viii. A Stormwater Management and Erosion and Sediment Control Plan will be
implemented during the construction phase of operation, including water quality
monitoring requirements. A whole of site Stormwater Management Plan is to be
developed to inform the Site Based Management Plan to be in place during the landfill
operation phase.
ix. Site management to conduct regular site inspections during landfill operations in
accordance with the Site Based Management Plan. This includes general site
inspections and audits against approval conditions and standard procedures.
x. Construction quality assurance will be implemented during construction of the landfill
facility to provide confidence that the construction meets the design requirements and
specifications.
xi. Additional / alternative environmental requirements to be implemented using adaptive
management principles as required.
Noosa Landfill & RRC Expansion – MNES & MSES Significant Impact Assessment 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.