Council archive · source document
Approved Amended Plans OPW24/0043
Plans and drawings: the text below has words only, no drawings.
Original PDF page 3, section 2. The text section number identifies this passage in the reader.
CONTENT.
dTU
O
/
O
dOF
/
O
(D)
/
O
(RW)
/
O
/
O
/
/
O
/
dWM
dE
/
O
(D)
/
O
O O / /
O
/
O
/
(D)
O
/
/
O / /
O
109.0
/
O
O O / /
O
/
O
1.5m MAX HEIGHT 14. ALL NEW WORKS TO MATCH NEATLY INTO EXISTING.
/
/
O / / /
(D)
/
O
/
dS
/ /
/
/ / /
/ /
O
/ /
/
/ / /
(D)
.0
/
dE
15. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH ALL APPROVED MANAGEMENT PLANS.
/
109
/
O
/
/
/ /
dTU
/
dOF
/ /
1.5m MAX HEIGHT
/ /
/
O
/
dWM
/
/
O
16. ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL BATTERS OR RETAINING WALLS (TEMPORARY OR
/
/
dS
O
108.5
(D)
PERMANENT) AS PER RELEVANT AUSTRALIAN STANDARDS AND LEGISLATION.
dE
/
/
/ O
/
/O
/
17. DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON UNPAVED ROADS, ACCESS TRACKS AND
dTU
H
dOF
O
RETAINING WALL ALONG PROPERTY
/
/
109.0
STOCKPILES AT A SUFFICIENT LEVEL TO SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS ARE TO
(D)
O
dWM
/
BOUNDARY PART OF BUILIDNG
/
A
dE
dS
COVER OR ENCLOSE STOCKPILES WHERE REASONABLY PRACTICAL TO RESTRICT DUST MOVEMENT.
/ O
/
STRUCTURE (REFER TO STRUCTURAL
021
/
/
O
DRAWINGS FOR DETAILS)
/
/
O
18. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS DRAWING, THE CONTRACTOR IS TO
(D)
/
/
O
dTU
dOF
dE
NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
/
/
108
/ O
/
.0
dS
dWM
/ O
/
19. ALL BATTERS TO BE KEYED/STEPPED INTO EXISTING MATERIAL AS DIRECTED BY GEOTECHNICAL ENGINEER.
O
10
/
(D)
/
CONTRACTOR TO ALLOW FOR ALL KEYING/STEPPING AS REQUIRED.
8.0
/ O
/
dE
/
/
O
dTU
dOF
/
/
O
20. ALL TEMPORARY AND FINAL BATTER SLOPES ARE TO BE INSPECTED AND APPROVED BY GEOTECHNICAL
dS
/
/
(D)
O
dWM
ENGINEER. CERTIFICATION OF LONG TERM STABILITY TO BE PROVIDED BY GEOTECHNICAL ENGINEER PRIOR TO
/
/
O
dE
/
PRACTICAL COMPLETION.
/
/ O
/
O
(RW)
/
/
(D)
EET
21. CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT ALL CONSTRUCTED CUT/FILL BATTERS
dTU
/
dOF
O
/
dS
/
AND RETAINING STRUCTURES ON THE SITE HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM FACTOR OF
/
10
dE
RETAINING WALL PART OF BUILIDNG O
8
/
/
ELM STR
dWM
SAFETY GREATER THAN OR EQUAL TO 1.5 AGAINST GEOTECHNICAL FAILURES.
O
.0
STRUCTURE (REFER TO
/
/
A
(D)
/ O
/
STRUCTURAL DRAWINGS FOR
O
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Amended Plans OPW24/0043Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.