      2912]/$     2912   $    2912   $     2912   $    2912   $    2912   $     2912  $     2912   $    2912   $    2,912
  Total current assets                          $   69,000/$     59,255/$    54.765/$    64,760]/$    68015|/$    62421   $   58,835  $    55,021  $   56,239  $   57,375  $   59,383   $   62,551  $   65,587  $   68,107
   Non-current assets
   Investments                                  $  140,633 | $  136,360] $  136,360]$   140,633] $   140,633]$   140633   $  140,633  $   140,633  $  140633   $  140,633  $   140,633  $  140,633  $  140,633  $   140,633
  Property, plant & equipment                   $  929,355|$    940480|$    948,640] $  961,982] $   957,832] $  989,525  $1,016,658  $1,044,819   $1,067,074  $1,089,163  $1,113,917   $1,138,093  $1,163,335  $1,188,914
   Other non-current assets                     $    7,797 | $    7,688 | $   7,773  1$   8,400] $     8,400 | $   8,008  $    7,207  $     6,381  $    5,530  $    4,654  $     3,763 3     2,826  $    1,875  $     1,476
  Total non-current assets                      $ 1,077,785 | $ 1,084,528 | $ 1,092,773 | $1,111,014 | $ 1,106,865 | $1,138,166 $1,164,498 $1,191,833 $1,213,237 $1,234,450 $1,258,303  $1,281,553  $1,305,844  $1,331,022
  Total assets                                  $ 1,146,785 | $ 1,143,782 | $ 1,147,538 | $ 1,175,774 | $ 1,174,880 | $ 1,200,587 $1,223,333 $1,246,854 $1,269,476 $1,291,825 $1,317,686 $1,344,104 $1,371,431  $1,399,129

   Current liabilities
  Trade and other payables                      $    7692/$       6356/$      6419/$      6512]$       66921/$     6705   $    6918   $     7092   $    7,285  $    7493   $     7697  $     7878   $    8186   $    8,444
   Borrowings                                   $    3023/$       3116]/$     3,116/$     3152]/$      2831/$      3043   $    3,222  $     3417   $    3,622  $      491  $      385  $       396  $      328  $      244
  Provisions                                    $     7582/$      4630/$      4630/$      7582]/$      7582]/$     7,582  $    7,582  $     7,582  $    7582   $    7,582  $     7,582 $     7,582  $    7,582  $    7,582
  Other current liabilities                     $    4,780|$      2778/$      2778/$      4780/$       4780/$      4,780  $    4,780  $     4780   $    4780   $    4,780  $    4,780  $     4,780  $    4,780  $    4,780
  Total current liabilities                     $   23,077/$     16879|/$    16942]$     22026]$      21,885/$    22,109  $   22502   $    22871   $   23,269  $   20346   $   20444    $   20,636  $   20,876  $   21,051
   Non-current liabilities
  Borrowings                                    $    18494]/$    19637|$     19637/$     19114]$      16015]$     13413   $   10191   $     6774   $    3152   $    2661   $     2,276 $     1,880  $    1,552  $     1,308
  Provisions                                    $    15,307|$    12,054]$    12054]/$    15307]$      15,307]$    15,307  $   15,307  $    15,307  $   15,307  $   15307   $    15,307  $   15,307  $   15,307  $    15,307
  Total non-current liabilities                 $   33,910/$     31,691/$    31,691]$    34531]$      31432]$     28830   $   25607   $    22,191  $   18569   $   18078   $    17,693  $   17,297  $   16,968  $    16,724
   Total liabilities                            $   56,987]$     48,570]$    48,633|/$   56,557]$     53,317/$    50,939  $   48110   $   45,062  $    41,838  $   38424   $   38,137  $    37,933  $   37,844  $   37,775
 Net community assets                           $ 1,089,797 | $ 1,095,213 | $ 1,098,905 | $ 1,119,217 | $ 1,121,563 | $1,149,648 $1,175,224 $1,201,793 $1,227,638 $1,253,401 $1,279,548 $1,306,171  $1,333,587  $ 1,361,354
 saaatepaaiy                                             COTE
  Asset revaluation surplus                     $   86,524|$     85,293]$    985,293]$  103,738] $   103,738]$   121,536  $  139,987  $   159,010  $  178630   $  198,737  $  219,335   $  240,484  $  262,178  $  284,425
  Retained surplus                              $ 1,003,273 | $ 1,009,920 | $ 1,013,612 | $ 1,015,479 | $ 1,017,825 | $1,027,734 $1,034,857 $1,042,403 $1,048,629 $1,054,284 $1,059,834 $1,065,308  $1,071,029  $1,076,550
   Total community equity                       $ 1,089,797 | $ 1,095,213 | $ 1,098,905 | $ 1,119,217 | $ 1,121,563 | $ 1,149,269 $1,174,844 $1,201,414 $1,227,259 $1,253,022 $1,279,169 $1,305,791 $1,333,207  $ 1,360,975

                                                                                                                                                                                                    Page 25 of 43

Section 26

Page 26 of 43

Noosa Shire Council
   2020/21 Budget Statements
    For the period ending 30 June
PAnuaresut                                                 ctu    ST oe Tent [ere | ers forecast
   Annual Result                                           Actual       Budget
                                                            2020         Plova         2021         Ply            2021         yliya)        2023         yliye |       2025          2026         2027          yltys)       2029          2030
   Statement of Cash Flows                                 Cme18)         $,000        Emel] 0)      $,000        Emel] 0)      $,000         $,000        $,000         $,000        $,000         $,000         $,000        $,000         $,000

