005. Lake MacDonald Drive Cooroy - SWMS
The original of this document is very large (11.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Lake MacDonald Drive Cooroy Lake MacDonald Drive Cooroy Civil Construction | SWMS Civil Construction | SWMS CONTENTS PRINCIPLES OF SAFE SITE WORKS 3 PROCEDURE 4 RESPONSIBILITIES 4 Project Manager Responsibilities: 4 Foreman Responsibilities: 4 Workers Responsibilities: 4 Environmental Responsibilities 5 Risk Assessment 8 CONTROL MEASURES 9 Prerequisites And General Works 10 Site Establishment & Survey 12 Clearing And Grubbing 13 Manual Handling 14 Electrical Safety Including Tag And Lockout 15 Hazardous Chemicals 16 Handling Gas Cylinders 17 Refuelling 19 Mobile Plant 21 Transporting / Unloading And Loading Plant 23 Unloading And Loading – Materials 25 Maintenance Of Plant 26 Working Near Overhead Power 28 Work Near Underground Services 30 Trenching And Excavating 32 Diagram 7 – Zone Of Influence 33 Diagram 8 – Trench Box Set Up 33 Installation Of Trench Shields And Plates 36 Lifting 37 Lifting 38 Working Adjacent To A Road 39 Working Adjacent To Water 40 Hot Works 42 Working At Heights – Above 2m 43 Confined Space 45 Pit Construction And Concreting 47 Recovery Of Bogged Vehicles 53 Demolition 54 Asbestos Removal 55 Quick Cut Saws & Chainsaws 56 Quick Cut Saws & Chainsaws 57 Angle Grinders 58 Grit Sandblasting 59 Welding 60 High Pressure Water Jetting / Cleaning 62 Other Activity: 63 WORK SITE DETAILS 65 PRINCIPLES OF SAFE SITE WORKS SWMS Must be completed prior to the commencement of any site activities by all involved in undertaking the work, and shall be reviewed throughout the work day and/or duration of the work activity to ensure it is referenced and amended as required Identify the licences, tickets, permits, competencies and authorisations required to complete the work activity PPE Ensure all identified PPE is available and being worn on site prior to works commencing PPE is managed in accordance with the PPE Procedure_IMS-02-48 CONFINED SPACES A Confined Space Entry Permit IMS-05-05 must be issued with authorisation by a responsible person(s), who have been trained and assessed in confined space entry before any confined space activity can commence REFUELLING PTA or Take 5 IMS-05-51 completed before commencement of task Equipment to be turned off, shut down and allowed 15 min to cool down Ensure the correct refuelling methods are used, 5L anti-spill container for small plant and equipment WORK AT HEIGHTS Where there is a risk of falling from a height of 2metres or more, will only proceed when a fixed platform or fall arrest system is in place or alternative approved system in line with the Working at heights procedure IMS-02-21 FIT FOR WORK All employees must be medically fit to attend the workplace and not be impaired by the effects of alcohol, prescription or other drugs, or fatigue VEHICLES, MOBILE PLANT & EQUIPMENT All operators of a vehicle or plant and equipment must be appropriately licensed or assessed for competency. All operators are to abide by speed limits, road rules, weather conditions and signage, as well as to adhere to the conditions of the license Work that involves a man-made or machine cut, cavity, trench or depression in the earth’s surface formed by earth removal will only proceed when all underground hazards (i.e. pipelines, electrical/communication cables) have been identified, physically located and where required, isolated VMP’ Vehicle management plan must be communicated, current and implemented as per Vehicle Management Plan Procedure IMS-02-30 Where applicable all rigging/dogging of loads is to be carried out by a competent person(s). All lifting equipment shall be in current test date and operational. All loads must be controlled, secured or tied down according to Procedures TRAFFIC MOVEMENT & CONTROL Implement and monitor a traffic management plan where there is risk of interaction between the public and work zones, ensuring the plan has been communicated to all workers onsite QUICK CUT SAW All workers must be trained and completed and only operate the Quick Cut Saws in accordance with the Quick Cut Saw Procedure IMS-02-27 EXCAVATION Any excavation that requires changing of the existing surface or excavation below the existing surface requires an approved excavation permit IMS-05-17 All excavation works to be conducted in line with the excavation procedure IMS-02-05 PROCEDURE In developing a Safe Work Method Statement (SWMS), consideration must be given to any previously developed site-specific SWMS and related information. Review the tasks/hazards and control measures. Additional high-risk tasks or hazards not listed in the SWMS, require a Risk Assessment IMS-05-46 to be completed. All control measures outlined in this SWMS must be referred to and followed at all times. The appropriate Procedures must be followed when performing the relevant tasks. Where the Procedures are referred to in this SWMS, this will form part of the SWMS work methodology. This SWMS cannot be used onsite unless the workplace and task details are recorded in Section D. All workers must Sign the acknowledgment and agreement