In the Planning and Environment Court No. 2587 of 2008 Held at: Brisbane Between: SCANLON PROPERTY GROUP PTY LTD ACN 125 864 360 Appellant And: SUNSHINE COAST REGIONAL COUNCIL Respondent And: CHIEF EXECUTIVE, ENVIRONMENTAL First Co-Respondent by PROTECTION AGENCY election And: RENALDA JOY GORRIE Second Co-Respondent by election JUDGMENT Before His Honour Judge Rackemann Date of Hearing: 12 February 2010 Date of Judgment: 12 February 2010 THIS MATTER HAVING been heard by the Planning and Environment Court on 12 February 2010 by way of an appeal against the decision of the Respondent made on 21 August 2008 to refuse a development application made by the Appellant for a development permit for a material change of use (visitor accommodation type 4 — conventional, commercial business type 1 — office, retail business type 2 — shop and salon, and entertainment and dining business type 1 — food and beverages) under the integrated Planning Act 1997 in respect to land situated at 215A-219 David Low Way, Peregian Beach described as Lots 8 -10 on P9315 and Lot 76 on MCH2969; AND UPON HEARING the solicitors for the Appellant and the Respondent; AND UPON READING the Notice of Appeal filed herein on 19 September 2008; AND-UPON-THE-GOURT _BEING-SATISFIED-that-there_-has—_been—compliance—with-the. -equirements_of Ghapter-4 ntegrated-PlanningAet4997 +egarding-serviee-of-the-Notice-of ‘Appeat-and-compliance-wittr the-requirements-of Chapter-3;integrated- Planning Act T9987 regarding publie-netifieation; IT iS ADJUDGED THAT: 1. The appeal be allowed; and 2. The application be approved subject to the conditions in the development approval package attached to this Judgment and marked “A”. JUDGMENT Norton Rose Australia Filed on behalf of the Appellant Level 17, 175 Eagle Street, Brisbane QLD Form PEC-7 Phone no. (07) 3414 2888 Fax no. (07) 3414 2999 Reference: 2658916
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 35 pages
Page 2
Filed on 2010 Filed by: Norton Rose Australia Service Address: _ Level 17, 175 Eagle Street, Brisbane Qid 4000 Phone: (07) 3414 2888 Fax: (07) 3414 2999 Reference: 2658916 (on behalf of the Appellant) Registrar
Page 3
Approved Plans 1. nytt Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are prepared by Carl Brunskill Architects and JMA Architects and are listed in the following table: Pian No. Rev. Plan / Document Name Date 20517_ A-40 a Site Plan Basement 20 November 2009 20517_A-41 a Commercial Precinct Floor Plans 20 November 2009 20517_A-42 a Commercial Precinct Elevations 20 November 2009 20517_A-43 a Commercial Precinct Elevation & 20 November 2009 Section 20517_A-06 - Site Plans Sections A-D 5 March 2009 20517_A11 - Tourist Accommodation Typical Plan 5 March 2009 20517_A-12 - Tourist Accommodation Typical 5 March 2009 Elevations 20517_A-13 - Tourist Accommodation — Typical 5 March 2009 Sections 20517_A-14 - Beach Shacks Single Beach Shack 5 March 2009 20517_A-15 - Beach Shacks Double Beach Shack 5 March 2009 20517_A-05 - Site Plans Sections 1-4 5 March 2009 20517_A07 - Site Plans Street Elevation 5 March 2009 For the sake of clarity, the form of commercial buildings approved here is reflected in those drawings 20517 A-40 to 20517 A-43 (inclusive), dated 20 November 2009 (and not as otherwise shown in Drawings 20517 A-05 & 20517 A-07). The approved plans may be further amended by the conditions herein. General 2. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. The units shall operate in accordance with the defined use of ‘Visitor Accommodation — Type 4 Conventional’ in the Noosa Plan, which provides for short term visitor accommodation. The units shall not be used for the purpose of permanent residential accommodation, with the exception of two manager/caretaker’s units. The Community Management Statement for any or all Bodies Corporate having control of the development, or any part thereof, shall incorporate this requirement. All buildings shall be finished in natural, muted tones as generally indicated on Drawings 20517 A-42a and 20517 A-43a. Any deck or balcony areas shall not be fully enclosed with shutters, glass panelling or the like, thus remaining open structures. Any rooftop plant or mechanical equipment extending more than 1 metre above the roofline shall be screened using lightweight screening materials that visually integrate with the building design.
Page 4
8. All fencing shall be setback at least 1 metre from the front property boundary, with at least half of the fencing setback 2 metres. The area of land between the fence and the front property boundary shall be densely landscaped to screen any fencing from the street. Any advertising sign or device is to comply with Council’s policies on advertising. Building Height 9. 10. The finished height of the buildings shall not exceed the heights identified on the approved plans of development. A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged with Council at completion of work confirming compliance with the maximum allowable building height as required by the conditions of approval. Business Uses 11. 12. 13. 14. 15. The ground floor retail tenancies are to have a minimum of 50% transparent glazing fronting the street. All goods are to be displayed on site within the property boundaries and/or on the premises approved for the use. No outdoor dining is permitted for the shops and restaurants. The office is approved for the administration of the Visitor Accommodation units and the development in general only. The shops and restaurant shall not operate outside the hours of Sunday to Thursday 7am to 10pm, and Friday and Saturday 7am to 12 midnight. Existing Vegetation 16. 17. 18. 19. 20. Existing trees on the site and within road reserves are to be retained, except where tequired to be removed due to building operations. In this regard, all native trees located outside the general building footprints, driveways, and car parking areas shall be retained on site. All trees to be retained and/removed shall be identified in the landscape plans. All significant trees in the frontages of the site (excluding palms) shall be retained as far as practical. Following investigation into the root structure of those trees, reallocation of carparking and motorcycle spaces is to be made to provide clearance to roots. An arborist shall be engaged to confirm appropriate conditions and working clearances. The trees required to be retained shall be protected from construction impacts in accordance with an approved arborist report submitted with an application for a Development Permit for Operational Works. A qualified arborist shall monitor the health and structural integrity of the trees to be retained on site. The monitoring shall occur at least monthly during the construction period and quarterly for 12 months after construction is completed. The developer shall rectify any decline in the health or structural integrity of the trees, in accordance with the arborist’s recommendations. Cleared vegetation is to be suitably processed by one of the following methods and removed from the site:- 20.1 Re-use for building materials. 20.2 Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres between edges of heaps. 20.3 Disposal for firewood. 20.4 Disposal for landscaping purposes.
Page 5
20.5 Transport to alternative site for breaking down materials provided that all necessary permits have been obtained to allow the alternate site to be used for this purpose. 20.6 The disposal method for clearing works is to be submitted in conjunction with an application for a Development Permit for Operational Work. The Applicant is advised that other methods may be considered provided full details of the method are submitted. The Applicant is advised that burning off is an unacceptable method of disposal. Landscaping 21, The open space and setback areas are to be landscaped in accordance with Council's Policy on Landscaping Guidelines and a properly prepared landscape plan. Such landscaping is to be completed prior to the premises being occupied and shall be maintained at all times thereafter. The landscaping plans submitted for approval shall include:- 21.1 Native trees of a minimum bag size of 100L to replace existing trees to be removed from the site, at the rate of 1 replacement tree for every 1 tree removed. 21.2 A vegetated buffer to screen the commercial building to the Road 151 (stub road) adjacent the site’s southern boundary. 21.3 A vegetated buffer a minimum of 3 metres wide along the site’s eastern boundary to Peregian Beach Hote! to screen and provide filtered views of the development from David Low Way. 21.4. A minimum of 16 trees of a minimum bag size of 100L and 4 trees of a minimum bag size of 400L shall be provided to the site's road frontages. 21.5 A feature tree of a minimum bag size of 400L provided to the David Low Way frontage planted between Buildings A & B to replace the proposed sculpture. 21.6 The 3 metre wide landscape areas to David Low Way frontage shall be extended to reduce’ the extent of hard pavement and increase the amount of soft landscaping. 21.7 Landscape treatment (including paving) to the site's road frontages shall be designed to match in with the existing streetscape of Peregian Beach Village. 21:8 Planting and maintenance regime details to address the ongoing health of all large plantings (i.e. greater than 45L); Fire Management 22. The development shall be carried out generally in accordance with the fire management measures recommended in the Natural Solutions Report dated 21 November 2007. Bicycle Parking & End of Trip Facilities 23. 24. Secure bicycle racks shall be provided on site to accommodate a minimum of 17 bicycles. The cycle parking rack is to be made available for customers and staff of the retail premises at all times during business hours. End of trip facilities shall be provided for staff and shail include: 24.4 a minimum of six lockers; and 24.2 a minimum of one male and one female shower cubicles with ancillary change rooms. Outdoor Lighting 25. Any outdoor lighting with the potential to affect surrounding residential premises shall be designed, installed, operated and maintained in accordance with AS4282 “The Control of the Obtrusive effects of Outdoor Lighting’.