      Receipts from customers                           $    91168]    $   83296]   $    83309]   $   82924]    $   86722|$      88964     $   92469    $   95407     $   O7970    §$  100640    $  103355     $  106,174   $  108,916    $  111,816
      Payments to suppliers and employees              ($    82,671)  1{$ 76,649)   |($ 77,358)  |($  81,041)  1($ 83,054)  |($  82,164)  ($  84,559)   ($  86,952)  ($  89,048)   ($  91,563)  ($   94,062)  ($  96,550)   ($  99,906)  ($ 103,109)
      Dividend received                                 $      3,254]  $    3050]    $    3050]$       3050]/$       3050]/$       3050    $    3050     $    3050    $    3050     $    3050    $     3050    $    3050    $     3,050   $    3,050
      Interest received                                 $      3,937 | $    3470)    $    3470)   $    3470|$        3470)   $     3476    $    3447    $     3428    $    3412     $    3423    $     3447    $    3465    $     3486    $    3,508
      Rental income                                     $      1003]   $    1,200)   $    1,199]  $     1194]   $    1191]/¢       1380    $    1469     $    1509    $    1539     $    1571    $     1602    $    1634    $     1,666   $    1,700
      Non-capital grants and contributions              $      5315]   $    5418]    $    57521$       6087|$        6141]$        5265    $    5090     $    5081    $    5079     $    5080    $     5080    $    5081    $     5079    $    5,080
      Borrowing costs                                  ($       143)  1($ = 1,126)  |($ = 1,126) |($ = 1,092)  1($ = 1,092) | ($    931)  ($     767)   ($     587)  ($     393)   ($     188)  ($       90)  ($      77)   ($      65)  ($       54)
      Other cash flows from operating activities        $        =     $      =     $       -     $      -      $      -     $       -     $      -     $       -     $      -      $      -     $       -     $      -     $       =     $       -
      Net cash flow from operating activities                          $   18658]   $    18,296]$     14592]   $    16428]   $   19039     $   20,199   $   20937     $   21609     $   22013    $   22,383    $   22,778   $   22,227    $   21,991
   Cash flows from investing activities
      Payments for property, plant and equipment       ($    23,830)  |($ 23,259)   |(@ 31,419)  ]($  31,529)  ]($ 27,380)  |($  30,189)  ($  25,865)   ($  26,784)  ($  20,776)   ($  20,586)  ($   23,221)  ($  22,539)  ($   22,473)  ($  22,749)
      Payments for intangible assets                   ($     2,088)  |($   1,364)  /($  1,449)  |($   1,449)  ]($  1,449)  ](¢     600)  ($     250)   ($     250)  ($     250)   ($     250)  ($      250)  ($     250)   ($     250)   $       es
      Grants, subsidies, contributions and donations    $      8.640]  $    8775]   $    128611   $   13162]$       13498]   $     8395    $    5012     $    5236    $    3762     $    3312    $     3312    $    3312    $     3612    ¢$   3,312
      Other cash flows from investing activities        $        125 | $      -     $       -     $       -     $      -     $       -     $      -     $       -     $       -     $      -     $       -     $      -     $       =     $       5
      Net cash flow from investing activities          ($    16,870)  |($ 15,848)   |($ 20,007)  |($  19,816)  |($ 15,330)  |($  22,394)  ($  21,103)   ($  21,798)  ($  17,264)   ($  17,524)  ($  20,159)   ($  19,477)   ($  19,111)  ($  19,437)
   Cash flows from financing activities
      Proceeds from borrowings                          $        -     $    634201   $    3420|$       3420]    $      =     $      440    ¢      -     $       -     $      -      $      -     $       -     $      -     $       -     $       -
      Repayment of borrowings                          ($     3,950)  |($  2.636)   ]($  2,636)  1($   2,670)  ]($  2 670)]($     2,831)  ($   3,043)   ($   3,222)  ($    3417)   ($   3,622)  ($      491)  ($     385)   ($     396)  ($     328)
      Net cash flow from financing activities                          $      784 | $      784 | $       750   |($  2,670)  |($   2,391)  ($   3,043)   ($   3,222)  ($   3,417)   ($   3,622)  ($      491)         385)   ($     396)  ($     328)
   Total cash flows
   Net change in cash and cash equivalent held        1$ = 1,043 | $       3,594 | ($      926)  |($   4,474)  |($  1,573)  |($   5,746)  ($   3,946)   ($   4,083)   $      928    $      867   $     1,732   $    2,916   $     2,719   $    2,226
   Opening cash and cash equivalents                    $    55,981]   $   43,942 |$ 43.942 |     5   57,024 | $    57,024]  $   55451     $   49,705   $   45,759    $   41675     $   42603    $   43,470    $   45,202   $   48,118    $   50,837
  Closing cash and cash equivalents                   |$     87,024] $ 47536|$ 43,016|$ 52550] $ 55,451|$                        49,705    $   45,759   $   41675     $   42,603    $   43470    $   45,202    $   48,118   $   50,837    $   53,062

                                                                                                                                                                                                                          Page 26 of 43

Section 27

Page 27 of 43

Noosa Shire Council
2020/21 Budget Statements
For the period ending 30 June
                                                          Original
Annual Result                                             Budget
                                               2020         Palys       2021        2021        yal ya     vale a4     PAL          2024        yal As)      2026       Pala g       2028        2029        Pale
Statement of Changes in Equity                 Ce          CUT!         eT          ea!         CeUTITH     Cay!        eT          Cm!        $,000        ETT!        Ce           Cay!        ERITH       CMU!