of the SWMS in Section D. Review SWMS: Foreman and workers ensure that the effectiveness of the control measures is reviewed during the next daily pre-start, tool box meeting and/or if worksite conditions have changed Workers may review the SWMS at any time during the shift and make changes where control measures are not deemed adequate or where reference is required The foreman must instruct the workers that any SWMS reviews and comments are to be returned to the foreman for him to review, communicate and file. Where the review reveals the SWMS remain suitable for use; there will be NO need to develop another, however the review must be recorded in section D and in the Sites Daily Prestart. RESPONSIBILITIES Project Manager Responsibilities: Ensure the foreman is aware of any site-specific hazards & site rules implemented Ensure that all known hazards are included when developing the SWMS for the site or individual work areas. Instruct the foreman to ensure that this site and/or area specific SWMS are reviewed, developed in consultation with the workers and signed before any work commences. Foreman Responsibilities: Review and communicate site specific hazards and control measures outlined in the SWMS. Ensure that the appropriate control measures have been selected and that workers are aware that the control measures selected are mandatory. Complete a Risk assessment for any high-risk task or additional activity that is not listed in the SWMS Ensure Section D has been filled out correctly and that a SWMS is compiled for each area. Ensure all workers have been shown the SWMS and sign acknowledgement in Section D. Monitor the effectiveness of the control measures outlined in this SWMS during the work activities. If they are proving inadequate or not being adhered to, stop the work and install additional controls before restarting the activities. Record any alterations in the SWMS. Ensure workers follow the appropriate Procedures when performing the selected activities. Workers Responsibilities: Follow the SWMS and appropriate Procedures when performing tasks. Stop work and notify the foreman, if you believe the control measures outlined in this document, are no longer adequate. Environmental Responsibilities Introduction to construction site erosion and sediment control The objective; To take all reasonable and practicable measures to minimise short and long-term soil erosion and the adverse effects of sediment transport In this context the terms: ‘reasonable’ means an action based on sound judgement and affordable cost; ‘practicable’ means an action capable of being put into practice with the available means or with reason or prudence. The first rule of ESC The first thing to acknowledge with the Erosion and Sediment Control profession is that there is an exception to almost every rule and recommendation. The fact that a control measure is observed to work well in one location does not mean that it will work well in another location. Similarly, the fact that a control measure fails in one region does not mean that the technique will not be useful within another region. Environmental Duty The environmental Duty applies to all persons and activities on a construction site. Such an Environmental Duty may be described in general terms as: To take all reasonable and practical measures to prevent or at least minimise environmental harm. Application of ‘Common Sense’ Erosion and sediment control practices must represent an appropriate balance between the application of the ideal design philosophy and the application of common sense. No rule or recommendation should be allowed to over rule the application of a unique, site specific solution where such a solution can be demonstrated to satisfy the principle objective and the specified performance standard. Ten key Principles to best practice ESC Key Principle 1 Appropriately integrate the development into the site. Best Practice development planning involves the determination of the appropriate use for a given site and how best to accommodate that land use within a development layout. To achieve this, it is essential to investigate the site conditions including the soil, water, vegetation and topographic features of the property. Key Principle 2 Integrate erosion and sediment control issues into site and construction planning. During the planning of a building or construction project, consideration must be given to how the site layout and construction process can best achieve the principal environmental objective of taking all reasonable and practicable measures to prevent or minimise environmental harm. Key Principle 3 Develop effective and flexible erosion and sediment control plans based on the anticipated soil, weather and construction conditions. Erosion and Sediment Control Plans need to walk a fine line between being formal plans that site operators must follow, and being flexible plans that still allow site personnel to use their ‘common sense’ to: Adjust to changing site conditions Focus on the intent of technical notes rather than their literal meaning Key Principle 4 Minimise the extent and duration of soil disturbance This