Page 6
Energy & Water Efficiency 26. All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems (LPG or natural). 27. All new kitchen, laundry and bathroom fittings shall comply with the AAA. Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), or current equivalent standards as may apply, with toilets to comply with the AAAA Water Conservation Rating System. All new tap ware and shower roses shall not exceed a maximum flow of 9 litres per min. Dishwashers and washing machines are excluded from this requirement. Development Permits 28. The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to obtaining a Development Permit for Building Works. Compliance Bond 29. Security in the form of a cash bond or trading bank guarantee for the sums of $50,000 must be submitted to secure performance of all conditions of this approval prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. 30. The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. Relevant Period 31. The Development Permit for a material change of use lapses if the use has not started by 4 February 2014 and all works associated with the development have not been completed by 4 February 2016. Lot Amalgamation 32. All separate, adjoining lots that form part of this application shall be amalgamated into one undivided allotment in accordance with Section 3.7.3 of the Integrated Planning Act and the Plan of Survey submitted for registration at the Land Titles Office. Proof of title being issued for the amalgamated lot shall be submitted to Council prior to the issue of the Development Permit for Operational Works. Vehicle Access 33. A vehicular access driveway to serve the site shall be constructed from the Road 151 frontage of the site as detailed on Drawing 20517_A-40a by Carl Brunskill Architects and JMA Architects and dated 20 November 2009. 34. The driveway shall be designed and constructed to Council’s design standards and to grades that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath without any step or level difference. Should any driveways be constructed to grades that do not comply with AS/NZS 2890.1-2004 and AS 2890.2-1989, Council will require that the driveway be removed and reconstructed to levels that do comply. 35. Please note, a step between the driveway and the footpath shall be avoided, as it is preferred to have the footpath continue at a constant grade to minimise the potential for pedestrians to trip or fall. 36. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath, the driveway and any associated fencing or vegetation near the driveway shall comply with the minimum sight line requirements as defined in AS 2890.1, section 3.2.4. The applicant shall demonstrate compliance by illustrating these sight lines on the plans submitted for both Operational Works approval and Building Works approval. 37. All vehicles shall enter and leave the site in a forward direction.
Page 7
Car and Motorbike Parking Off Street 38. 39. 40. A minimum of 140 carparking spaces and 8 motorbike spaces shall be provided within the site generally as shown on drawing number on Drawing 20517_A-40a by Carl Brunskill Architects and JMA Architects and dated 20 November 2009 except as modified herein. The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004 for user class 3 with allowance for vehicles to enter and leave the site in a forward gear and with a minimum head clearance (headroom) at any point of 2.2m. All carparking shall be kept, maintained and line-marked in a condition fit for use. Frontage Works 41. 42. 43. 44. 45. 46. The existing bus bay at the frontage of the site shall be reconstructed to provide for a new kerb and channel line parallel to the running lane edge. This shall require the reconstruction of footpaths and associated services. All associated and ancillary work including pavement correction to the existing pavement, drainage, adjustment to the footpaths and adjustment to existing infrastructure shall be undertaken to complete these frontage works. These works must be undertaken at no cost to Council. The existing bus shelter at the frontage of the site shall be relocated northward to be located at the head of the bus bay. As an alternative, Council would give consideration to incorporating shelter and seating on the development site and removing the existing shelter. Footpath improvements such as topsoiling, grassing, and tree planting are required to the Road 151 (stub road) road frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines. Grass shall be couch, free of weeds. A new 2.0m wide concrete path shall be constructed along the Road 151 (stub road) toad frontage of the site in accordance with Council's design standards and to an alignment that protects any significant vegetation or any underground services. All paths, pram ramps, driveways and parking areas shall be designed and constructed to ensure pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and to be in accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1 Design for Access & Mobility. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath paving and landscaping such as trees and grasses in accordance with Council's Standard specifications prior to commencement of the use permitted by this permit. Koala management 47. 48. The development must comply with the requirements of Nature Conservation (Koala) Conservation Plan 2006 and Management Program 2006 -- 2016 (The Koala Plan) for development in an Urban Koala Area. In this regard, the development must constitute a koala sensitive design and demonstrate maintenance of habitat linkages. To demonstrate compliance with The Koala Plan the application for Operational Works must be accompanied by a Koala Management Plan for the detail design, construction and operational phase of the development. The Koala Management Plan must detail measures required to be implemented to achieve the intent of The Koala Plan during the detail design, construction and operational phase of the development. As a minimum, the Koala Management Plan must: i. Provide a plan that locates Koala Habitat Trees on the site, ii. Include recommendations of the site arborist for practical and achievable measures in the detail design phase to maintain the koala habitat trees as far as practical,
Page 8
iii, Detail the location and design of koala friendly fencing required around the site to allow koala movement across, to and from the site; iv. | Nominate whether dogs shall be permitted on the site. In the event dogs are intended to be kept on the site they must be located in enclosed areas isolated from expected koala movement corridors, and be surrounded by koala exclusion fencing. Dogs permitted on site must be less than 10kg and kept in the enclosed areas at all times. Dog enclosure areas must not prohibit koala movement to or from the site or to the koala habitat trees nominated for retention. v. Where koala habitat trees are required to be removed as a result of the development of the site, nominate the location and species for replacement planting of the site. vi. Detail a koala friendly swimming pool design to be implemented into the development. Vegetation Protection & Preservation 49. The applicant shall submit an Arborist’s report with the Application for Operational Works detailing the extent of construction activities required around the root zone of trees required to be retained, or nominated in the Koala Management Plan to be retained, on site and measures required to ensure protection of the health of those trees. The applicant must ensure all recommendations of the Arborist report are implemented during detail design and construction of the development. Parkland Restoration and Dedication 50. 51, 52. 53. 54. 55. The applicant is required to dedicate to Council as Parkland for Environmental Purposes, the balance portion of Lot 76 on MCH 2969 Iocated to the west of the 6m unvegetated setback required by the Bushfire Management Plan. In this respect the applicant is required to seek a Reconfiguration of a Lot approval to enable dedication of the Parkland. The Application for the Reconfiguration of a Lot must include an accurate survey plan detailing the location of the land to be dedicated to Council as Parkland. The applicant is required to submit a Plan of Survey that details all lands described as ‘Parkland’ as required by these conditions to be dedicated to the Crown (with Council as Trustee) for Environmental Purposes pursuant to the Land Act 1994. Dedication of parkland to the Crown shall be at no cost to Council. An Ecological Restoration Plan for the Parkland shall be prepared in accordance with the requirements of Council's Planning Scheme Policy PSP18 Ecological Assessment Guidelines and submitted for Council approval prior to applying for a Development Permit for Operational Works. The park areas of the site shall be revegetated and rehabilitated in accordance with the Council approved Ecological Restoration Plan. The Ecological Restoration Plan shall be prepared by a qualified and experienced Ecologist, to the reasonable satisfaction of the Council. The Ecological Restoration Plan (ERP) shall be applicable to the portion of the site to be dedicated to Council as Parkland and address environmental weed removal and control, rehabilitation of existing vegetation communities and revegetation strategies for degraded areas of the area of the site to be dedicated as parkland. It shall identify all the areas of the park that require ecological restoration, specify actions and works necessary to result in robust, self-sustaining, viable indigenous plant communities and habitat. The ERP shall aim to revegetate the park areas with suitable native species to resemble the local endemic ecosystem by removing all noxious and environmental weeds from the site and include the planting and maintenance requirements of the Council approved Bushfire Management Plan for the site. The ERP shall detail continual maintenance requirements for a 1 year period (the maintenance period) to enable the revegetation and rehabilitation works to be self-maintaining. To this extent Council's Coordinator of Environment and Landscaping must be consulted during the preparation of the plan. The following, inter alia, shall be addressed and included in the Ecological Restoration Plan and specifications:
Page 9
56. 57. 58. 59. 55.1 document the current status of the areas requiring ecological restoration in terms of structure, floristics, missing elements, health, vigour, etc.; 55.2 specify the required works and actions for each area in terms of: 55.3. site preparation (this may include thinning, grass removal, weed removal and control, etc.); 55.4 establishment of the missing floristic and structural elements; 55.5 creating opportunities for regeneration from the seed bed, natural recruitment and the establishment of wildlings; 55.6 habitat creation and reinforcement for native fauna and reinforcement of habitat linkages and corridors; 55.7 planting and mulching procedures; 55.8 fertilizing procedures; 55.9 watering procedures; 55.10 protection from wildfire, particularly during the establishment phase; 55.11 erosion and sediment control; 55.12 on-going maintenance; 55.13 access for maintenance; 55.14 environmental safeguards; and 55.15 incorporation of the relevant requirements of all the management plans required by this approval, particularly the Bushfire Management Plan and Koala Management Plan. The eradication and control of environmental weeds will be an integral part of both the Ecological Restoration Plan and the Landscaping Works. Vegetation used in restoration work and landscaping shall exclude environmental weed species. A wire fauna fence shall be erected around the perimeter of the park areas to be protected and restored, prior to construction activities commencing on site. The fauna fence will have signs attached restricting entry to authorised persons only. The contract for the Ecological Restoration work shall specify a 1 year maintenance period from the date restoration works are completed by the contractor to the reasonable satisfaction of the Council's Coordinator of Environment and Landscaping, by which time the ecologically restored areas should be self-sustaining. It shall also be weed-free to the satisfaction of the Manager, Council’s Coordinator of Environment and Landscaping. The applicant must provide Council's Coordinator of Environment and Landscaping with a certification from a suitably qualified person confirming that management of weeds within the park area complies with the requirements of the Land Protection and Stock Route Management Act. All the relevant ecological restoration works and actions shall be undertaken by the Developer and completed prior to dedication of the park areas to Council. Roof Water & Stormwater Drainage 60. Roof runoff from any new building shall be directed to a rainwater storage system or tank that is installed to ensure water from the rainwater storage system or tank is used for external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use in washing machine cold taps and toilet cisterns. All rainwater fanks are to be designed and installed in accordance with the Queensland Development Code (QDC) current at the time of building approval, and shall be part of the plumbing application for approval. The location and capacity of the tanks shall be clearly shown on the plans submitted for Operational Works approval and any overflow shall be directed to the on site stormwater drainage system. In particular, the plans detailing
Page 10
61. 62. 63, 64. 65. 66. 67. 68. 69. rainwater tanks must be amended to include rainwater tanks/alternative water supply for the commercial/hostel building fronting David Low Way. All stormwater drainage (including roof water overflow from the rainwater storage system) shall be collected and discharged so there is no net increase in stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall be discharged via existing and proposed drainage structures contained within the site, as detailed within the Simmonds Bristow report titled "Essence of Peregian Stormwater Management Plan, Sediment and Erosion Control! Plan", dated 30 November 2009, except as modified by these conditions. The maximum discharge of stormwater drainage allowable to Council's kerb & channel street drainage system at any one location is 25 litres/second. A detailed Stormwater Management Plan and a Sediment and Erosion Control Plan shall be prepared. This will generally be in accordance with Simmonds and Bristow Report “Essence of Peregian Stormwater Management Plan, Sediment and Erosion Control Plan’, dated 30 November 2009. MUSIC modelling and reporting shall be refined to incorporate the final proposed design. Grease and Oil arrestors and/ or stormwater quality improvement devices must be incorporated into the design to treat all run-off prior to run-off exiting the premises Grease and Oil arrestors or stormwater quality improvement devices must be consistent with the design and water quality objective requirements specified within the Essence of Peregian Stormwater Management Plan, Sediment and Erosion Control Plan dated 30 November 2009. A detailed maintenance plan shall be prepared for the proposed stormwater management system, which shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. The approved maintenance plan shall be incorporated in the Community Management Scheme for the development and a copy of this shall be provided for Council's records prior to commencement of the approved Use. A Development Permit for Building Works shall not be granted until a Development Permit for Operational Works has been issued in regard to the drainage scheme. The fill material (including topsoil) to be used within stormwater treatment areas (i.e. including but not limited to stormwater infiltration swales and other areas as required by the Simmonds and Bristow Plans) shall achieve a minimum infiltration rate of 75mm/hour without clogging. Sand is required to achieve this infiltration rate hence clays and silts are not allowed as fill material. Specific infiltration and soils property testing shall be carried out to demonstrate the suitability of proposed fill material. Such testing shall be on the fill material prior to placement. All habitable dwellings shall be located above the ARI 100 year flood level, which is set at RL 3.5m for the site. The ARI 2 year event flood level is set at RL 3.0m AHD in relation to regional flooding. All site stormwater drainage shall be by means of a gravity system. In this respect, the application for Operational Works Approval for Stormwater must be accompanied by a stormwater drainage plan that demonstrates compliance with this condition. Environmental Management Plan 70. 71. An Environmental Management Plan (EMP) for the Site shall be prepared and implemented by persons holding appropriate environmental qualifications and proven expertise in the preparation and implementation of EMPs, to ensure that the impact on the environment of the construction and operation of the Development is minimised, the Environmental Values of the Site are protected and enhanced and the Development is ecologically sustainable. The EMP shall be cognisant of the following:-
Page 11
71.4 71.2 71.3 71.4 71.5 The EMP shall demonstrate a high leve! of environmental care and responsibility and be consistent with best practice for developments of this type in similar environments. The EMP shall detail the Developer's environmental policy and the proposed environmental management system for the Site. The EMP shall specify: 71.3.1the performance targets, including those derived from the Conditions and other requirements arising from legislation and other approvals; 71.3.2 how the performance targets are to be achieved; 71.3.3 who is responsible; 71.3.4 when the performance targets will be satisfied; 71.3.5 how performance will be monitored; 71.3.6 corrective actions and contingency measures; 71.3.7 reporting arrangements; 71.3.8 auditing arrangements; 71.3.9 how the requirements are to be incorporated into construction and works contracts; 71.3.10 how the Developer's employees, contractors and the contractor's employees will be informed and trained with respect to the environmental protection requirements; 71.3.11 enforcement; and 71.3.12 penalties for non-compliance. In particular, but without limitation, the EMP shail address the following issues in relation to the construction phase : 70.4.1 legislative compliance; 70.4.2 soil erosion and sediment control; 70.4.3 vegetation protection; 71.4.4 fauna and fauna habitat protection; 71.4.5 weed and pest control; 71.4.6 water quality protection; 71.4.7 ground water protection; 71.4.8 air quality protection; 71.4.8 storage and handling of hazardous substances; 71.4.9 noise and vibration management; 71.4.10 waste management; 71.4.11 cultural heritage management; 71.4.12 visual amenity protection; in particular, but without limitation, the EMP shall address the following issues in relation to the operational phase: 71.5.1 legislative compliance; 71.5.2 water conservation; 71.5.3 water quality protection; 71.5.4 maintenance of Stormwater Quality Improvement Devices
Page 12