  Opening balance                            $   50,809/$    68,337]$    68,337|$    86,524]$    986,524]$  103,738  $  121,536  $   139,987 $   159,010  $  178,630  $  198,737  $  219,335  $  240,484  $  262,178
  Change in asset revaluation surplus        $   35,715|$    16,956]$    16,956|$    17,214]$    17,214]$    17,797  $    18452  $    19,023 $    19,620  $   20,107  $   20,598  $   21,149  $   21,694  $   22,247
 Closing balance                             $   86,524/$    85,293]$    95,293|$   103,738]$   103,738]$   121,536  $  139,987  $   159,010 $   178,630  $  198,737  $  219,335  $  240,484  $  262,178  $  284,425
Retained surplus
  Opening balance                            $  991,767 | $ 1,000,964 | $ 1,000,964 | $ 1,003,273 | $ 1,003,273 | $1,017,825 $1,027,734 $1,034,857 $1,042,403 $1,048,629 $1,054,284 $1,059,834 $1,065,308 $1,071,029
 Net result                                 $    11,506/$     8956]$     12,648]/$   12,206]$    14,551|$     9,909  $    7,123  $     7,547 $     6225   $    5656   $    5550   $    5474   $    5,722  $    5,521
 Closing balance                             $ 1,003,273 | $ 1,009,920 | $ 1,013,612 | $ 1,015,479 | $ 1,017,825 | $ 1,027,734 $1,034,857 $1,042,403 $1,048,629 $1,054,284 $1,059,834 $1,065,308 $1,071,029 $1,076,550
Total
  Opening balance                            $ 1,042,576 | $ 1,069,301 | $ 1,069,301 | $ 1,089,797 | $ 1,089,797 | $1,121,563 $1,149,269 $1,174,844 $1,201,414 $1,227,259 $1,253,022 $1,279,169 $1,305,791 $1,333,207
 Net result                                 $    11506/$      8956]/$    12.648]$    12,206]/$   14551/$      9,909  $    7123   $     7,547 $     6225   $    5656   $    5550   $    5474   $    5722   $    5,521
  Change in asset revaluation surplus        $   35,715|$    16,956]$    16,956]$    17,214]$    17,214]$    17,797  $    18452  $    19,023 $    19,620  $   20,107  $   20,598  $   21,149  $   21,694  $   22,247
  Closing balance                           $ 1,089,797 | $ 1,095,213 | $ 1,098,905 | $ 1,119,217 | $1,121,563 | $ 1,149,269 $1,174,844 $1,201,414 $1,227,259 $1,253,022 $1,279,169 $1,305,791 $1,333,207 $ 1,360,975

                                                                                                                                                                                            Page 27 of 43

Section 28

Page 28 of 43

Noosa Shire Council
2020/21 Budget Statements
For the period ending 30 June

                                                Budget                                              Target
                                   Pity!)         2021        PAPA         PLP 4        PAPA                    PAUP         PAUP          yp}          2025         2026         Vip 4        2028         Pid:          PAIK)
Operating Surplus Ratio             0.0%         -1.9%        -2.3%        -3.0%        -0.9%      0-40%         -0.5%        0.1%         0.3%         0.4%         0.3%         0.2%         0.1%         0.1%         0.2%
Net Financial Liabilities Ratio    -9.4%         -11.1%       -6.3%        -8.5%        -14.5%      <60%        -11.2%       -10.1%        -9.2%       -12.9%       -16.6%       -18.2%       -20.6%       -22.6%       -24.2%
Asset Sustainability Ratio        108.4%         87.5%        101.5%       100.1%       96.1%       >90%        134.8%       122.3%       124.4%        92.7%        90.2%        95.7%       94.7%         97.5%        98.3%

Operating Surplus Ratio
Measures the extent to which revenues raised cover operational expenses
only or are available for capital funding purposes or other purposes.
Calculation: Net operating result divided by total operating revenue, expressed as a % (excluding capital revenue or expenses).
Target: between 0% and 10%.

Net Financial Liabilities Ratio
Measures the extent to which the net financial liabilities of Council can
be repaid from operating revenues.
Calculation: (total liabilities less current assets) divided by
total operating revenue, expressed as a %.
Target: not greater than 60%.

Asset Sustainability Ratio
This ratio reflects the extent to which the assets managed by Council
are being replaced as they reach the end of their useful lives.
Calculation: capital expenditure on the replacement of infrastructure assets
(renewals) divided by depreciation expense, expressed as a %.
This includes infrastructure as well as plant and equipment.
Intangibles are excluded.
Target: greater than 90%.

                                                                                                                                                                                                         Page 28 of 43

Section 29

GENERAL COMMITTEE MEETING AGENDA                                                              12 APRIL 2021


5      FINANCIAL PERFORMANCE REPORT – MARCH 2021

Author             Manager Financial Services, Trent Grauf
                   Corporate Services Department

Index              ECM/ Subject/ 22.09 – Monthly Financial Performance Report

Attachments        1.      Statement of Income and Expenditure (Profit & Loss and Capital)
                   2.      Statement of Financial Position
                   3.      Statement of Cash Flows
                   4.      Summary of Materials and Services Expenditure

EXECUTIVE SUMMARY
Year to date (YTD) operating performance against current budget as at 31 March 2021 is positive,
with operating revenues performing above forecast due largely to Council facilities and business
activity sales outperforming COVID-19 budget assumptions. Budget Review 3 (BR3), which is
detailed in a separate report included in the April 2021 General Committee Agenda, includes a
number of proposed budget adjustments which will if endorsed be incorporated into next month’s
financial performance report.

 YTD Financial Performance Summary
                                  Budget         Actual          Variance      Variance         Status
                                     $m             $m                $m             %
 Operating Revenue                  $87.5          $92.8              $5.3           6.1%      On Track
 Operating Expense                  $72.0          $72.1             -$0.1           -0.1%     On Track
 Operating Position                 $15.5          $20.7              $5.2           33.5%
 Capital Revenue                      $5.8          $9.1              $3.3           56.2%   Above Budget
 Capital Expenditure                $16.3          $16.9             -$0.6           -3.8%     On Track

Financial statements including Statement of Income & Expenditure, Statement of Financial Position
(balance sheet), and Statement of Cash Flows are included as attachments for information for
Council.

Figure 1: Actual Performance Compared to Budget
    $100
                                  $92.8      YTD Budget ($m)
                        $87.5
     $90
                                             YTD Actual ($m)
     $80
                                                                  $72.0      $72.1
     $70
     $60
     $50
     $40
     $30
     $20
     $10
      $-
                    Operating Revenue                          Operating Expenditure



                                                                                              Page 29 of 43

Section 30

GENERAL COMMITTEE MEETING AGENDA                                                              12 APRIL 2021


Council’s performance against key measures of financial sustainability have been calculated as at
31 March 2021. These indicators enable the reader to assess Council’s success in managing its
budget, cash and debt as well as undertaking sustainable asset management. The table below
contains a snapshot of a number of key measures, with full detail included in the report.

