GENERAL COMMITTEE MEETING AGENDA 12 APRIL 2021
Page 18 of 43
Project heie Proposed Bes Change: Details
s Budget Changes Budget | Category seo)
rs ee SA a SEE oo SE
Sunshine Beach Skate Park New Shade Structure woo] CT SC OOCC~—CSCSCSCSCSYS
[ake Cooroibah Foreshore - Catb2019 oof | __aooof i) SY
Replace Shade Shelters at Noosa Banks - Cat D2019 50.000] 50000)
Total Parks & Playgrounds 1,224,554 480,446 1,705,000
Pathways & Boardwalks : : |
Noosa Heads Noosa Parade Road Corridor Upgrade 100,000 100,000) Brought forward |Planning and design works brought forward from 2021/22 following
from 2021/22 —|successful grant application
Cooroy Maple Street Raised Pedestrian Crossing - LGGSP 347,000[ 347,000)
Tewantin, Hiton Terrace CNLGGP & Ivory Palms ES A RE <
Wallace Park Pathway 586 Waa Temp «id SSC] OOCOCOCOCOCC~C~*Y
Shire Pathway Renewal Program Annual - W4Q 332,000} 892,000]
Noosavile Sea Eagle Diive & Shire Drive Pathway Upgrades sete] id IT] COOOCOCOCOCSCSCSCSCSCSCSC“CNC*”
Noosa Heads Main Beach Boardwalk LED Lighting Renewal Too0f —SC~dCC‘OOOOCSOOCOCOCOCOCOCCSY
Peregian Beach Boardwalk - U&R 230,000[ 20,0007
Noosa Heads Sunshine Beach Road Pathway Lighting USR Teo.00o[ <i S000 CS
Cooroora Trail Loop and Trail Hub |; & 240,000 240,000]Grant /Levy — [Planning and design works included in 2021/22 program following
Funded Work __|successful grant application
Total Pathways & Boardwalks 1,888,002 340,000 2,228,002
Public Amenities _ _ ie i
Public amenities renewal and upgrade works - UR i a
Total Public Amenities 220,000 0 220,000
Public Transport Infrastructure
Shire Bus Shelter Disabled Compliant Program Annual - PTIAP 250,000f 250,000]
Total Public Transport Infrastructure 250,000 0 250,000
SealedRoads Network
Shire Reseal & Rehabilitation Renewal Program Annual 3,091,726) 997,811 4,089,537 |Grant / Levy Additional reseal works fully funded under LRCI grant (half to
Funded Work _Joccur this financial year
Damaged Guardral Renewals (Various) Brel id rT OOCOCOCOOCCC‘(‘#*‘’
Shire Sealed Road Network Rehabilitation and Reconstruction 790,000) 70000; fe
Tewantin Bypass Stage 1 600,000} | 800,000
Total Sealed Roads Network 4,507,494 997,811 §,505,305
‘Sports Ground and Facilities Me !
Tewantin Netball Courts Upgrade - U&R 310,00of 80000
Total Sports Ground and Facilities 310,000 0 310,000
Stormwater Drainage _ ; | :
Gympie Terrace Stormwater Dol _-i| ool] TTTTTTTTCTTCTCCTC—CS™Y
Shire Bioretention Basin Renewals Program Annual Teo) ——<d[ to] | TTTTTTCCCC~™Y
Noosaville, Project Ave Stormwater Drainage Easement Upgrade 237 ,324| -152,324 85,000 Revised schedule with procurement underway and construct to
2021/22 start June 2021 into the 2021/22 financial year
Sunrise Beach Sobraon Street Slope Stabiisation - 4G &LRCI Teel —i| teamey CE CSC~SCS
Marcus Beach DLW -Emergent Stormwater Culvert Works | 266,210 266,210 Emergent works to address abutment B on Marcus Beach
Works stormwater culverts
Total Stormwater Drainage 1,264,860 113,886 1,378,746
‘Transport and Infrastructure Management {|
Whole of Shire Forward Planning & Design Program 500,000] 500,000)
Tewantin, Hitton Tce & Emest St intersection Upgrade Tasso] SiC] PTC
Sunshine Beach Pacific Avenue Pathway, Pedestrian & Dranage moe] Sid SCO OOOCOCOCOCOCSCSCSCSSY
Transport Strategy, Walking & Cycling Strategy &CNLG Grant 2s0as6f 06]
Total Transport and Infrastructure Management 2,210,701 0 2,210,701
Waste Management |
Noosa Heads The
5 1 1 1 54 4 328 2444 82 19 83 Woods Bin Storage Enclosure samo] COCSCSCSCSCSC*dS
Masterplan Landfill SW Controls & Design 115.466) 115,466f
illegal Dumping Hotspot 59.433} 9,43]
Noosaville Eumundi Road Landfill Outbound Weighbridge 560,000 -480,000 80,000 | Delay into Works delayed due to revision of tender and scope. Scheduled for
2021/22 construction in 2021/22
Noosaville Eumundi Road Landfill Liner, Cell capping design 2,110,000 -1,910,000 200,000 | Delay into Works delayed due to revision of scope. Scheduled for
2021/22 construction in 2021/22
Noosaville Eumundi Road Landfill Expansion of Resource Recovery Area 750,000 -700,000 50,000 Works delayed due to revision of scope. Scheduled for
2021/22 construction in 2021/22
Total Waste Management 3,653,356 -3,090,000 $63,356
Shit mer Tel 6,480,000 0 6,480,000
Asset Management AL !
Shire Bridge Annual Level 3 Inspections Annual S5o00f 55000
Zero Emissions Noosa Project Implementation 521655] 524655]
Shire CCTV Dranage Condition Assessment Program Annual 7000 _———+4dt nooo] Sid SCCCCCSCSCSCOCCCC~C~S
Shire Road Infrastructure Asset Data Mat & Condition Annual 340,000f 840,000
Asset Management Systems Implementation 200,000] 200,000)
Noosa Junction Streetscape oof + 000d SSCS
Total Asset Management 1,382,655 0 1,382,655
Fleet - Plant Replacement |
Page 18 of 43See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.