72. 71.5.5 vegetation protection; 71.5.6 fauna protection; 71.5.7 bushfire control; 71.5.8 weed and pest control. 71.9 waste management. The EMP shall be submitted to Council in prior to or in conjunction with the lodgement of any development applications for Operational Works for the Site. Operational Works approval shall not be granted until the EMP is approved by the Coordinator of Environment and Landscape. The Developer shall comply with the requirements of the EMP. Sewer Mains 73. 74, 75. 76. The site shall be connected to Council's existing sewerage reticulation systems and be constructed in accordance with Council's standards and requirements at no cost to Council. Existing sewer traversing the site to be abandoned and removed in accordance with Council’s Planning Scheme Policy, PSP6 - Water & Sewerage Design Standards. New sewer to service existing connection to Lot 51 SP156203, No.221 David Low Way to be constructed along and within the northern and eastern boundary of the development site to a point adjacent to Council sewer manhole MP20/02/09. Connection to be made to existing manhole by contractor approved by Sunshine Coast Regional Council. New sewer to be contained in an easement in favour of Council in accordance with the requirement contained in Council's Planning Scheme Policy, PSP6 - Water & Sewerage Design Standards. No building or other structure requiring a building permit will be allowed within the zone of influence of the sewer. Town Water Supply 77. 78. 79. 80. The site shall be connected to Council’s existing town water supply and be constructed in accordance with Council's standards and requirements at no cost to Council. A single Council installed primary water meter must be provided immediately inside the property boundary. Additional water meters must be installed for each title of a community title or sub-lease scheme. Meters must be Council approved, installed in accordance with Council requirements and remain accessible at all times for reading and maintenance purposes. A separate metered domestic main and bypass fire main must be provided within the development in accordance with Sunshine Coast Water Standards The applicant is advised that this development may require the provision of fire hydrants and a booster pump in accordance with the Building Code of Australia, and consultation may also be needed with Queensland Fire Services to ensure suitable fire fighting infrastructure is provided. To this end, any necessary fire hydrants shall be clearly shown on the plans submitted for both Operational Works and Building Works approval and if a booster pump is deemed necessary, the plans shall indicate where the fire truck is to be accommodated in order to provide boosting to the water supply. Service Easements (Sewer) 81. A registered easement shall be created over the zone of influence of all sewers within the subject site and over those parts of the subject site that are impacted upon by sewers on any adjoining sites. The easements shall generally be parallel to and centred over the sewer main and be equivalent in width to twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the finished surface) and be no less than 3.0m wide overall. in this regard a licensed surveyor shall accurately locate all sewer mains and determine the necessary width of the easement, which shall be shown on any plans submitted for Operational Works approval. To this
Page 13
82. 83. 84, extent the surveyor shall certify that the sewer and the zone of influence is wholly contained within the easement to be created. In addition to this the Applicant’s Solicitor shall give Council's Solicitor an appropriate undertaking in writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly. A duly executed copy of the easement shall be submitted to Council for perusal prior to the use commencing. Any changes required by Council's Solicitor must be corrected immediately. A registered easement shall be created over any stormwater drainage pipes within the site that collect stormwater from a Council road or convey stormwater from any adjoining property (for example, where drainage pipes are provided within the site to prevent adjacent properties from additional ponding/flooding due to the subject site being filled). No building or other structure shall be constructed or encroach over an easement. Any building or structure within the zone of influence of other public utility's underground must have its foundations designed so that no surcharge loads are imposed upon such underground infrastructure. Foundations must be taken down a minimum of 1.0m below a line of influence measured 1.0m in the direction of the foundation from the centreline of the closest underground service and along the natural angle of repose of the foundation soil type(s). Plans, and supportive documents, detailing these proposed foundations shall be designed by a registered practicing Geotechnical Engineer and submitted with the application for a Development Permit for Operational Works. Earthworks 85, Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or structures that border the development site. Fences that are affected shall be replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced shail be clearly shown on the plans submitted for Operational Works approval. Acid Sulfate Soils 86. As the site is located below the 20m AHD and above the 5m AHD, any excavation works consisting of 100m* or greater which extends below 5m AHD will need to be carried out in accordance with State Planning Policy 2/02 Planning and Managing Development Involving Acid Sulfate Soils. In this regard appropriate testing and supporting documentation prepared by a suitably qualified specialist shall be submitted to Council for approval prior to obtaining a Development Permit for Operational Works. Erosion and Sediment Control 87. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are tequired to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. Contributions Towards Council Infrastructure 88. Monetary contributions shall be paid to Council towards the cost of providing and/or upgrading various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution amounts under the current Council policies and requirements is outlined in the table below: Contribution Required For: Amount:
Page 14
PSP12 — Public Open Space Contributions (Park) $47, 529.00 PSP16 — Sewerage Headworks Contributions $387,739.08 PSP17 — Water Supply Headworks Contributions $346,368.38 | PSP20 ~ Pathway Trunk Network Contributions $32,272.83 TOTAL Contribution Amount = $813909.29 Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane from September 2009 until the date of payment. All contributions must be paid prior to commencement of the use. General 89. For the following classes of work associated with development, a Development Permit for Operational Works must be obtained prior to commencement of works relating to that class of work. The application may combine any or all of these classes of work:- 89.1 Access and/or Carparking. 89.2 Site Civil Works. 89.3 Stormwater Drainage. 89.4 Frontage Works. 89.5 Sewer reticulation (including new mains, relocations, diversions, pump stations and rising mains). 89.7 Water reticulation. 89.8 Landscaping. 89.9 Erosion & Sediment Control 90. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and specifications for all engineering works that will become Council infrastructure, which shall be submitted in conjunction with an application for a Development Permit for Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any application for Operational Works. 91. Digital detailed designs including drawings, calculations, specifications and a schedule of works, shall be submitted with any application for a Development Permit for Operational Works in respect of roadworks and stormwater drainage works. The design shall be in accordance with Council’s Planning Scheme Policy PSP05 — Engineering Design Standards — Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all existing and proposed services required by the development shall be shown on the plans. 92. To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). 93. A construction management plan/strategy to ensure no damage occurs to Council services shall be prepared by a suitably qualified Registered Professional Engineer and submitted to Council in conjunction with any application for Operational Works. 94. Any damage caused to any public utility during the course of construction shall be repaired to Council's standards and at no cost to Council. 95. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council.
Page 15
96. 97. 98. The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shail be covered to prevent materials including dust being windblown from the vehicle. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design intent, and a Licensed Surveyor shail certify the cadastre and the location, level and type of all services and structures. All of which shall be submitted to Council for checking and for Council's records. The data must fully detail levels for all engineering works including but not limited to drainage structures, finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). Approval of works shall not be granted until all As Constructed information has been supplied and accepted by Council. Waste Management 99. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, must be submitted for the day-to-day operation of the development and approved by Council’s Health Section prior to issue of development permit for operational works. It is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9 explaining how to calculate waste quantities and design waste areas is available from Council and the web. The Plan shall include the following information: - 99.1 The types of waste that will be generated from the activities approved within the development. 99.2 Estimated volumes or tonnage of both recyclables and waste generated. 99.3 Methods to be used for dealing with garden waste. 99.4 Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling. 99.5 Description of procedures for getting all waste to the bins in the various storage locations and the transfer to the main storage area for later collection. 99.6 A description of the design details of waste storage and recycling areas including size, location, elevation and floor plan, methods of bin washing and system to prevent storm water getting into sewer via the bin wash. 99.7 A description of types and volume of waste storage containers to be used. 99.8 The waste and recycling storage area shall include the provision of containers for all waste and recycling materials including putrescible matter, non-recycling waste, paper/ cardboard, glass, aluminium/steel cans, waste oil, styrofoam boxes, etc, and bin washing facilities connected to sewer. 99.9 A detailed description of vehicular access to collect waste/recyclables. Access must allow vehicles to enter and leave the site in a forward direction. Turning circles are to be designed in accordance with AUSTROADS: design single unit truck/bus (12.5) template. Height clearances shall allow both front and rear loading of vehicles. 99.10 Collection details are required for approval. These are to show how collection will not be impeded by other service/delivery vehicles, how collection will be done when these other vehicles are occupying the loading bay area, how safety is provided when residents vehicles and the proposed bus are using this same area. 99.11 Refuse chutes must be provided in accordance with Council's Policy for “Refuse Chutes and Accessories in Multi Storey Buildings”.
