Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Attachment 7A - Impact Assessment Report

of 48

Page text shows just the words. Original shows the document exactly as it was published.

                                                                             Native Foresters



viii.    A Stormwater Management and Erosion and Sediment Control Plan will be
         implemented during the construction phase of operation, including water quality
         monitoring requirements. A whole of site Stormwater Management Plan is to be
         developed to inform the Site Based Management Plan to be in place during the landfill
         operation phase.

 ix.     Site management to conduct regular site inspections during landfill operations in
         accordance with the Site Based Management Plan. This includes general site
         inspections and audits against approval conditions and standard procedures.

  x.     Construction quality assurance will be implemented during construction of the landfill
         facility to provide confidence that the construction meets the design requirements and
         specifications.

 xi.     Additional / alternative environmental requirements to be implemented using adaptive
         management principles as required.




Noosa Landfill & RRC Expansion – MNES & MSES Significant Impact Assessment                      18
Log in to download the original file

Attachment 7A - Impact Assessment Report.pdf · 4.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.