Extension to Currency Period - Approved DBW21/0183 01 · DBW21/0183.01

of 8

Text shows just the words. Original shows the document exactly as it was published.

                        Site Access and Driveways
                 17.    A sealed access driveway must be provided from Park Crescent to all parking areas of
                        the development. The works must be undertaken in accordance with an Operational
                        Works approval, be generally in accordance with the approved plans and must include
                        in particular a driveway crossover generally in accordance with Council’s Standard
                        Drawings RS-049 and RS-050 and any associated addendum.
                        Stormwater Drainage
                 18.    The site must be provided with a stormwater drainage system connecting to a lawful
                        point of discharge and/or disposed of on-site without causing scour or damage to the
                        subject site or any adjoining property. The works must be generally in accordance with
                        drawing number 31259-SW1.1 prepared by SCG Consulting Engineers dated
                        September 2021.
                        Geotechnical Stability
                 19.    All works must be carried out in accordance with the recommendations contained in the
                        Slope Stability Assessment – report No:31259(SL) prepared by SCG Consulting
                        Engineers dated 24 September 2021
                 20.    Prior to the commencement of the use certification must be submitted to Council from a
                        qualified person* which certifies that the development has been constructed in
                        accordance with the recommendations contained in the Slope Stability Assessment –
                        report No:31259(SL) prepared by SCG Consulting Engineers dated 24 September 2021
                        and that the development has a minimum factor of safety against landslip of 1.5 in the
                        long term.
                        *(Refer to advisory Note)
                        Earthworks and Retaining Walls
                 21.    All earthworks and associated retaining structures/batters, both above and below ground
                        level, both temporary and permanent, must be contained entirely within the subject site
                        unless written permission from the respective landowner(s) is provided to Council.
                        Damage to Services and Assets
                 22.    Any damage caused to existing services and assets as a result of the development
                        works must be repaired at no cost to the asset owner at the following times:
                        a.      where the damage would cause a hazard to pedestrian or vehicle safety,
                                immediately; or
                        b.      where otherwise, upon completion of the works associated with the development.
                        Any repair work which proposes to alter the alignment or level of existing services and
                        assets must first be referred to the relevant service authority for approval.
                 5.     REFERRAL AGENCIES

                 Not applicable.
                 6.     ADVISORY NOTES

                 The following notes are included for guidance and information purposes only and do not form
                 part of the assessment manager conditions:
                 PLANNING
                        Aboriginal Cultural Heritage Act 2003
                 1.     There may be a requirement to establish a Cultural Heritage Management Plan and/or
                        obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).




Document Set ID: 23339625
Version: 3, Version Date: 08/11/2024                                                                  Page 5 of 8
Log in to download the original file

Extension to Currency Period - Approved DBW21_0183 01.pdf · 157 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.