Page 16
100. A Waste Management Plan (demolition and construction) shall be submitted prior to commencement of any demolition or construction works in accordance with Planning Scheme Policy PSP11 - Waste Management Plans (see table below). Waste storage areas are to provide for adequate separation of all reusable, recyclable and waste materials. These shall be located so that they are convenient and safe to use. (Refer to Council's Waste Management Code). The Plan shall contain the following information: 100.1 The site area for the storage and separation of waste is to be shown on the plan drawings accompanying the application. 100.2 A waste management table as indicated below is to be completed showing how waste material is to be segregated — recycled — reused or disposed. MATERIALS ON-SITE DESTINATION Re-use and Recycling Disposal Expected waste | Estimated | On-site Off-site *specify materials volume *specify proposed | ‘specify contractor and (m*) re-use of on-site | contractor and | landfill site or recycling recycling outlet other disposal methods site Excavation material Green waste Bricks Concrete Timber-please specify Plasterboard Metals - please specify Asbestos Other - please specify Note * if a demolition contractor is undertaking works, then the Waste Management table is to be completed by the demolition contractor. The purpose of the Waste Management Plan is to facilitate the segregation of waste for the effective reuse and recycling of such materials. Additionally Council rewards those who segregate waste by significantly reducing disposal fees at the landfill some items are free. Higher gate fees are charged for loads of mixed waste. Acoustic Amenity 101. Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool pumps etc) shall comply with the following requirements: The equipment shall be installed and located in a manner that prevents excessive noise in accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-spot fines) may apply for offences.
Page 17
402. 103. Noise emission from mechanical equipment shall comply with the following requirements: Air-conditioning and Refrigeration * 7am to 10pm: Maximum background + 5dB(A) e¢ 10pm to 7am: Maximum background + 3dB(A) Pumps * 7am to 7pm: Maximum background + 5dB(A) ¢ 7pm to 10pm: Maximum background + 3dB(A) ¢ 10pm to 7am: No audible noise. Written certification from a suitably qualified person shall be submitted confirming that the noise levels from all mechanical equipment comply with the levels detailed above when measured at either the residential boundary or outside the most exposed part of an affected building, whichever is the closest to the equipment. The certification is required immediately after installation of the equipment and prior to any occupation of the building, and in a format approved by Council. This assessment must take into account noise from any other fixed equipment on the property e.g. swimming pool pump, heating/cooling equipment, etc that may increase the overall noise level emitted. Kitchen Exhaust 404. Any commercial kitchen exhaust points must be located and operated in accordance with AS1668.2 “The use of ventilation and air conditioning in buildings — Ventilation design for indoor air contaminant control”, Section 5 — Mechanical Ventilation — Exhaust Systems, 5.10 Air Discharges. Trade Waste 105. The drainage system from all business that are likely to discharge trade waste must comply with Council's Trade Waste Policy and Sunshine Water's guidelines for accepting trade waste into the sewer. All appropriate trade waste permit and/or agreements must be applied for and issued prior to the discharge of any trade waste to the sewer. THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM CONDITIONS OF APPROVAL 1. The applicant is advised that development contributions and infrastructure charges applicable to this development approval have been based on the following Uses Class/ Uses and applicable quantities:- Existing Development Approved Development Existing Use Class / Existing Quantity Approved Use Class / Approved Quantity Use Use Detached House 1 , (Caretakers | Commercial Business | 4 99,,2 residence) Type 1 - Office Visitor 76 Retail Business Type 2 387m? Accommodation Type (consisting of 8 — Shop Saion 2 ; Caravan Park Cabins, 46 Powered | Entertainment & Dining Sites 22 Unpowered | Business Type 1 — | 306m” Sites) Food and Beverage Visitor Accommodation | 68 — Type 4 Conventional (Single Hostel Bed for tourist of overnight
Page 18
accommodation)
Visitor Accommodation
— Type 4 Conventional | 32
(1 bedroom unit)
Visitor Accommodation
— Type 4 Conventional | 41
{2 bedroom unit)
21
Visitor Accommodation
— Type 4 Conventional vege 2
3 bedroom unit ers
( ) Residence)
The applicant is informed that approval of this development application will
trigger an Infrastructure Charge in accordance with the Coastal Major Road
Network Infrastructure Charges Plan for the estimated amount of $350,055.00
and is subject to variations in the Consumer Price Index, All Groups Brisbane
from September 2009 until the date of payment. An Infrastructure Charge
Notice will be issued in accordance with Chapter 5 of the Integrated Planning
Act 1997.
The applicant is informed that payment via credit card transaction will not be an
acceptable method of payment for development contributions conditioned in
this permit or for infrastructure charge notices issued separately.
The applicant is advised that a Compliance Permit for all plumbing and
drainage works within the boundaries of the development site shall be obtained
from Council's Plumbing Services Section prior to obtaining a Development
Permit for Building Works.
Where any food premises is included in a development, the following is
required:
5.1. Plans and application is to be made to Council’s Environmental Health
Section for approval prior to any building approval, fitting out or use of
the premises.
5.2. A statement indicating the purpose of the food premises, type of food
sold, proposed menu and maximum number of patrons at any time, is to
accompany the application for plan approval.
5.3. Construction and use of the food premises should comply with Council's
Food Premises Policy and the Food Safety Standards. (Both available
from Council)
5.4. Toilets for customers and staff to be provided in accordance with
Building Code of Australia. Obtain advice from a building certifier on
numbers and standards, including disable access.
5.5. Plans and approval is required for any mechanical exhaust ventilation
system, which should comply with AS1668. A certificate from the
installer certifying the system complies with the Standard must be
obtained and lodged with Council prior to commencement of trade.
5.6. Any Licensable Food Business, as defined in Chapter 3 of the Food Act
2006, must obtain a Food License from Council, prior to use of those
premises.
Noise from building works associated with commercial and or industrial
development should comply with the following —
6.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
Page 19
6.2. All reasonable measures are taken to minimise noise emissions. 6.3. Not permitted on Sunday or public holidays. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement, concrete, builder's waste or rubbish should not be permitted to enter or be placed where it could reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot fines apply for such offences. The plans for the proposed building work have not been assessed for compliance with the requirements of the Building Code of Australia as they relate to people with disabilities. Your attention is drawn to the matter that either or both the Disability Discrimination Act 1992 (commonwealth) and the Anti-Discrimination Act 1991(Queensland) may impact on the proposed building work.
