08/310 - Referral Agency Response - EPA [As Published] · 132008.310

of 6

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Queensland
8 Government

»

Enquires Ranald Scott

Telephone (07) 3224 5644

Your reference Applic. No.: 2008/310 G

Our reference BNE5690 Vol 16 - AMAs 729 Ree ut /
5

an

%
fe ROE x
Yo oe ve

 

    
 
 
  
 

  

Environmental Protection Agency

Incorporating the
Queensland Parks and Wildlife Service
28 March 2008

i * 4
gang

Q- APR Levv * |

ae iw

\eviantia

Noosa Council
C/- Peter Balmer

 

PO Box 141 aN
TEWANTIN QLD 4565 OTE
Dear Sir/Madam

The Environmental Protection Agency, acting as a concurrence agency under the /ntegrated
Planning Act 1997 for your application, advises that the correspondence indicated is attached:

Information request (C-1)

Notification of information request (C-2)

Notification of receipt of applicant’s response to information request (C-3)
Extension of information request/assessment period (C-4)

Request for applicant’s written agreement to extension of information
request/assessment period (C-5)

Concurrence agency response cover sheet (C-6)

Concurrence agency response about environmentally relevant activities (C-6 ERA)
Concurrence agency response about contaminated land (C-6 CLM)

Request for applicant’s written acceptance of concurrence agency response after
assessment period expires (C-7)

Amended concurrence agency response about environmentally relevant activities
(C-7 ERA)

Amended concurrence agency response about contaminated land (C-7 CLM)
Notification of decision in relation to a request to change or cancel a condition (C-8)
Notification of proposal to change or cancel a condition (C-9)

Notification of decision in relation to a proposal to change or cancel a condition (C-10)

OOOO OF Of8oOO OOOOO

Application information:
Concurrence agency office: Contaminated Land

Responsible officer: Ranald Scott

Page | of 2 16" Floor, 288 Edward Street, Brisbane

Queensland 4000 Australia
GPO Box 2771 Brisbane
Queensland 4001 Australia

Telephone: (07) 3224 5644

Facsimile: (07) 3247 3278

. Website: www.env.qid.gov.au
Printed on 100% recycled paper ABN 87 221 158 786

tom
Full text of the other 5 pages

Page 2

Postal address: PO Box 2771, BRISBANE QLD 4001

Telephone: 3224 5644 Fax: 32473278 E-mail: [email protected]

EPA no.: AMAs 7291 & 7292
Application no.: 2008/3 10
Property Description: Lot nos.: 150 & 151 Registered Plan no.: P93132
Property Location: 1 Woodland Drive, PEREGIAN BEACH
Signed
anald Scott

Project Manager - UXO
Contaminated Land

Ce:

The Chief Executive Officer
Noosa Council

PO Box 141

TEWANTIN QLD 4565

Attention: Duncan Thompson

IDAS covering letter (concurrence agency)

Page 2 of 2

Page 3

IDAS C-6

Concurrence agency response
Integrated Planning Act 1997 ss3.3.16 and 3.3.18

Applicant: Noosa Council
C/- Peter Balmer
PO Box 141
TEWANTIN QLD 4565
Application no.: 2008/3 10
Date received by EPA: 19 March 2008
Jurisdiction: Environmental Protection Act 1994
Role: Concurrence
Description: Material Change of Use
1 Woodland Drive, PEREGIAN BEACH
Lot nos.: 150 & 151 Registered Plan no.: P93132
1 Type of development
wi Material change of use
O Reconfiguration of a Lot
where:
0 the existing use of the land is, or if the land is vacant land with no existing use the most

Oo

4

2

recent use of the land was, for a notifiable activity under the Environmental Protection Act
1994.

the proposed use of the land is for child care, educational, recreational, residential or
similar purposes and the existing use of the land is, or if the land is vacant land with no
existing use the most recent use of the land was, for an industrial activity.

the land is on the Environmental Management Register or Contaminated Land Register
under the Environmental Protection Act 1994.

the land is wholly or partly within an area for which an Area Management Advice for
industrial activity or natural mineralisation has been issued and the proposed use of the
land is for child care, educational, recreational, residential or similar purposes.

the land is wholly or partly in an area for which an Area Management Advice for
unexploded ordnance (UXO) has been issued.

