SUPERSEDED Compiled Approved Plans for OPW20-0145 05

of 228

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (73.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 94, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                         Noosa Civic | Page 21




                     The small area of National Park to the north of the subject site (i.e. 1ha) would benefit from a periodic (every
                     7-10 years) cooperative hazard reduction burn. This is not essential but National Parks have a responsibility
                     to abate the hazard and have indicated willingness to list the area for treatment. It is essential that the area
                     under the power line be managed as manicured grassland as is the current practice. Perimeter roading along
                     the eastern and northern edges of the development will confirm adequate separation.

                     6.3. Water
                     Providing a sufficient water supply provides firefighters and residents with the appropriate levels of water to
                     undertake building defense. There are two options in which a house site can be supplied with a sufficient
                     water supply; from either reticulated water accessible via a hydrant, or a dedicated static water supply.

                     The entire estate will have reticulated water with appropriate fire hydrants. It would be prudent to have a fire
                     hydrant with standpipe for compatible filling with National Park and Local Rural Fire appliances. The siting
                     of this water stand would be best decided following discussion with the agencies involved.

                     AREA 4
                     Lots 12 to 15 will each have a fire hydrant along the frontage of each Lot. Two fire hydrant standpipes will
                     be established along the 6m emergency access behind Lots 12 to 15 Lots. These hydrants will be accessible
                     for firefighting appliances (i.e., accessible from the emergency 6m access road) (Refer to Figure 13).

                     6.4. Vegetation Management
                     Onsite vegetation and landscape management are important to maintaining low hazard conditions by:
                             • Limiting fuel accumulation;
                             • Reducing connectivity of fuels;
                             • Establishing and maintaining defendable space;
                             • Appropriate landscaping; and
                             • The proposed lot size of the development will constrain the development of any additional
                                 bushfire hazard.

                     The potential for an unplanned vegetation fire to occur within retained vegetation is a function of the level of
                     hazard and the opportunity for ignition and fire development. The risk can be quantified in two parts:
                         • Internal
                         • External

                               6.4.1. Internal
                               The fuel loads of the environmental covenants should be monitored and managed to <8 tonne/ha.
                               This can be achieved by mechanical means or where attached to larger adjoining park it may be
                               achieved by hazard reduction burning. This will be managed by the Noosa Civic Centre Management
                               (Lot 1) .

                               Fuel loads in native bushland are described as surface; near surface; elevated and bark/canopy. The
                               control of surface and near surface fuels by mechanical means removes the elevated and canopy fuels
                               that are necessary to support and sustain a high intensity vegetation fire. The use of appropriate
                               planned burning will achieve the same outcome. Mechanical control and the use of planned burning
                               will prevent high intensity fire while maintaining the structural integrity and broad bio - diversity of
                               the vegetation.




                                                                                         Bushfire Planning Specialists | qldbushfireplanning.com.au
Document Set ID: 21753628
                  21426255
Version: 1, Version Date: 12/01/2022
                          24/03/2021
Log in to download the original file

SUPERSEDED Compiled Approved Plans for OPW20-0145 05.pdf · 73.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.