Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

SUPERSEDED Compiled Approved Plans for OPW20-0145 05

of 228

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (73.7 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 135, section 1. The text section number identifies this passage in the reader.

                 4. Fauna Management
                     4.1. Occupational Health and Safety

                     Before commencement of work on the site all inductions including client, inductions must be
                     completed; all onsite requirements outlined in the inductions must always be adhered to. Before
                     handling any venomous snakes, you must have completed a Venomous snake relocation coarse
                     and an acceptable level of attainment must have been achieved.

                          4.1.1. Personal Protective Equipment (PPE)

                          The PPE required on site must always be worn. As a minimum long sleeve high visibility work
                          shirt, long work pants, hard hat with sun brim, lace up work boots, safety glasses and suitable
                          gloves for your planned task are to be worn.

                          4.1.2. First Aid

                          It is a requirement of your position as a Fauna Handler that you have a current first aid
                          certificate and first aid kits have been placed in every vehicle for your use. If working in the
                          field and are situated away from your site vehicle you must carry a snake bit kit.

                          4.1.3. Working around plant

                          Placement
                          When working besides plant (Bulldozers and Excavators) a clear line of sight to the machine
                          operator is required. For the operator to maintain line of sight it is important to be on the
                          correct side of the machine, for excavators this is the left side (operator cabin side). For
                          bulldozers, the correct place is on either side, not in front or behind the machine and always
                          maintain positive communication with the operators. When vegetation is being felled it is
                          important to stand well clear (but still within sight of the operator). If further inspection of a
                          tree is required, the operator must be contacted and place the machine in the “safe” position
                          (Stationary with the bucket or blade on the ground) before you can approach the tree.

                          Clearing zone
                          Clearing zone is defined as that area within two tree lengths (50 Meters) from the operating
                          machine. This zone is a hazardous area, care must always be taken while working within this
                          zone. The clearing zone is where most of the spotter/catcher’s work occurs.

                          Communication
                          Communication with the plant operator is to be made via hand help UHF radios. Radios must
                          always be charged and carried on your person. Clear communication with the operator is
                          essential to ensure safety and the required co-operation is achieved. The operator must be
                          informed upon the sighting of any wildlife and of your intentions to catch the animal; you
                          require positive communication before approaching the machinery.




                                                                                                                18 | P a g e

Document Set ID: 21753628
                  21426255
Version: 1, Version Date: 12/01/2022
                          24/03/2021
Log in to download the original file

SUPERSEDED Compiled Approved Plans for OPW20-0145 05.pdf · 73.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.