 YTD Measures of Financial Sustainability
                                    Target       Current      Actual YTD
                                                 Budget
 Operating Surplus Ratio            0-10%         -3.0%          22.4%           On Track
 Net Financial Liabilities Ratio    < 60%         -8.5%          -43.0%          On Track
 Cash Cover Ratio                  3 months    7.9 months     12.2 months      Above Target
 Asset Sustainability Ratio         > 90%        100.1%          62.3%           On Track


RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee Meeting
dated 12 April 2021 outlining March 2021 year to date financial performance against budget,
including performance against key financial sustainability indicators.


REPORT
Operating Revenue (YTD Benchmark 75.0%)
Council has received 96% ($92.8 million) of its operating revenue budget ($96.9 million).
Commentary on each revenue category is provided below.

 Category              Summary                          Comments
 Rates and Levies      $69.3 million (101%) of the         Waste utility charges $844k above YTD budget
                       annual budget of $68.4               (107% or $13.2 million of $12.4 million budget
                       million has been earned              earned), due to recovery of collection services
                                                            previously impacted by the COVID-19 pandemic
                                                           General rates $115k above YTD budget (100% or
                                                            $52.2 million of $52.1 million budget earned)
 Fees and              $5.8 million (87%) of the $6.6      Development assessment fees $217k above YTD
 Charges               million annual budget has            budget (89.3 % or $1.4 million of $1.6 million
                       been earned                          budget earned) – offset by additional costs
                                                           Building application fees $169k above YTD
                                                            budget (99% or $658k of $667k budget earned)
                                                           Waste Management fees $93k above YTD
                                                            budget (106% or $188k of $177k budget earned)
 Sale of Goods         $8.5 million (117%) of the          Holiday Park sales $1.65 million above YTD
 and Services          $7.3 million budget has been         budget (175% or $2.9 million of $1.6 million
                       received                             budget earned) – Parks reopened earlier than
                                                            forecast following COVID-19 pandemic closures.
                                                            Positive revenue variances that hold through the
                                                            financial year will be offset in part by additional
                                                            variable operating costs including park
                                                            commissions
                                                           Community Facilities (NAC, NLC and The J)
                                                            $966k above YTD budget (133% or $1.93 million
                                                            of $1.45 million budget earned) – Facilities
                                                            reopened earlier than forecast following COVID-
                                                            19 pandemic closures. Positive revenue
                                                            variances that hold through the financial year will


                                                                                              Page 30 of 43

Section 31

GENERAL COMMITTEE MEETING AGENDA                                                                                     12 APRIL 2021


 Category               Summary                                       Comments
                                                                         be offset in part by additional variable operating
                                                                         costs
                                                                       Waste management disposal fees and sale of
                                                                         recoverable materials $552k above YTD budget
                                                                         (88% or $3.5 million of $4.0 million budget
                                                                         earned)
 Interest               $618k (71%) of the $870k                            Interest revenues on cash invested will need
 Received               annual budget has been                               ongoing monitoring given further recent interest
                        earned                                               rate cuts and impacts on term deposit / cash fund
                                                                             rates
 Unitywater             On track                                      Nil
 Dividend and
 Tax
 Other Revenue          $1.8 million (91%) of the $2.0                      Recoupment of Unitywater charges from lessees
                        million budget has been                              $140k above YTD budget - offset by additional
                        earned                                               utility charge expenses
                                                                            Commercial lease revenue $142k above YTD
                                                                             budget (93% or $857k of $919k budget earned)
 Operating              $3.8 million (62%) of the $6.1                      50% ($1.2 million) of the financial assistance
 Grants,                million budget has been                              grant was prepaid in May 2020 and may impact
 Subsidies              received                                             on Council’s 2020/21 final operating position if the
                                                                             prepayment approach is discontinued by the
                                                                             Australian government
                                                                            All operating grants are in line with budget
                                                                             expectations at this stage
 Unitywater             On track                                            Unitywater distributions are fixed each year so
 Distributions                                                               there is little budget variance risk


Figure 2: Operating Revenue Position by Type (Excluding Rates)

  $9.0                                              $8.5

  $8.0
                                                                                 YTD Budget ($m)
  $7.0
                 $5.7                                                            YTD Actual ($m)
  $6.0   $5.0                                $5.3
  $5.0
  $4.0                                                                                   $3.6 $3.8
                                                                                                     $3.0 $3.0
  $3.0
  $2.0
                                      $0.6                 $0.9 $1.1
  $1.0                  $0.6                                                $0.6 $0.7

  $0.0
             Charges




                                                                                Other
                                                            Income




                                                                                            Grants
                                              Goods &




                                                                                                        Unitywater
                                              Services
                                              Sales of




                                                             Rental
                           Interest
             Fees &




                                                                                                         Share of




                                                                                                                     Page 31 of 43

Section 32

GENERAL COMMITTEE MEETING AGENDA                                                           12 APRIL 2021


Operating Expenditure (YTD Benchmark 75.0%)
Actual operating expenditure is currently 72% ($72.0 million) of full year budget ($99.9 million).
Detailed commentary for each expenditure category is provided below.

