Council archive · source document
Judgement.pdf [As Published] · 132007.1259
IDAS.C-6 e considered unwarranted by a UXO contractor due to the extent of any prior excavation or ” earthworks or, conversely, of any filling proposed as part of the development program; or ¢ prevented or made impracticable by the presence of a structure, stockpile, natural barrier or mefal waste. In the latter case, alternative action may be appropriate to minimise the risk in the first instance, For example, where the risk of exposure to any UXO that may exist is reduced by the presence ofa structure or natural barrier, issuance of the standard UXO waming (see Condition 4.2) may suffice while the structure, stockpile or barrier remains in place, Where a stricture is to be removed or reduced as part of the development prograin, protective precautions, commensurate with any greater risk to which workers might then be exposed, may need to be considered. Progressive assessment will be necessary where such circumstances exist. Unless, at the completion of preliminary works, there is evidence then available to the UXO contractor that any residual xisk is negligible, the use of detection equipment will typically be required to confirm the site’s status, Where investigation, along with any subsequent remedial action and assessmeni, is to be implemented by stages to satisfy Condition 4.1 and 4,3, a preliminary investigation report should be submitted by the applicant to the EPA along with a management plan for the proposed work. Staged investigation/remediation is most likely to be applicable where development of smaller, built-on lots .(which oan present ciroumstances such as those discussed above) or broadheotare sites is proposed. In such cases, the EPA’s assessment of the report and advice to Council in regard to approval ofthe development will be dependent on agreement with the management plan. . Where Condition 4.1 is to be satisfied by a wholo lot or broadhectare development stage being subjected to investigation and any necessary remedial action, the BRA, based on the subsequent investigation/remediation report’s findings and reéommendation/s, may reassess the lot, or that portion comprising the development stage, as being remediated dr not needing remediation, and advise the applicant and Council accordingly. Otherwise, any balance of land that has not been further investigated will retain the risk assessment made by Defence. This is unless evidence obtained from tho investigated pari/s can be used to refute Defenco’s assessment in regard to all or part of the balance. In the latter case, the EPA may reassess all of the balance or the applicable partis as being unaffected by UXO, 6 Additional information This concurrence response applies only to contaminated land issues and does not remove the need to obtain any further approval for this development which may be required by this or other legislation, , State and/or Commonwealth, Applicants are advised to check with all relevant statutory authorities, Applicants should also comply with all relevant legislation. The EPA has not provided a notification to native title parties for this application, The State’s Native Title Work Procedures indicate that the responsibility for assessment of native title issues for at IDAS application rests with the Assessment Manager. It is recommended that the Assessment Manager determines whether native title notification is required for this application. *End of response* WAS C-6 CLM VER 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Judgement.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.