Page 20
COMPONENT (Refer to Noosa Plan | PROPOSAL for definitions) Site Area 23,1341m2 Site Cover (Refer to Noosa Plan for definition) Commercial Precinct = 1140m2 (4.93%) Visitor Accommodation Precinct = 4064m2 (17.57%) Total = 5204m2 (22.5)% GFA, comprising: Commercial Precinct = 1534m2 Visitor Accommodation Precinct = 7247m2 Total = 8781m2 Use Area Commercial Precinct - Office = 100m2 - Low Cost Budget Accommodation = 591m2 - Restaurant = 306m2 - Retail = 387m2 - Total = 1384m2 Visitor Accommodation Precinct = 6279.2m2 Total = 7663.2m2 No. of Dwellings 2 Buildings with 32 Shared Visitor Hostel Units (or 64 individual units) 30 Cabins (dwelling units) Building Height Commercial Precinct Visitor Accommodation Precinct 2 storeys and 8m plus undercroft car park 3 storeys (2 storeys plus undercroft car park) Car Parking 140 car spaces 8 motorcycle spaces 1 bus park MEDtA TION P S27 oT S26 8 Odea ees cae $24 Sr SS $2 SWC SS WS o— $20 S19 KS St 17 S16 S14 AK ~ es B. a a 2 a os 20, gengegspaneseoaagaoe Fy Trent --- SU BASEMENT AND GROUND LEVEL - VISITOR ACCOMMODATION PRECINCT BASEMENT LEVEL - COMMERCIAL PI essence of peregian beach SE hn 08 a _ 7 << Note All dimensions and areas are approximate only, end are subject to survey and Council approval, Dimensions have been rounded to the nearest 0.1 metros. The boundaries shown on this plan should not be used for final detaited engineers design AMENDMENTS ‘ By gee CLIENT SCANLON PROPERTY GROUP PROJECT ESSENCE OF PEREGIAN DAVID LOW WAY PEREGIAN SITE PLAN BASEMENT STE PLAN BASEMENT AST REG. AS SHOWN Plan Reference 20517_A-40a
Page 21
>
>
a
+
Suna
ain enero mel ded
200.
* RETAIL *
pop
]
|
oasis
z RESTAURANT
my goes gy ox 4 2x 4. fen
¢ ?
T T
PROPOSED PLAN - Ground Floor Level
Fira ua Get a REVS
4
t
MEoDtA TION
a:
LANDSCAPED BUFFER
oa
D
P LAN
g
5 SECURE CARPARKS 11
+ . g . vs
a -
g it g
3
3
5 = 5
g
? t
. PUBLIC CARPARKS 41 ce
MOTORBIKES 6
Loe pg
‘DNbRA TOAD Lb
‘ ED PLAN - Basement Floor Leva
/\
essence
of peregian beach
LY
(saat
cate peunsatee
ry]
Alldimensions and areas are
approximate only, and are subject to
survey and Council approval
Dimensions have been rounded to the
nesrest 0.1 metres
The boundaries shown on this plan
should not be used for final detaited
engineers design
AMENDMENTS
WS
CLIENT
SCANLON PROPERTY GROUP
PROJECT
ESSENCE OF PEREGIAN
DAVID LOW WAY
PEREGIAN
COMMERCIAL PRECINCT
FLOOR PLANS
20112009
COMMERCIAL PREQNCT
FLOOR PLANS
20517
AS SHOWN
Plan Reference
20517_A-41a
(
CONICS
Page 22
ME D
given exten
ALUMNA FRatED C
¢ ‘ ELEVATION - East
SHEN
| A T
l
A
RECEREO MASON
RENDERED MASONRY
FOCEREDUASENGY
VECREENS
|
ALAIN FRAMED GAZ NG.
O
N
on
ELEVATION - South
SACI iD
Sov0N EATTENS:
ee ten North
P LAN
ii
nl
ALUN
AFR
essence
of peregian beach
Se |
(care vrunsetir |
Fy
a)
CAS BRUNSELL AROHTECIS PTE UD,
et ae
a
Note
All dimensions and areas are
approximate only, and are subject to
survey and Council approval.
Dimensions have been rounded to the
nearest 0.1 metres.
The boundaries shown on this plan
should not be used for final detailed
\ engineers design. j
AMENDMENTS,
SS
( CLiENT
SCANLON PROPERTY GROUP
PROJECT
ESSENCE OF PEREGIAN
DAVID LOW WAY
PEREGIAN
COMMERCIAL PRECINCT
ELEVATIONS
Ove 20112003
Suresed
Compey CA
OhoNee — COMMERCIAL PREGNCT
ELEVATIONS
SLNSHNE COAS
20517
AS SHOWN
Pian Reference
20517_A-42a
_ EE
cCoONics -
CONICS (BRISBANE) PTY LTD
Page 23
essence of peregian beach Sov0h ENTTENS cate seunsetir ry FENCERED USERS Note Alldmensions and areas are approximate only, and are subject to suney and Council approval. Dimensions have been rounded to the nearest 0.1 metres. The boundaries shown on this plan should not be used for final detaited engineers design. AMENOMENTS Fu et TANI Rc TET eu 1s: TELNSUEEL CLIENT SCANLON PROPERTY GROUP FINAL FLOOR LEVEL TO BE PROJECT ESTABLISHED TO SUIT ESSENCE OF PEREGIAN ‘SITE DRAINAGE & DISABLED DAVID LOW WAY ACCESS REQUIREMENTS. PEREGIAN COMMERCIAL PRECINCT wary eee ELEVATION & SECTION ¢ ‘ TYPICAL SECTION - Buiding B 2 201172003 COMMERCIAL PREONCT ELEVATION & SECTION AS SHOWN Pian Reference 20517_A-43a conics p CONICS (ERSBANE) PTY LTD. AGN 61278
Page 24
- a A”
essence
fofeemgis
J mM A
BUT DING B BUILDING A
BUILDING A CABINS
No
( ‘i ‘
Tr GRO,
ESSENCE OF PEREGIAN
DAVID LOW WAY
PEREGIAN
BUILDING B BUNLDING A CABINS se
COMIC Ss Pp
cas
Page 25
A Sssence of peregian beach JM A | fap ee 7 7 ; [Par A rir IFLA 1 | sees . Trl ot | gees i rf ra cr ARCHITECTS H LL | i Ne LIL rl | LHI | QUEENSLAND PTY LTO | rt Pier Ly H 3 ! ollo OFO Clo \CCESS| eo | 1 mr] As” Bs D BED! | | BEO3 BED3 oD | ? slo H | a | OFO (_p | | , COPYRIGHT } . fi Hq DH | ©) Gi MO & aa ere Mn | | i a | 1 v al Lim | WT / ees, 7 H rt YA anoATECIS QLD PIT LIO ihe ad tohen Ube ACCESS Lr BED 2 BATH i | oO rT 3aTH |i eeD2 BED ee Hs Gor L ro Cl rt | 1 | he > Net 4 4 J i | cH F i 1 1 i a a a a FA gd ea TTT Vv Vv Vv Vv r f Hf i 5 m , CLIENT I TL) Jeet ] i j Oe. i | aie th SCANLON PROPERTY GROUP ‘I L dar | | I sh i we? Ye Of acne FONE ws || soe enh Sh Les STs foe = | Paar NL Near ee Lo TH f \ LT! ri T “| L_| 7 ESSENCE OF PEREGIAN Z eons oe, lL i LHI | ~~ DAVID LOW WAY i vi | 7 ——— | wir | oy | PEREGIAN i i | Ff : Le Bee | I D | HE | uit 6 1 TOURIST lO QO | lo TYPICAL PLAN | o}fo OPO BeDt BEDI BED P | I inal] Al ik a BED3 4 BEO3 Do i eee ome] A tal] BED3 = BEO3 D a [JO 0 oo Oo oO [Jo 0 oo [LIT TT] has | | | l | | | [| ml | | 1 7 ] | | L] | |] 0 r| cea Urs LA LELELA * Geer Cp : AS SHOWN “VW > Pian Reference 20517_A-11 conics P TYPICAL PLAN TOURIST ACCOMMODATION 4:400 WitetgtfH OU qT P REJsSwU DIG E D A P LA N S °
Page 26
essence of peregian beach A NS PUNS AND SFEDRIC SAT THERE N ARE THEA AMA ARCHITEGTS GAD PTY 1 MUST NOT EE USED, COPED CR REFRIC CED SLY CR MFART @THOUT THE AS TIEN CON OF THE COMPANY AMA ARCHNTECTS CLD PTY LTD Elevation AMENDMENTS () 280807 DEVELERVENTAREROWN, 21107 CEVELCeMeNT aren G CSEIC9 WITHOUTFFENLO CE OA CLIENT SCANLON PROPERTY GROUP PROJECT ESSENCE OF PEREGIAN DAVID LOW WAY PEREGIAN TOURIST ACCOMMODATION TYPICAL ELEVATIONS. S59v2009 Cea TOURIST ACCOMMODATION TYPICAL ELE! NS Bau AS SHOWN Pian Reference Typical Elevation 20517_A-12 conics W TH OU
Page 27
TH OU T P RE J U D
PLAN S
A
ESsence
of peregian beach
Pe eg
epeediyeatt alias
QUEENSLAND PTY LTO
U3ED, CORED CA REPROO.NED.