Response to development application

The Environmental Protection Agency (EPA), acting as a concurrence agency under the /ntegrated
Planning Act 1997, provides the following response to the application detailed above -

DOOOoOg

3

conditions must attach to any approval of the development
any approval must be for part only of the development
any approval must be a preliminary approval only

there are no concurrence agency requirements

the application must be refused

Reasons for including condition(s) or refusal

The site (the subject lot/s) is part of an area of land within which the Department of Defence
(Defence) has assessed a ‘substantial’ risk of residual UXO contamination exists. Visit the Defence

website ht

//www.defence.gov.au/uxo/ for details.

 

Defence advises that development or land use rezoning proposals for land within a ‘substantial’ zone
should only proceed following the conduct of UXO investigation and clearance activities. Defence

VER 2

Page 4

IDAS C-6

maintains a list of commercial UXO investigation and remedial search contractors that it accredits to
carry out this work.

Defence also recommends that owners or occupiers of potentially affected land and workers and
contractors employed on the land need to be aware of the procedure if a suspect object is found.

As the EPA has no record of the site being further investigated or remediated, it is considered that
there remains a possibility of UXO being found on it.

4 Conditions
The following concurrence agency conditions are to be attached to any approval:

4.1 Prior to the commencement of any development-related excavation, earthworks or soil
disturbance, that part of the site to be so worked is to be subjected to investigation and,
where necessary, appropriate remedial action.

4.2 Any person employed to work on any part of the site where Condition 4.1 has not been
satisfied is to be forewarned in writing by the applicant.

This warning is to explain that information available to the EPA indicates a potential for
residual UXO exists on the site and work should proceed with due caution. It is to state the
procedure to be followed by any person finding an object suspected of being explosive
ordnance or component thereof:

Do not disturb the object.

Take action, where appropriate, to prevent it being disturbed by another person.
Note its approximate dimensions and general appearance.

Note the route to its location.

Advise the Police as soon as possible.

4.3. Following investigation and any remedial action taken to satisfy Condition 4.1 above, the
applicant is to submit a report, prepared in accordance with current guidelines, to the EPA for
assessment. The EPA is to subsequently advise the Noosa Council and the applicant of its
assessment in regard to Condition 4.1 being satisfied.

4.4 No gravel, rock, sand or soil is to be removed from the balance part of site without written
EPA approval.

4.5 The applicant is to advise the owner and any occupier of the site of the above responsibilities.

5 Additional comments or advice .

Applicants may contact the EPA’s Contaminated Land Unit on (07) 3224 5644 or visit the Defence
website http://www.defence.gov.au/uxo/ for the details of current UXO investigation and remedial
search contractors. The EPA accepts reports based on investigative and remedial work carried out
by these contractors.

Invéstigation and remedial action to satisfy Condition 4.1 typically involves sampling/search
programs with detection equipment unless the use of such equipment is:
* considered unwarranted by a UXO contractor due to the extent of any prior excavation or
earthworks or, conversely, of any filling proposed as part of the development program; or

VER2

Page 5

IDAS C-6

® prevented or made impracticable by the presence of a structure, stockpile, natural barrier or
metal waste.

In the latter case, alternative action may be appropriate to minimise the risk in the first instance. For
example, where the risk of exposure to any UXO that may exist is reduced by the presence of a
structure or natural barrier, issuance of the standard UXO warning (see Condition 4.2) may suffice
while the structure, stockpile or barrier remains in place. Where a structure is to be removed or
reduced as part of the development program, protective precautions, commensurate with any greater
risk to which workers might then be exposed, may need to be considered. Progressive assessment
will be necessary where such circumstances exist. Unless, at the completion of preliminary works,
there is evidence then available to the UXO contractor that any residual risk is negligible, the use of
detection equipment will typically be required to confirm the site’s status. .

