GENERAL COMMITTEE MEETING AGENDA   12 APRIL 2021




                                   Page 18 of 43

Project                                                                  heie          Proposed         Bes Change:            Details
      s                                                                     Budget          Changes       Budget | Category        seo)
  rs                                                                 ee                       SA    a      SEE oo    SE
    Sunshine Beach Skate Park New Shade Structure                            woo] CT SC OOCC~—CSCSCSCSCSYS
    [ake Cooroibah Foreshore - Catb2019                                       oof |                         __aooof            i)                                                          SY
    Replace Shade Shelters at Noosa Banks - Cat D2019                         50.000]                       50000)
   Total Parks & Playgrounds                                               1,224,554         480,446      1,705,000
   Pathways & Boardwalks                                                            :                :            |
    Noosa Heads Noosa Parade Road Corridor Upgrade                                            100,000      100,000) Brought forward |Planning and design works brought forward from 2021/22 following
                                                                                                                   from 2021/22   —|successful grant application
    Cooroy Maple Street Raised Pedestrian Crossing - LGGSP                   347,000[                      347,000)
    Tewantin, Hiton Terrace CNLGGP & Ivory Palms                             ES A                   RE <
    Wallace Park Pathway 586 Waa                                             Temp «id                      SSC] OOCOCOCOCOCC~C~*Y
    Shire Pathway Renewal Program Annual - W4Q                               332,000}                     892,000]
    Noosavile Sea Eagle Diive & Shire Drive Pathway Upgrades                 sete] id                      IT] COOOCOCOCOCSCSCSCSCSCSCSC“CNC*”
    Noosa Heads Main Beach Boardwalk LED Lighting Renewal                    Too0f —SC~dCC‘OOOOCSOOCOCOCOCOCOCCSY
    Peregian Beach Boardwalk - U&R                                           230,000[                      20,0007
    Noosa Heads Sunshine Beach Road Pathway Lighting USR                     Teo.00o[              <i      S000                                                                           CS
    Cooroora Trail Loop and Trail Hub                                 |;       &             240,000       240,000]Grant /Levy — [Planning and design works included in 2021/22 program following
                                                                                                                   Funded Work    __|successful grant application
   Total Pathways & Boardwalks                                             1,888,002         340,000     2,228,002
   Public Amenities                                                                 _               _             ie                                                                        i
    Public amenities renewal and upgrade works - UR                          i a
   Total Public Amenities                                                   220,000                0       220,000
   Public Transport Infrastructure
    Shire Bus Shelter Disabled Compliant Program Annual - PTIAP              250,000f                      250,000]
   Total Public Transport Infrastructure                                    250,000                0       250,000
   SealedRoads Network
    Shire Reseal & Rehabilitation Renewal Program Annual                   3,091,726)        997,811     4,089,537 |Grant / Levy  Additional reseal works fully funded under LRCI grant (half to
                                                                                                                   Funded Work    _Joccur this financial year
    Damaged Guardral Renewals (Various)                                       Brel                 id       rT OOCOCOCOOCCC‘(‘#*‘’
    Shire Sealed Road Network Rehabilitation and Reconstruction              790,000)                      70000; fe
    Tewantin Bypass Stage 1                                                  600,000}               |      800,000
   Total Sealed Roads Network                                              4,507,494         997,811     §,505,305
   ‘Sports Ground and Facilities                                                                                  Me                                                                        !
    Tewantin Netball Courts Upgrade - U&R                                    310,00of                      80000
   Total Sports Ground and Facilities                                       310,000                0       310,000
   Stormwater Drainage                                               _                              ;             |               :
    Gympie Terrace Stormwater                                                 Dol _-i|                      ool]                                         TTTTTTTTCTTCTCCTC—CS™Y
    Shire Bioretention Basin Renewals Program Annual                          Teo) ——<d[                    to]      |                                   TTTTTTCCCC~™Y
    Noosaville, Project Ave Stormwater Drainage Easement Upgrade             237 ,324|       -152,324       85,000                Revised schedule with procurement underway and construct to
                                                                                                                   2021/22        start June 2021 into the 2021/22 financial year
    Sunrise Beach Sobraon Street Slope Stabiisation - 4G &LRCI               Teel                 —i|      teamey            CE                                                    CSC~SCS
   Marcus Beach DLW -Emergent Stormwater Culvert Works              |                        266,210       266,210                Emergent works to address abutment B on Marcus Beach
                                                                                                                   Works          stormwater culverts
   Total Stormwater Drainage                                               1,264,860         113,886      1,378,746
   ‘Transport and  Infrastructure Management                                                                      {|
    Whole of Shire Forward Planning & Design Program                         500,000]                      500,000)
    Tewantin, Hitton Tce & Emest St intersection Upgrade                   Tasso]                         SiC] PTC
    Sunshine Beach Pacific Avenue Pathway, Pedestrian & Dranage               moe]                 Sid      SCO OOOCOCOCOCOCSCSCSCSSY
    Transport Strategy, Walking & Cycling Strategy &CNLG Grant               2s0as6f                       06]
   Total Transport and Infrastructure Management                          2,210,701                0     2,210,701
   Waste Management                                                                                               |
    Noosa Heads The
5	1	1	1	54	4	328	2444	82	19	83	Woods Bin Storage Enclosure samo]                                                                                        COCSCSCSCSCSC*dS
    Masterplan Landfill SW Controls & Design                                 115.466)                     115,466f
    illegal Dumping Hotspot                                                   59.433}                        9,43]
    Noosaville Eumundi Road Landfill Outbound Weighbridge                    560,000         -480,000       80,000 | Delay into   Works delayed due to revision of tender and scope. Scheduled for
                                                                                                                   2021/22        construction in 2021/22
    Noosaville Eumundi Road Landfill Liner, Cell capping design            2,110,000       -1,910,000      200,000 | Delay into   Works delayed due to revision of scope. Scheduled for
                                                                                                                   2021/22        construction in 2021/22
    Noosaville Eumundi Road Landfill Expansion of Resource Recovery Area     750,000         -700,000       50,000                Works delayed due to revision of scope. Scheduled for
                                                                                                                   2021/22        construction in 2021/22
   Total Waste Management                                                 3,653,356        -3,090,000      $63,356

Shit mer Tel                                                              6,480,000                 0    6,480,000
   Asset Management                                                                                               AL                                                                        !
    Shire Bridge Annual Level 3 Inspections Annual                            S5o00f                       55000
    Zero Emissions Noosa Project Implementation                              521655]                       524655]
    Shire CCTV Dranage Condition Assessment Program Annual                   7000     _———+4dt             nooo]             Sid SCCCCCSCSCSCOCCCC~C~S
    Shire Road Infrastructure Asset Data Mat & Condition Annual              340,000f                      840,000
    Asset Management Systems Implementation                                  200,000]                      200,000)
    Noosa Junction Streetscape                                                oof                +          000d SSCS
   Total Asset Management                                                  1,382,655               0      1,382,655
   Fleet - Plant Replacement                                                                                      |
                                                                                                                                                           Page 18 of 43
Log in to download the original file

2021-04-12 General Committee Meeting Agenda(PDF, 8MB).pdf · 8.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.