AT ATHOUT Tre WRITTEN
SSCNCF TRE COMEANY
WMA ARCHITECTS LD PTY UTD
( AMENDMENTS. '
OF TBC CEVELOFWENTAFFROVAL pa
2 2NN07 CEVELORMENTAFFROVALERI pa
o cS0309 wIMICUTRRENOITEDA po
_
CUENT ‘
SCANLON PROPERTY GROUP
PROJECT
ESSENCE OF PEREGIAN
DAVID LOW WAY
PEREGIAN
TOURIST
ACCOMMODATION
TYPICAL SECTIONS.
Lest )
2009
CBA
TOURIST ACCOMMODATION
TYPICAL SECTIONS
~AT
AS SHOW!
Page 28
S2
CESSIBLE CABIN GROUND FLOOR
AC
et
scale 1:100 o 1 2
3
a
4
ao
¢
CT ore
eee,
(Pag Ny iat '
emp! pa s2
H by ace
i
Ir
(.
UPPER FLOOR a
OF 1:00
a
|\|}=====----3
{H ==
Abbie | |
tH i \
es \ 1
QO. i
| Faasiee s2
MASTER §
ops [ peoroou Bes Lj
J
d ra
= _ 1
Sse == do
\ oO
o
LOFT 5
scale 1:100
O UT
——
lo
=
1
(@a\ SECTION
XT scale 15100
————
1K
TY
!
——
CULM
Oo
N
(eS | |
i Lee !
(a2) SECTION 2
QT wate 13100
C CE
D
(Oi) ELEVATION 1
XT scale 15100
‘
1
(3) ELEVATION 3
XT seate 1:10
AK
(10a ELEVATION 4
XT seate 13100
A
ESSENnce
of peregion beach
02 211107 CEVELDEMENTAFFROVALER pa
09 S03c9 WaTrioUT FI
Ice DA 2
————
CLIENT \
SCANLON PROPERTY GROUP
PROJECT
ESSENCE OF PEREGIAN
DAVID LOW WAY
PEREGIAN
BEACH SHACKS.
SINGLE BEACH SHACK
5092003,
CBA
BEACH SHACKS
SINGLE BEACH SHACK
20517
AS SHOW
Pian Ref
20517_A-14
CONIES p
Page 29
~
9 ; 8 ss
b b b
I \ I
| I I
Mena Lr essence
er [P}-— 9 fr BS \\ ry p
i eal Hy ! t | ' [H ate of peregian beach
cH ene ! ' \ tt hh _————
th ' 1 Uf _! == J y) A\
A " Th rT, | MA
| od 1 ter u 83.02 $3.02 ARCHITEC T'S
s2 | 4 s2 sal if? ap s2 eB wsunstet || BiSematausl eye ire
444 fo =| 8 ee rt — FRE] |ecorooy |
t i t it ny
rer Ewe yy Lif =
i a ae - a ,
\ 7 s { !
r Gen ou | LI]
! =—
HH 1
1 | \ Tetbt (©) copyright
rH 1
Hy 1} ! 2 .
FH |
| Mi ‘ricnen A | ' $2-D2 S2-D2
Qbet © |B — —
LJ 1 Uli
| |
\ J 7
GROUND FLOOR UPPER FLOOR, i“ LOFT ~ a am “
¢ : yen 4100 q ‘scale 1:100 = 100seale 1: a re tt
n ”o ob ,
| rll
| =A CLIENT
| /| SCANLON PROPERTY GROUP
| | oi PROJECT
her (iB ot ! i | / | ESSENCE OF PEREGIAN
c ; aise Srp RO ee TOIT DAVID LOW WAY
PEREGIAN
AAS 1:400 AAS 4:100 AAS 1:100
BEACH SHACKS,
DOUBLE BEACH SHACK
Ke
Soe
CBA
BEA
SHACKS
DOUBLE BEACH SHACK
20517
AS SHOW
Plan Reference
20517_A-15
a
1 T H O UT PREJUDICE D A P LAN S g
Page 30
W CABINS T H O U T }) $z/#0,00) CABINS sz +7570 3712.00) ~“8s0mm step BUILDING B EXISTING BUILDING 37 +18.500 EE cry I BUILDING A COMMERCIAL sz+7.670 BASEMENT COMMERCIAL BUILDING P RE J U D C E A PLAN §S DAVID LOW WAY A essence of peregian beach JM A ( AMENDMENTS. ee (cuenn SCANLON PROPERTY GROUP PROJECT ESSENCE OF PEREGIAN DAVID LOW WAY PEREGIAN SITE PLANS SECTIONS 1-4 , CBA SITE PLANS SECTIONS 14 0517 AS SHOW Pian Reference 20517_A-05 —— conics 4 CORES (BRSBANE PTY LID
Page 31
TRPPey ne WEST ELEVATION SITEPLANS Ss 4:280 (3 \ NORTH ELEVATION SITE (aor site Plans 1:260 = (4 SOUTH ELEVATION aor) SITE PLANS 1:260 WttTtfH OU T C E D A A ——— OSscnice of peregian beach AMENOMENTS. \ eee (cuent \ SCANLON PROPERTY GROUP PROJECT ESSENCE OF PEREGIAN DAVID LOW WAY PEREGIAN SITE PLANS STREET ELEVATION ———— | J) 500000 eA SITE PLANS ‘STREET ELEVATION a 7 AS SHOW! Pian Reference 20517_A-07 canics b (BROSEANE) PTY LTD
Page 32
oooo Oo oO@8oO0 oooos
Enquices Ranald Scott
Zelephone (07) 3224 Sot come :
fourreferencs Applic. Nos. MCU 2007/1259
Ourteference BNBS6PO Vol 14 AMA 7551 Environmental Protection Agency
Incorporating tha
Queensland Parks and Wildlife Service
27 July 2007
Scanlon Property Group 07
C/. PMM Group Ply Ltd 74 ae 20
PO Box 1559 Vo SoS ott
FORTITUDE VALLBY QLD 4006 eo Same
Dear Sir/Madam
‘The Environmental Protection Agency, acting as a concurrence agency under the Integrated
Planning Act 1997 fox your application, advises that the correspondence indicated is attached:
Information request (C-1)
Notification of information request (C- 2)
Notification of receipt of applicant’s response to information request (C-3)
Extension of information request/assessment period (C-4) .
