2020/21 Capital Budget Review 3 - Capital Program ATTACHMENT 3
Renewal Projects _ 2 ;
Program ete a lice Grants External Funds Loans LevyReserves General Rates Total
Capital Works
Bridges Cooran Tablelands Road B Bridge Renewal 250,000. | 0 250,000
Bridges Eenie Creek Road Pedestrian Bridge Renewal 100,000 | 100,000
Bridges Kin Kin Wahpunga Lane Bridge Renewal 463,661 | -341,661 122,000
Bridges ‘Sunrise Beach Orealla Bridge Renewal 412,380. | 2,337,953 2,750,333
Bridges Tewantin Doonella Bridge Renewal 50,000 50,000
Bridges Cooroy Belli Creek Road Bridge Replacement | | 35,000 35,000
Bridges Garth Prowd Bridge Replacement | | 50,000 50,000
Bridges Lawnville Road Bridge, Black Mountain 35,000 35,000
Bridges Monks bridge abutment relieving slab repairs | | | 90,000 90,000
Bridges Directional Signage _ Hilton Terrace | | | | 20,000 20,000
Coastal Canals and Waterways Noosa Heads Dog Beach SEMP 110,000 110,000
Coastal Canals and Waterways Noosa Waters Revetment Vall | | 40,000 70,000 110,000
Community Facilities Community Facilities - Other Minor Works | | 57,500 57,500
Community Facilities Cooroy Lower Mill Site Shed - Remove and Replace Amenities 50,000 | 0 50,000
Community Facilities Lifeguard Tower Renewal works 57,000, | | | | 57,000
Community Facilities NAC - Renewal Program 13,435 13,435
Community Facilities NAC - Replacement of Light Pole Fittings 59,500 59,500
Community Facilities Pomona Memorial School of Arts Hall - Amenities Upgrade 264,000 45,000 0 309,000
Community Facilities Shire Community Halls and Facilities Renewals 270,000 om) 270,000
Community Facilities Shire Electrical Distribution Board Renewals 60,000 60,000 120,000
Community Facilities Tewantin - Building Renewal Works Tewantin Sports Complex 150,000 i i [ 0 150,000
Community Facilities The J Community Centre seating refurbishment 100,000 | 20,000 120,000
Community Facilities Tinbeerwah Hall Cladding and Roof refurbishment 150,000 150,000
Community Facilities NAC switchboard replacement | 135,000 135,000
Gravel Road Network Shire Gravel Resheeting - Annual Program Oo | | | 410,000. 410,000
Libraries & Galleries Cooroy Library Renewal of CCTV Cameras 25,000 25,000
Libraries & Galleries Whole of Shire Mobile Library Service Solution | | 350,000 350,000
Parks & Playgrounds Noosaville Pandorea Park Playground Renewal 0 | 55,000 55,000
Parks & Playgrounds Renewal of Noosa waters - Seagull Playground & Lake Macdonald Playground 170,000. 20,000 190,000
Pathways & Boardwalks Noosa Heads Main Beach Boardwalk LED Lighting Renewal | | | | 120,000. 120,000
Pathways & Boardwalks ‘Noosaville Wallace Park Pathways Renewal Stage 3 &4 119,000 0 119,000
Pathways & Boardwalks Shire Pathway Renewal Program 332,000 0 332,000
Public Amenities New Amenities - United Synergies Community Building 60,000. 30,000, 90,000
Public Amenities Public amenities renewal and upgrade works 220,000 220,000
Public Transport Infrastructure ‘Shire Bus Shelter Disabled Compliant Program: Year 7 170,115. 79,885. 250,000
Sealed Roads Network Shire Reseal Program 1,519,537. | | l 2,570,000 4,089,537
Sealed Roads Network Shire Sealed Road Network Rehabilitation and Reconstruction Priority oO 790,000. 0 790,000
Stormwater Drainage Noosaville Gympie Terrace Stormwater Renewals | 40,000 40,000
Stormwater Drainage Shire Bioretention Basin Renewals Program | | 72,190 72,190
Stormwater Drainage Sunrise Beach Sobraon Street Slope Stabilisation 915,346 | | 0 915,346
Stormwater Drainage Marcus Beach DLW -Emergent Stormwater Culvert Works | | 266,210 266,210
Transport and Infrastructure Management Shire Forward Planning & Design Program Construction Ready Designs 79,375 | 420,625 500,000
Transport and Infrastructure Management Sunshine Beach Pacific Avenue Pathway, Pedestrian & Drainage | | 24,608 24,608
Transport and Infrastructure Management Tewantin Hilton Terrace & Ernest St Intersection Upgrade Construction { 1,435,597 1,435,597
Capital Works Total 912,414 865,000 40,000 8,690,842 15,508,256
Asset Management Noosa Junction Streetscape | | 46,000 46,000
Asset Management Shire Bridge Annual Level 3 Inspections | | | 55,000 55,000
Asset Management Shire CCTV Drainage Program | | 220,000 220,000
Asset Management Shire Road Infrastructure Asset Data Management & Condition Program Oo | 340,000 340,000
Asset Management Bushfire Disaster Recovery Cat D - capital works component | | | 135,000
Fleet - Plant Replacement Council Fleet and Plant Replacement Program 1,234,345 1,234,345
Other Capital Total | _ 0 = ’ 46,000 1,849,345 2,030,345
Page 20 of 43See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.