principle has many benefits, including; Reduced soil erosion Reduced release of fine colloidal soil particles that cause turbit runoff Promotion of the rapid stabilisation and revegetation of soil disturbances Key Principle 5 Control Water Movement through the site The proper management of stormwater runoff during the construction phase is critical to the implementation of effective erosion and sediment control. The importance of stormwater management generally increases with increasing rainfall intensity. This means drainage control becomes increasingly important the closer you get to northern Australia. Key Principle 6 Minimise Soil Erosion Soil erosion is the process through which the effects of wind, water or physical action, displace soil particles causing them to be transported. The Main factors affecting soil scour are rainfall erosivity, soil erodibility, slope length, slope steepness, soil cover and the surface flow conditions (i.e.: flow type, velocity, duration and frequency) Key Principle 7 Promptly Stabilise disturbed areas. A healthy and continuous vegetative cover is one of the most effective forms of erosion control. Most importantly, vegetation protects the solid against raindrop impact erosion. Vegetation also binds the underlying soil to improve its structural strength, improves soil’s infiltration capacity and increases evaporation thereby decreasing overall stormwater runoff. Key Principle 8 Maximise sediment retention on the site It is usually impractical to prevent all soil erosion on construction sites; thus, some degree of sediment control is always required. The primary purpose of most sediment control measures is to trap the coarser sediment fraction. Key Principle 9 Maintain all ESC measures in proper working order at all times. All ESC measures must be maintained in proper working order at all times until their function is no longer required. To assist in achieving this requirement, technical notes and/or construction specification attached to the Erosion Sediment Control Plan (ESCVP) must specify the maintenance requirements of all sediment traps. Key Principle 10 Monitor the site and adjust ESC practices to maintain the required performance standard. Erosion and Sediment Control Plans (ESCPs) are living documents that can and should be modified as site conditions change, or if the adopted measures fail to achieve the required treatment standard. If a site inspection detects a failure in the adopted ESC measures, then the source of this failure must be investigated and corrected. Risk Assessment Risk Assessments should take into consideration - likelihood and consequences of injury, illness or incident occurring & available information on hazard including any records of incidents, illness and disease. Likelihood of event occurring Incident Classification Rare Unlikely Possible Likely Almost Certain One or more fatalities, traumatic or severe disabling injury, damage / theft more than $1,000,000. *A Notifiable Incident Consequence of the event occurring Catastrophic High 15 Extreme 19 Extreme 22 Extreme 24 Extreme 25 Lost time injury (LTI), damage / theft less than $1,000,000 but more than $100,000. * A Notifiable Incident Major High 10 High 14 Extreme 18 Extreme 21 Extreme 23 Medical treatment required (MTI), damage / theft less than $100,000 but more than $10,000 Moderate Medium 6 Medium 9 High 13 High 17 Extreme 20 First aid treatment required (FAI), damage / theft less than $10,000 but more than $1,000 Minor Low 3 Low 5 Medium 8 High 12 High 16 A near miss, no injuries, damage / theft less than $1000 Insignificant Low 1 Low 2 Low 4 Medium 7 High 11 Risk Rating Procedure Following Risk Assessment Control Application Extreme 18 - 25 Activity must not commence. Must eliminate hazard or introduce further controls to further reduce the risk. Any hazard assessed presenting extreme risk level will only be allowed to be controlled using elimination and or engineering controls as the primary source of controls. High 10 - 17 Activity must not commence without Compliance Advisor or higher approval and appropriate supervision by Project Manager or Foreman. Implement strict control measures to further reduce risk. Any hazard assessed as presenting high or medium risk level will only be allowed to be controlled using a combination of at least one engineering control and one lower level controls as appropriate. Medium 6 - 9 Project Manager and Foreman must determine appropriate level of supervision required. Implement strict control measures to further reduce risk. Any hazard assessed as presenting high or medium risk level will only be allowed to be controlled using a combination of at least one engineering control and one lower level controls as appropriate. Low 1 - 5 Monitor, manage and carry out activity in accordance with identified controls. Any hazard assessed as presenting a low risk level will be permitted to be controlled using a combination of controls as appropriate, more than one lower level control must be applied if elimination and or engineering controls are not practicable. Hierarchy Controls Examples Eliminate Can we eliminate or remove the