Request for applicant’s written agreement to extension of information
yequest/assessment period (C-5)
. Conourrence agency response cover sheet (C-6) . ’
Concurrence agency response about environmentally relevant aotivities (C6 BRA)
Concurrence agency -response about contaminated land (C-6 CLM)
Request for applicant's written acceptance of concurrence agency xesporise after
assessinent period expires (C-7)
Amended concurrence agency response about environmentally relevant activities
(C-7 BRA). |
Amended concurrence agency response about contaminated land (C-7 CLM)
‘Notification of decision in relation to a request to change or cancel a condition (C-8)
Notification of proposal to change or cancel a condition (C-9)
Notification of decision in relation to a proposal to charige or cancel-a ‘condition (C-10)
Application information:
Concurrence agency office: Contaminated Land
Responsible officer: - Ranald Seott
Pege | of 2 46" Floor, 388 Edward Stront, Brisbane
Queensland 4000 Australia
GPO Box 2771 Brisbane
Queenstand 400% Australla
‘Telephone: (07) 3224 S644
Facstmiles (07) 3247 3278
Website: vawveny.qid.gov.au
of 100% cecyeled poper . ABN 87 221 158 786
Page 33
a: me Postal address; - PO Box 2771, BRISBANE QLD 4001 Telephone; 3224 5644 ” Kax: 3247 3278 E-mail: [email protected] EPA no.! AMA 7550 Application no.: ” 2007/1259 Property Description: Lotno:8 - Registered Plan no.: RP9315 -Lotno: 9 —_ Registered Plan. no.: RE9315 Lotno.: 10° Registered Plan no.: RP9315 Lotno: 76 Registered Plan no.: MCH2969 Property Location: 215, 215A, 217 & 219 David Low Way, PEREGIAN BEACH Operations Manager Waste & Contaminated Land Unit Co: The Chief Exeoutive Officer Noosa Council PO Box 141° TEWANTIN QLD 4565 ‘Attention: Kerri Coyle IDAS covering letter (concurrence agency) Page 2 of 2 wt ree ‘
Page 34
eS , ~ s IDAS C-6-
Concurrence ageney response
integrated Planning Act 1997 53.3.16 and 3.3.18
Applicant: Scanlon Property Group
. C/- PMM Group Pty Lid A:
PO Box 1559
FORTITUDE VALLEY QLD 4006 . RECEIV ED
Application no. 2007/1259 - 4 AUG 2007
Date received by EPA: (7 July 2007 " NOOSA
Jurisdiction: Environmental Protection Act 1994. “\, Seid GQUNGHL
Role: . Concurrence ;
Description: Material Change of Use
215, 215A, 217 & 219 David Low Way; PEREGIAN
Lotino.;8 ‘Registered Plan no.: RP9315
Lot no. 9 Registered Plan no.: RP9315
Lotno.: 10 Registered Plan no: KP9315
Lotno.: 76 Registered Plan no.: MCH2969
1 Type of development
Material change of use Lo
“oO Recorifiguration of a Lot : '
where; .
0 the existing use of the land is, or if the land is vacant land with no existing use the most
recent use of the land was, for a notifiable activity under the Environmental Protection Act
1994, ° , : , ‘
a the proposed use of the Jand is for child care, educational, recreational, residential or
similar-purposes and the existing use of the land is, or if the land is vacant land with no
=
existing use the most recent use of the land was, for an industrial activity,
Oo the land is on the Environmental Management Register or Contaminated Land Register
under the Zaviroumental Protection Act 1994.
oO the land is wholly or partly within an area for which an Area Management Advice for -
industriat activity or natural mineralisation has been issued and the proposed use of the-
land is for child care, educational, recreational, residential or similar purposes.
the land is wholly or’partly in an area-for which an Area Management Advice for
unexploded ordnance (UXO) has been issued, .
2 Response to development application
The Environmental Protection Agency (BPA), acting as a concurrence agency under the Integrated
Planning Act 1997, provides the following response 6 the application detailed above -
conditions must attdch to any approval of the development
"any approval must be for part only of the development
any approval must be a preliminary approval only
there are no concurrence agency requirements -
the application must be refused
OOCOOR
3 Reasons for including condition(s) or refusal . .
The site (the subject lot/s) is part of an area of land within which the Department of Defence’:
ox efence) has assessed a ‘substantial’ risk of residual UXO contamination exists, Visit the Defence
ve http: www.defence.gov.aufuxo for details.
pe EVE
5%.
“ . .
) VER2
aa .
3
Si
Page 35
IDAS C-6 Defence advises that development or land use rezoning proposals for land within a ‘substantial? zone should only proceed following the conduct of UXO investigation and clearance activities. Defence maintains a list of commercial UXO investigation and remedial search contractors that it accredits to catry out this work, Defence also recommends that ownérs or occupiers of potentially affected land and workers and contractors employed on the land need to be aware of the procedure ifa suspect object is found. As the EPA has no record of the site being further investigated or remediated, itis considered that there remains a possibility o of UXO being found on it. . 4 , Conditions The following concurrence agency conditions are to be attached to any approval: 41 Prior to the commencement of any excavation, earthworks or soil disturbance related to this development, that part of the site to be so worked is to be subjected to investigation and, where necessary, appropriate remedial action. 4.2 Any pérson employed to work on any part of the site where Condition 4.1 has not been satisfied is to be forewarned in writing by the applicant, This warning is to explain that information available to the BPA indicates a potential for residual UXO oxists on the.site and work should proceed with due oaution. It is to state the procedure to be followed by any person finding an abject suspected of being explosive ordnance or component thereof Do not disturb the object, Take action, where appropriate, to prevent it being disturbed by another person. Note its approximate dimensions and general appearance, Note the route to its location. Advise the Police as soon as possible. eoce?%oe%°o 4.3 — Following investigation and any remedial action taken to satisfy Condition 4,1 above, the applicant is to submit a report, prepared in accordance with current guidelines, to the EPA for assessment. The EPA is to subsequently advise the Noosa Council and the applicant of its assessment in regard to Condition 4,1 being satisfied. 44 No gravel, rock, sand or soil j is to be removed from thie site without written EPA approval. 45 The applicant is to advise the owner and any occupier of the site of the above responsibilities. - 5 Additional comments or advice . Applicants may contact the EPA’s Contaminated Land Unit on (07) 3224 5644 or visit the Defence website hitp//www.defonce.gov.au/uxo/ for the details of current UXO investigation and remedial seatch contractors. The BPA accepts reports based on investigative and remedial work carried out by these contractors. Investigation and remedial action ta satisfy Condition 4.1 typically involves sampling/search programs with detection equipment unless the use of such equipment is: a VER 2
Page 36
IDAS.C-6 e considered unwarranted by a UXO contractor due to the extent of any prior excavation or ” earthworks or, conversely, of any filling proposed as part of the development program; or ¢ prevented or made impracticable by the presence of a structure, stockpile, natural barrier or mefal waste. In the latter case, alternative action may be appropriate to minimise the risk in the first instance, For example, where the risk of exposure to any UXO that may exist is reduced by the presence ofa structure or natural barrier, issuance of the standard UXO waming (see Condition 4.2) may suffice while the structure, stockpile or barrier remains in place, Where a stricture is to be removed or reduced as part of the development prograin, protective precautions, commensurate with any greater risk to which workers might then be exposed, may need to be considered. Progressive assessment will be necessary where such circumstances exist. Unless, at the completion of preliminary works, there is evidence then available to the UXO contractor that any residual xisk is negligible, the use of detection equipment will typically be required to confirm the site’s status, Where investigation, along with any subsequent remedial action and assessmeni, is to be implemented by stages to satisfy Condition 4.1 and 4,3, a preliminary investigation report should be submitted by the applicant to the EPA along with a management plan for the proposed work. Staged investigation/remediation is most likely to be applicable where development of smaller, built-on lots .(which oan present ciroumstances such as those discussed above) or broadheotare sites is proposed. In such cases, the EPA’s assessment of the report and advice to Council in regard to approval ofthe development will be dependent on agreement with the management plan. . Where Condition 4.1 is to be satisfied by a wholo lot or broadhectare development stage being subjected to investigation and any necessary remedial action, the BRA, based on the subsequent investigation/remediation report’s findings and reéommendation/s, may reassess the lot, or that portion comprising the development stage, as being remediated dr not needing remediation, and advise the applicant and Council accordingly. Otherwise, any balance of land that has not been further investigated will retain the risk assessment made by Defence. This is unless evidence obtained from tho investigated pari/s can be used to refute Defenco’s assessment in regard to all or part of the balance. In the latter case, the EPA may reassess all of the balance or the applicable partis as being unaffected by UXO, 6 Additional information This concurrence response applies only to contaminated land issues and does not remove the need to obtain any further approval for this development which may be required by this or other legislation, , State and/or Commonwealth, Applicants are advised to check with all relevant statutory authorities, Applicants should also comply with all relevant legislation. The EPA has not provided a notification to native title parties for this application, The State’s Native Title Work Procedures indicate that the responsibility for assessment of native title issues for at IDAS application rests with the Assessment Manager. It is recommended that the Assessment Manager determines whether native title notification is required for this application. *End of response* WAS C-6 CLM VER 2
Used in these records
Judgement.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.