 Category          Summary                        Comments
 Employee          $24.8 million (71%) of the          Under expenditure for permanent staff salaries
 Costs             annual budget of $34.8               and wages ($2.3 million) partially offset by
                   million has been expended            additional spend on casual staff and external
                                                        labour hire ($969k) as well as overtime and
                                                        allowances ($195k)
                                                       Training expenditure $56k below YTD budget
                                                        (21% or $69k of $330k budget spent)
 Materials and     $31.8 million (71%) of the          Libraries services $102k below YTD budget
 Services          $44.5 million annual budget          (51.6% or $558k of $1.1 million budget spent) –
                   has been expended                    primarily due to timing of library collection
                                                        purchases and programs
                                                       Parks and Landscape $65k below YTD budget
                                                        (71% or $3.3 million of $3.4 million budget spent)
                                                        – timing of maintenance and utilities
                                                       Council buildings and facilities $58k below YTD
                                                        budget (53.9% or $560k of $1.0 million budget
                                                        spent) – timing of utilities as well as scheduled
                                                        maintenance and cleaning services
                                                       Waste Management costs $54k below YTD
                                                        budget (73.6% or $7.2 million of $9.8 million
                                                        budget spent) – collection bin purchases lower
                                                        than forecast (offset by lower revenue recovery)
                                                       Development application costs $53k above YTD
                                                        budget (100% or $210k of $210k budget spent) –
                                                        offset by additional application revenues
                                                       Noosa Aquatic Centre $106k above YTD budget
                                                        (89.5% or $575k of $643k budget spent) –
                                                        variable operating costs from facility reopening
                                                        earlier than budgeted following COVID-19
                                                        pandemic related closures - offset by additional
                                                        revenues
                                                       Schoolies event related costs $80k unbudgeted
                                                       Governance legal fees $260k unbudgeted
                                                       Holiday parks $489k above YTD budget (130%
                                                        or $1.1 million of $861k budget spent) – variable
                                                        operating costs (including commissions) from
                                                        parks reopening earlier than budgeted following
                                                        COVID-19 pandemic related closures - offset by
                                                        additional revenues
 Finance Costs     On track                       Nil
 Depreciation      On track                       Nil
 Other Expenses    On track                       Nil




                                                                                          Page 32 of 43

Section 33

GENERAL COMMITTEE MEETING AGENDA                                                                                                                             12 APRIL 2021


Figure 3: Operating Expenditure Position by Type

$35.0
                                                  $31.1 $31.8
$30.0                                                                                          YTD Budget ($m)
           $25.3 $24.8
$25.0                                                                                          YTD Actual ($m)

$20.0
                                                                                                      $14.2 $14.2
$15.0

$10.0

 $5.0
                                                                    $1.2 $1.1
                                                                                                                                              $0.1 $0.2
 $0.0


                                                                             Finance Costs
                                                      Materials




                                                                                                          Depreciation
               Employees




                                                                                                                                                     Other
Capital Revenue
YTD capital revenue of $9.1 million received comprises cash contributions from developers ($1.4
million) and capital grants ($7.5 million). Note that the timing of capital grant receipts are generally
dependent on the timing of grant conditions and also capital delivery performance, and that the timing
of the receipt of developer contributions (both cash and contributed) is unpredictable.

Figure 4: Capital Revenue by Type

 $8.0                                                                                        $7.5

 $7.0
                                                                                                         YTD Budget ($m)
 $6.0
                                                                                                         YTD Actual ($m)
 $5.0                                                             $4.3
 $4.0
 $3.0
 $2.0             $1.4                     $1.4

 $1.0
                                                                                                                         $0.1                 $0.2
 $0.0
                                                                         Subsidies
                           Contributions




                                                                                                                                Contributed
                                                                          Grants /




                                                                                                                                  Assets
                              Cash




                                                                                                                                                             Page 33 of 43

Section 34

GENERAL COMMITTEE MEETING AGENDA                                                       12 APRIL 2021


Capital Program
Actual capital expenditure (excluding commitments) is $16.9 million (YTD budget $16.3 million).
Detailed discussion of progress in the delivery of the capital works program is provided through a
separate report by the Asset Planning Manager.

Figure 5: Capital Program Delivery Performance

$14.0
                        $12.7
               $11.9
$12.0                                        YTD Budget ($m)
                                             YTD Actual ($m)
$10.0

 $8.0

 $6.0

 $4.0
                                                                     $2.4     $2.4
                                          $1.9     $1.7
 $2.0

 $0.0
               Capital works              Other capital            Loan redemption




Cash Management and Investment Performance
Total cash on hand at the end of March was $80.9 million. Included in this balance are funds held in
trust and for restricted purposes (e.g. unexpended levy and grant funds), cash inflows from the
January rate levy, prepaid grants including the financial assistance grant and other capital works
grants, as well as any other monies committed for funding capital projects which are underway and
will continue during the financial year.

The following pie charts present the mix of cash held at March 2021 by agency (graph on the left)
and by credit risk rating (graph on the right). All funds have been invested in accordance with the
Investment Policy and in consideration of the principles of ethical investment, preservation of capital,
return on investment and counterparty thresholds.

Figure 6: Closing Cash Held by Agency and Credit Rating



                         CBA                                           A1 +
                         4%                                       (Commercial Banks)
                                                                        4%




                                                                             A1 +
                          QTC                                               (QTC)
                          96%                                                96%




                                                                                       Page 34 of 43

Section 35

GENERAL COMMITTEE MEETING AGENDA                                                                                                      12 APRIL 2021


The following chart monitors the 12-month trend on total cash and the agencies invested. Payments
received in February through to March from bi-annual rates generated a significant increase in cash,
which was has been invested in short term QTC deposits in line with Council’s Investment Policy.

Figure 7: 12 Month Trend of Cash Invested by Agency
 100,000,000

  90,000,000

  80,000,000

  70,000,000

  60,000,000

  50,000,000

  40,000,000

  30,000,000

  20,000,000

  10,000,000

           -
               Apr-20    May-20        Jun-20     Jul-20      Aug-20     Sep-20      Oct-20     Nov-20   Dec-20   Jan-21   Feb-21   Mar-21


                Bendigo TD              Westpac TD              NAB TD               Suncorp TD          CBA TD       QTC       CBA Operating




Measures of Financial Sustainability
The following table incorporates a set of financial sustainability indicators to further assist in
managing Council financial performance. There are no current emerging risks regarding financial
performance year to date.