hazard completely Substitute Can we substitute the hazard with something else less dangerous Engineer / Isolate Can we re-design or isolate the hazard completely Administration / Training What controls can we put in place, e.g. training, job rotation, supervision Personal Protective Equipment What personal protective equipment is required to undertake this activity Civil Construction | SWMS CONTROL MEASURES Civil Construction | SWMS CONTROL MEASURES PREREQUISITES and GENERAL WORKS Hazard / Risk Control Measures HAZARDS Lack of awareness of hazards / works onsite Unable to provide Suitable Supervision and monitoring Lack of understanding or compliance of required controls and procedures No record of persons being onsite Lack of awareness of Specific Emergency Procedures and Assembly Points Operators Not Competent to operate Plant Machine and Appropriate Fittings not functioning correctly Tools not fit for use Slips, Trips and Falls Failure to follow site rules Failure to adhere to speed limits and haul road requirements Lack of understanding Traffic Flow Failure to implement Positive Communication Operators Not Competent Failure to follow site rules Failure to adhere to speed limits and haul road requirements Collision of Plant / Vehicles Slips, Trips and Falls Failure to implement a site designated laydown area Sediment builds up in storm water lines Sediment laden water leaving site CONSEQUENCES Persons at risk or not accounted for in the event of an emergency General injuries, Serious Injury or Death Plant Damage Strains, Sprains Hand Injuries, Head Injuries, Eye Injuries, Cuts and abrasions Dehydration and sunburn Crush Injuries Drowning Operator trapped in Plant Environmental Damage All persons entering site (workers, subcontractors, delivery drivers etc) must attend the site office upon arrival and complete the site-specific induction, in accordance with the Induction procedure IMS 02-39 Pre-start / “Kick Off” meeting conducted by foreman to ensure workers are fully aware of the scope of works. All workers must attend the site’s daily pre-start / “kick off” meeting Mandatory PPE requirements to be worn onsite at all times– Steel cap boots, Long pants, long sleeve shirt and hi-vis vest, hard hat, gloves, safety glasses. Respiratory Devices must be fit tested to each individual, if undertaking and works on silica containing materials such as concrete and concrete products, stone and composite-stone benchtops, fibre-cement sheeting, bricks, blocks, tiles and pavers, bagged materials such as cement, tile adhesive and mortar. Know and understand the sites emergency procedure and assembly points and available first aid and emergency equipment. Relevant persons should be trained in emergency rescue procedures and the use of rescue equipment and ensure that an appropriately stocked first aid kit is available on site. All plant /applicable trucks (watercarts, crane trucks etc) operators must undergo a Verification of Competency test prior to operating on Shadforth Sites. Ensure Verification of Competencies are completed for all operators of Plant, in accordance with VOC Procedure IMS-02-20 Operators must undertake a pre-start on the plant being operated Tools/equipment is inspected to ensure they are fit for purpose Ensure that all site personnel are aware of the hazards, risks and control measures specific to the work area. - high-risk activity procedures and SWMS are reviewed, followed and the required permits are in place. SWMS must be signed off by all workers prior to commencing any high risk works. Ensure all site rules, including site signage and safety precautions are adhered to at all times Understand and adhere to, the sites Vehicle Management Plan (VMP). Ensure the VMP is current and up to date and is communicated to site personnel. Train and supervise all site personnel to ensure they can undertake the jobs competently, consistently and safely. All training undertaken is to be documented and should include names of participants, the training content, who conducted the training and when it was conducted. Train all relevant site personnel in emergency rescue procedures and the use of rescue equipment and ensure that an appropriately stocked first aid kit is available on site. Ensure you take care when walking around site, watch your step and try not to walk through muddy slippery areas that increase the risk of slipping over. Consultation regarding both the site and job/tasks conditions, hazards and required controls and responsibilities. Familiarise yourself with the construction traffic in your area and maintain positive communication with operators and other workers via UHF (designated channels only) or other prearranged techniques such as hand signals. Site is set up as per Vehicle Management Plan at all times, with visible signage and road markings - that give clear instructions for vehicles routes and required speed limits. Speed limits must be adhered to at all times. Ensure site compound is an adequate size, flat, free draining, and set up as per the site’s vehicle management plan Edge protection windrows placed on haul route edges, where there is potential for