Planning report BDH
4.3 Engineering and Servicing
SCG Consulting Engineers provide the following plans addressing the engineering requirements:
- Driveway Access Plan
o driveway long section, min 2.35m clearance
o Stand up kerb and cross over detail
- Vehicle Turning Plan
- Stormwater Management Plan
o Stormwater pit sections
o Grated drain and level details
The plans demonstrate general compliance with the works codes, subject to further Operational
Works detailed assessment.
Although the rear of the site is mapped within the Moderate Landslide Hazard Area Overlay, the
existing topography has been modified to allow for the carparking area. The proposed
redevelopment and new car park area will address the stability of the site (including a geotechnical
comment of the footing design).
5.0 State assessment and other matters
5.1 State interests
5.1.1 Matters established in the Planning Regulation
There are no relevant matters applicable to the application.
5.1.2 State Planning Policy
The SPP includes assessment benchmarks that may be applicable where a local government
planning scheme does not adequately reflect the SPP. The Noosa Plan 2020 appropriately
integrates all SPP provisions, except for Natural Hazards, risk and resilience – coastal hazards – in
part (not applicable to this application).
Page 13 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Planning report BDH.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.