 Category                                                                                                   Comments
 Operating Surplus Ratio                                                                                         Intent: Identifies the extent to
     90%                                                                                                          which revenues cover operational
     80%
           77.3%                                                                                                  expenses, to ensure community
     70%
                                                                                                                  equity is not degraded.
                     59.1%
     60%                                                                                                         Target: 0 – 10%
     50%                      43.2%                                                                              Result: 22.4%
                                                             37.9%
     40%                              30.9%                          30.7%                                       Comment: The ratio will decline
     30%                                                                     22.4%                                from February to June as the
     20%                                      15.7%
                                                                                                                  January rates are expended on
     10%                                              4.6%
                                                                                                                  delivery of Council services.
      0%
    -10%
               Jul    Aug     Sep      Oct    Nov     Dec     Jan    Feb     Mar     Apr   May    Jun


                     Actual                  Budget                  Minimum                  Target




                                                                                                                                     Page 35 of 43

Section 36

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                        12 APRIL 2021


Category                                                                                                                                                                           Comments
Cash Expense Cover                                                                                                                                                                    Intent: Indicates how long
                                     14.0                                                                                                                                              Council can continue paying its
                                                                                                                                                             12.5       12.2           day-to-day expenses from cash
 Months (Cash to Cover Operations)




                                                                                             11.5
                                     12.0                                                               11.1
                                                   10.2
                                                                                                                   10.7
                                                                                                                              10.1
                                                                                                                                                                                       at    bank    without   needing
                                                                                                                                                   9.7
                                     10.0
                                                               9.5
                                                                                   8.7                                                   9.1                                           additional cash flows.
                                                                         8.6
                                                                                                                                                                                      Target: > 3 months
                                      8.0
                                                                                                                                                                                      Result: 12.2 months
                                      6.0
                                                                                                                                                                                      Comment: Whilst current cash
                                      4.0                                                                                                                                              cover remains above target,
                                      2.0
                                                                                                                                                                                       business as usual expenditure
                                                                                                                                                                                       and any other unforeseen
                                          -               -          -         -         -          -          -          -          -         -         -          -          -       financial impacts through to 30
                                                   Apr        May        Jun       Jul       Aug        Sep        Oct        Nov        Dec       Jan       Feb        Mar
                                                                                                                                                                                       June 2021 will degrade Council’s
                                                               Actual                                                               Minimum (>0 months)                                cash holdings.
                                                               Target (3 months)                                                    Maximum (6 months)

Asset Sustainability Ratio                                                                                                                                                            Intent: Measures the extent to
                                     120%                                                                                                                                              which assets are being replaced
                                                                                                                                                               100.1%                  as their condition degrades to
                                     100%                                                                                                                                              ensure service potential is
                                                                                                                                                                         90%           maintained.
                                      80%
                                                                                                                                                                                      Target: 90% of depreciation
                                                                                                                   59% 60% 62%
                                      60%                                                               55%                                                                            budget spent on renewals
                                                                                             45%                                                                                       annually
                                                                                   34%
                                      40%                                29%                                                                                                          Result: In line with budget
                                      20%                      13%                                                                                                                    Comment:        The    ratio will
                                                    1%                                                                                                                                 progressively increase each
                                              0%                                                                                                                                       month as expenditure on asset
                                                    Jul        Aug       Sep       Oct       Nov        Dec        Jan        Feb        Mar       Apr       May        Jun            renewals occurs as part of the
                                                    Actual Renewal Spend (%)                                  Target (%)                   Renewals Budget (%)
                                                                                                                                                                                       capital works program.

Net Financial Liabilities Ratio                                                                                                                                                       Intent: Outlines the level that net
                                                                                                                                                                                       Council debt can be serviced by
                80%
                                                                                                                                                                                       operating revenues. A ratio below
                                                              60%
                60%                                                                                                                                                                    zero implies that liabilities are
                                                                                                                                                                                       less than cash (and other current
                40%                                                                                                                                                                    assets) and there is adequate
                                                                                                                                                                                       borrowing capacity available if
                20%                                                                                                                                                                    needed.
                                                                                                                                                                                      Target: less than 60%
                                     0%
                                                              Target                                    Budget                                 YTD Actual                             Result: -43%
    -20%                                                                                                 -8%                                                                          Comment: Council has low debt
                                                                                                                                                                                       levels and strong cash holdings.
    -40%
                                                                                                                                                                                       The ratio will reduce through to
                                                                                                                                                   -43%
    -60%
                                                                                                                                                                                       June as cash is expended on
                                                                                                                                                                                       capital and operational activities.




                                                                                                                                                                                                        Page 36 of 43

Section 37

GENERAL COMMITTEE MEETING AGENDA                                                                                                                          12 APRIL 2021


 Category                                                                                                                             Comments
 Investment Return                                                                                                                       Intent: Ensure appropriate return
                                                                                                                                          on investment yield for cash at
                                                                                                                                          bank.
                                                                                                                                         Target: 0.25% above current
                                                                                                                                          Bloomberg commonwealth 10
                                                                                                                                          year bond rate yield (0.00%)
                                                                                                                                         Result: 0.69%
                                                                                                                                         Comment: Regardless of the
                                                                                                                                          current levels of low long term
                                                                                                                                          bond and interest rates (due to
                                                                                                                                          current economic conditions),
                                                                                                                                          Council’s investment return still
                                                                                                                                          remains above target.
 Rates in Arrears                                                                                                                        Intent: Ensuring that the amount
                                                                                                                                          of    unpaid      rates   remains
                                           12.0%
   Percentage of Annual Rates in Arrears




                                                                                                                                          sustainable and does not
                                                                                        9.6%                                   9.5%       negatively impact cash flows.
                                           10.0%

                                                   7.5%                                                                                  Target: 5% industry benchmark
                                            8.0%          6.9%                                 7.1%
                                                                 6.5%
                                                                                                      6.0% 5.8% 5.7%                     Result: 9.5%
                                                                        5.8%
                                            6.0%
                                                                               4.5%
                                                                                                                        5.0%             Comment: Arrears are at the
                                                                                                                                          high point in the cycle with
                                            4.0%
                                                                                                                                          January rates due in March.
                                            2.0%                                                                                          Reminder notices are currently
                                                                                                                                          being issued with further debt
                                            0.0%                                                                                          recovery initiatives underway.
                                                   Apr    May    Jun    Jul     Aug     Sep    Oct    Nov   Dec   Jan   Feb    Mar

                                                                               Actual           Target




Previous Council Consideration
Nil.