Where investigation, along with any subsequent remedial action and assessment, is to be
implemented by stages to satisfy Condition 4.1 and 4.3, a preliminary investigation report should be
submitted by the applicant to the EPA along with a management plan for the proposed work. Staged
investigation/remediation is most likely to be applicable where development of smaller, built-on lots
(which can present circumstances such as those discussed above) or broadhectare sites is proposed. In
such cases, the EPA’s assessment of the report and advice to Council in regard to approval of the
development will be dependent on agreement with the management plan.

Where Condition 4.1 is to be satisfied by a whole lot or broadhectare development stage being
subjected to investigation and any necessary remedial action, the EPA, based on the subsequent
investigation/remediation report’s findings and recommendation/s, may reassess the lot, or that portion
comprising the development stage, as being remediated or not needing remediation, and advise the
applicant and Council accordingly. Otherwise, any balance of land that has not been further
investigated will retain the risk assessment made by Defence. This is unless evidence obtained from
the investigated part/s can be used to refute Defence’s assessment in regard to all or part of the
balance. In the latter case, the EPA may reassess all of the balance or the applicable part/s as being
unaffected by UXO.

6 Additional information

This concurrence response applies only to contaminated land issues and does not remove the need to
obtain any further approval for this development which may be required by this or other legislation,
State and/or Commonwealth. Applicants are advised to check with all relevant statutory authorities.
Applicants should also comply with all relevant legislation.

The EPA has not provided a notification to native title parties for this application. The State’s
Native Title Work Procedures indicate that the responsibility for assessment of native title issues for
an IDAS application rests with the Assessment Manager. It is recommended that the Assessment
Manager determines whether native title notification is required for this application.

*End of response*
IDAS C-6 CLM

VER 2

Page 6

UNEXPLODED ORDNANCE (UXO) CONTRACTORS

Department of Defence accredited UXO investigation and remedial search contractors are listed below.
The Environmental Protection Agency (QLD) accepts reports based on investigative and remedial work carried out by these contractors.

 

 

BACTEC South East Asia Pty Ltd

Managing Director:
Timothy Pippett

Unit 1, 43 Stanley Street
PEAKHURST NSW 2210

Tel: (02) 9584 7500
Mobile: 0412 663 541
Fax: (02) 9584 7599
Email:

[email protected]
Website: http://www.bactec.com.au/

 

 

Manager, Explosive Ordnance Services:

Mark Latimer

Tel/Fax: (07) 5526 0881
Mobile: 0438 443 283

 

 

G-tek Australia Pty Ltd

Chief Operating Officer:
Greg Guthrie

25 Applecross Avenue
CASTLE HILL NSW 2154

Tel: (02) 9680 7268
Mobile: 0418 977 424
Fax: (02) 9680 7403
Email:

 

Website:
http://www.g-tek.biz/

  

UXO Projects Manager:
Max Verrier

Tel: (07) $493 8577
Mobile: 0418 776 203
Fax: (07) 5493 7405

 

 

Milsearch Pty Ltd

Managing Director:
David Halmarick

Unit 5, Level 1

30 Mawson Place
MAWSON ACT 2607
Mailing Address:

PO Box 687
MAWSON ACT 2607

Tel: (02) 6286 8299

Mobile: 0419 944 397

Fax: (02) 6286 8266

Email: [email protected]
Website: http://Awww.milsearch.com.au/

 

 

Queensland Operations Manager:
Paul Ingerton

Tel: (07) 3824 1669
Mobile: 0413 452698
Email: [email protected]

 

 

CSG Demining Consultants

(Offers all Consultancy & Investigation
services but does not undertake
Remediation)

Managing Director:

Carl Chirgwin

151 Golf Links Road
MAIDEN GULLY Vic 3551

Tel: (03) 54462408
Mobile: 0417-527264
Fax: (03) 54462481
Email: chirgwins,
Website:

 

http://www.csgdemining.com.au

 

 

This list is drawn from the Department of Defence National UXO Office’s panel of UXO investigation and remedial search companies that can be found on

ht

 

:/iwww.defence.gov.au/uxo/
Version — 21/08/2007

 

Used in these records

About this file

File size
306 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_310 - Referral Agency Response - EPA [As Published].pdf · 306 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.