Finance
As above.

Risks & Opportunities
Council’s risk register includes a number of risks that could impact on ongoing financial sustainability.
Effective budget management and reporting is an important risk mitigation tool.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.




                                                                                                                                                          Page 37 of 43

Section 38

GENERAL COMMITTEE MEETING AGENDA                                                           12 APRIL 2021


Departments/Sections Consulted:

 X   Chief Executive Officer   X   Community Services                      X   Corporate Services
     Executive Support             Director                                X   Director
                                   Community Development                   X   Financial Services
                                   Community Facilities                        Fleet
                                   Libraries & Galleries                       ICT
                                   Local Laws                                  Procurement
                                   Waste & Environmental Health                Property
                                                                               Revenue Services

 X   Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
     Director                      Director                                    Director
     Community Engagement          Building & Plumbing Services                Asset Management
     Customer Service              Development Assessment                      Buildings and Facilities
     Governance                    Economic Development                        Civil Operations
     People and Culture            Environmental Services                      Disaster Management
                                   Strategic Land Use Planning                 Infrastructure Planning,
                                                                               Design and Delivery




                                                                                          Page 38 of 43

Section 39

GENERAL COMMITTEE MEETING AGENDA   12 APRIL 2021




                                   Page 39 of 43

GENERAL COMMITTEE MEETING AGENDA                                                                         12 APRIL 2021

 Noosa Council                                                                                                   ATTACHMENT 1
Statement of Income and Expenditure
For the Year Ended 30 June 2021
As at 31 March 2021
                                                           Current           Current
                                                            Budget            Budget           Actual        Variance         Annual
                                                               2021             YTD               YTD              YTD        Budget
                                                             ($'000)          ($'000)          ($'000)          ($'000)          %
Profit and Loss Statement

Revenue
    Recurrent Revenue
    Rates, levies and charges                                 68,388           68,371           69,313              943        101%
    Fees and charges                                           6,640            5,029            5,747              718         87%
    Interest received                                           870               592              618               Z5         71%
    Sale of Goods and major services                           7,281            3.327            8,506            3)179        117%
    Sale of contract and recoverable works                        23                -                o                5         24%
    Rental & lease income                                      1,197              918            1,079              161         90%
    Other income                                                796               639              726               87         91%
    Grants, subsidies, contributions and donations             6,115            3,602            3,788              186         62%
    Unitywater Distributions                                   5,650            3,025            3,025                 :        54%
                                                              96,958           87,504           92,807            5,304         96%
Expenses
    Recurrent Expenses
    Employee benefits                                         34,752           25,292           24,760              532         71%
    Materials and services                                    44,473           31,142           31,779             (637)        71%
    Finance costs                                              1,538            1,162            1,089               72         71%
    Depreciation                                              18,963           14,222           14,236              (14)        75%
    Other expenses                                               189              144              195              (51)       103%
                                                              99,915           71,961           72,060              (98)        72%
Operating Result                                              (2,957)          15,542           20,747            5,205

Summary of Capital Expenditure and Funding

Capital Funding
    Capital cash contributions and infrastructure charges      1,521            1,411            1,441               30         95%
    Contributed assets                                         2,000              132              205               72         10%
    Capital grants and subsidies                              11,642            4,297            7,466            3,169         64%
    Cash / revenue                                            18,810           10,558            9,316           (1,242)        50%
    New loan borrowings                                        3,420                -                -                 -        0%
    Other capital revenue                                          -                -               12               12         0%
Total Capital Funding                                         37,392           16,398           18,441            2,042

Capital Expenditure
    Contributed assets                                         2,000              132              205               72         10%
    Capital works - constructed assets                        28,912           11,925           12,741              816         44%
    Capital works - other capital                              4,066            1,928            1,724             (204)        42%
    Loan redemption                                            2,414            2,414            2,414                 -       100%
    Other capital expenses                                         -                -            1,357            1,357         0%
Total Capital Expenditure                                     37,392           16,398           18,441            2,042

                                                                                                                Page 39 of 43

Section 40

GENERAL COMMITTEE MEETING AGENDA   12 APRIL 2021




                                   Page 40 of 43

GENERAL COMMITTEE MEETING AGENDA                                                                         12 APRIL 2021

Noosa Council                                                                                                ATTACHMENT 2
Statement of Financial Position
For the Year Ended 30 June 2021
As at 31 March 2021
                                                                    2021 Year End
                                                                       Forecast               2021 YTD                  2020
                                                                        ($'000)                 ($'000)                ($'000)
Current Assets
    Cash and cash equivalents                                                  52,550                  80,888                  57,023
    Trade and other receivables                                                  9,117                  8,596                   5,440
    Inventories                                                                   181                     181                     181
    Contract Assets                                                                  -                     27                      27
    Other current assets                                                         2,912                  2,955                   4,732
                                                                               64,760                  92,647                  67,403
    Non Current Assets held for sale                                                 @                      -                       >
Total Current Assets                                                           64,760                  92,647                  67,403
Non Current Assets
    Trade and other receivables                                                49,593                  49,593                  49,593
    Investments                                                                88,040                  88,040                  88,040
    Investment property                                                          3,000                  3,000                   3,000
    Property, plant and equipment                                             961,982                 927,832                 929,355
    Right of Use Assets                                                              =                    161                     161
    Intangible assets                                                            8,400                  8,025                   7,635
Total Non Current Assets                                                     1,111,014              1,076,650               1,077,783
Total Assets                                                                 1,175,774              1,169,297               1,145,186

Current Liabilities
    Trade and other payables                                                     6,512                 11,693                  10,642
    Contract Liabilities                                                             -                  1,568                   1,568
    Borrowings                                                                   3,152                     87                   3,023
    Lease Liablities                                                                 -                     54                      54
   Provisions                                                                    7,582                  2,640                   4,630
   Other                                                                         4,780                    939                   1,561
Total Current Liabilities                                                      22,026                  16,981                  21,478
Non Current Liabilities
    Borrowings                                                                  19,114                 18,493                  18,493
    Lease Liabilities                                                             110                     110                     110
    Provisions                                                                  15,307                 15,399                  15,307
Total Non Current Liabilities                                                  34,531                  34,002                  33,910
Total Liabilities                                                              56,557                  50,983                  55,388
Net Community Assets                                                        1,119,217               1,118,313              1,089,798

Community Equity
    Asset Revaluation Surplus                                                 103,738                  86,525                  86,525
    Retained Surplus / (Defeciency)                                                  :                      :                       =
    Shire Capital                                                            1,015,479              1,003,273                 992,284
    Current Year Net Earnings                                                        =                 28,515                  10,989
Total Community Equity                                                      1,119,217               1,118,313              1,089,798

                                                                                                              Page 40 of 43

Section 41

GENERAL COMMITTEE MEETING AGENDA   12 APRIL 2021




                                   Page 41 of 43

GENERAL COMMITTEE MEETING AGENDA                                                                     12 APRIL 2021

 Noosa Council                                                                                          ATTACHMENT 3
Statement of Cash Flows
For the Year Ended 30 June 2021
As at 31 March 2021
                                                                               Current              Actual               Actual
                                                                                Budget                 YTD             Full Year
                                                                                  2021                2021                 2020
                                                                                ($'000)             ($'000)              ($000)

Cash flows from operating activities

     Cash Flows from Operating Activities

      Receipts from Customers                                                   82,924              85,820               91,168
      Payments to Suppliers and Employees                                       (81,041)            (61,371)            (82,671)
                                                                                  1,883             24,448                8,498
      Receipts:
      Investment and Interest Revenue Received                                    3,470               1,728               3,937
      Rental Income                                                               1,194               1,079               1,003
      Non Capital Grants and Contributions                                        6,087               3,788               5,315
      Income Tax Equivalent Received                                              1,200               1,050               1,857
      Income from Equity Investments                                              1,850                865                1,396
      Payments:
      Borrowing Costs                                                                 -                   -                   -
      Interest Expense                                                           (1,092)               (109)               (143)

      Net Cash Inflow/(Outflow) from Operating Activities                       14,592              32,849               21,861

Cash Flows from Investing Activities

      Receipts:
      Proceeds of Sale of Property, Plant and Equipment                               -                217                  284
     Grants, Subsidies, Contributions and Donations                             13,162                8,908               8,640
      Payments:
      Payments of Property, Plant and Equipment                                 (31,529)            (13,501)            (24,208)
      Payments for Intangible Assets                                             (1,449)               (970)             (1,710)
      Net Movement in Loans and Advances                                              -                125                  125

      Net Cash Inflow/(Outflow) from Investing Activities                       (19,816)             (5,222)            (16,869)

Cash Flows from Financing Activities

      Receipts:
      Proceeds from Borrowings                                                    3,420                   -                   -
      Payments:
      Repayment of Borrowings                                                    (2,670)             (3,762)             (3,950)
      Net Cash Inflow/(Outflow) from Financing Activities                          750               (3,762)             (3,950)
      Net Increase/(Decrease) in Cash and Cash Equivalents held                  (4,474)            23,864                1,042

     Cash and Cash Equivalents at the beginning of the reporting period         57,024              57,023               55,981

     Cash and Cash Equivalents at the end of the reporting period               52,550              80,887               57,023

                                                                                                          Page 41 of 43

Section 42

GENERAL COMMITTEE MEETING AGENDA   12 APRIL 2021




                                   Page 42 of 43

GENERAL COMMITTEE MEETING AGENDA                                                                     12 APRIL 2021

 Noosa Council                                                                                               ATTACHMENT 4
Summary of Key Materials and Services Expenditure
For the Year Ended 30 June 2021
As at 31 March 2021
                                                          Current         Current
                                                          Budget           Budget          Actual        Variance        Annual
                                                             2021             YTD             YTD              YTD        Budget
                                                           ($'000)         ($'000)          ($'000)          ($'000)        %

    Materials and services
    Advertising and Marketing                                 202              141              119              22        59%
    Administration Supplies and Consumables                   683              477             420               58        61%
    Audit Expenditure                                         160               48               48              (0)       30%
    Communications and IT                                     678              499             486               13        12%
    Commission Paid                                           605              465             808             (343)       134%
    Consultancy Services                                      928              538             733             (194)       79%
    Contract Services                                       21,968          14,675           15,029            (353)       68%
    Contributions, Donations, Sponsorship and Prizes         3,387           3,336            3,314              22        98%
   Electricity                                               1,639           1,207            1,130              77        69%
    Internal Fleet Costs and External Plant Hire             1,615           1,086            1,343            (257)       83%
    Grants Paid to Community Organisations                   1,552             956             964               (8)       62%
    Insurance                                                 625              611             623              (11)       100%
    Legal Expenses                                           1,105             780            1,126            (345)       102%
    Operating Leases and Rentals                              256              184             203              (19)       79%
    Software and Maintenance                                 2,003           1,491            1,411              80        70%
    Subscriptions and Registrations                           263              210             251              (41)       96%
    Waste Levy Payments                                      1,185             880             985             (105)       83%
    Water and Sewerage Charges                               1,091             803             673              130        62%
    All Other Materials and Services                         4,528           2,t52            2,114             638        47%
                                                           44,473           31,142           31,779            (637)       71%

                                                                                                            Page 42 of 43

Section 43

GENERAL COMMITTEE MEETING AGENDA   12 APRIL 2021



7   CLOSED SESSION

    Nil.




                                   Page 43 of 43

GENERAL COMMITTEE MEETING AGENDA                                 12 APRIL 2021

7    CLOSED SESSION

     Nil.

                                                                Page 43 of 43

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.