mobile plant to drive off or roll over an edge. Windrows should be at least half the height of the diameter of the largest vehicles tyre that operate in that area and are constructed so that they are as vertical as possible Risk assess the area for tripping hazards, where required move them or change the area you will be walking ensuring that you will not be walking on or over any area that may cause you to slip trip or fall Supervisor to monitor all plant and haul road operation. Unsafe operation is to be stopped immediately and appropriate action taken to prevent recurrence. Always vehicles /plant must have park brake applied prior to exiting and where required, chock wheels and drums. All barricade must be installed correctly without sagging or gaps and star picket must be installed using star picket driver with star pickets driven into ground. Ensure the location of underground services is known and pickets are not driven into ground in this area. Place picket in desired location if possible, place in area with soft ground. Slide driver over the picket. If the driver is lifted above shoulder height care should be taken to maintain control of the driver. Lean picket over to make it easier if needed. Ensure picket is then vertical for driving. Star Pickets must be capped. Person’s onsite, should drink plenty of water and apply sun cream regularly. Stormwater drains and inlets and outlets must be protected hydro carbons and sediment laden water. R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 SITE ESTABLISHMENT & SURVEY Hazard / Risk Control Measures HAZARDS Site not established as identified No planning for the movement of vehicles and plant around site Overhead services are struck – lack of signage Hazards not communicated Dilapidation report not complete Complaints from persons who are affected by works. Other surrounding structures not assessed Damage caused from delivery vehicles and other heavy vehicles. Slip trip or falls UHF radios are affected by hills - Not enough UHF radios for all on the ground staff Poor, no or incorrect signage displayed. Workers entering work zone Site not secured Services not positively identified Pumps and generators leak fuels and oils into natural waterways. CONSEQUENCES serious injury or death serious sprain strain or break Service Strikes Environmental Harm and Damage – waterways, flora and fauna Establish site in accordance with the project prestart and the Vehicle Management Plan Identify overhead power or hazards in the work zone. Communicate with stakeholders and the public where access may interfere with or impact others. (outlined in the prestart minutes) Identify and assess any existing structures that may be impacted by your works i.e. buildings, footpaths, manholes etc. Site sheds, containers and similar must be installed in accordance with “working over 2m”, “Electrical Safety” & “Lifting” sections of this SWMS where lifting, electrical works and working at heights are involved. Ensure steps into offices and amenities are no higher than 255mm Ensure designated walkways are installed for workers to have safe access to work face. Ensure no trip hazards are left around amenities or common plant Surveyors to communicate with site supervisor on intended site movements Ensure you have an awareness of the construction traffic in your areas of works and maintain communication with operators and other workers via UHF Clearly communicate with other workers in the area to the extent of your works Practical Fencing and mandatory entry / warning signage is to be used to prevent unauthorised entry. Clear signage identifying the company contact details to be displayed at the site entry Plans and DBYD to be attached to all excavation permits All existing services to be physically identified and marked for future reference as per Excavation procedure IMS-02-05 Establish environmental controls where required Establish position for dewatering Establish position for required small plant i.e. generators, dewatering pumps Identify area for laydown of materials R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 CLEARING AND GRUBBING Hazard / Risk Control Measures HAZARDS Lack of Awareness on correct procedures and SWMS Incorrect maps and plans provided. Protected areas cleared Damage to flora and fauna. Damage to habitats. Cross contamination between weeds. Spreading the seeds from other pest plants Operators unaware of workers inside the work area. Falling Trees Contact with herbicides and Pesticides Person/s bitten by venomous creature. Unable to locate Snake Bite Kits / spill kits Failure to follow CEMP requirements Manual Handling CONSEQUENCES Fatality Serious injuries Allergic reactions Burns Damage to assets/live or existing services Manual handling injuries from twists, sprains and strains, Cuts, abrasions Environmental Damage Pre-start meeting to ensure workers are fully aware of the scope of works and limit of clearing. Correct drawings to be present on site at all times and revisions checked Exclusion zones to be erected around protected areas or trees. Avoid touching vegetation with bare hands Keep handrails clean of vegetation/dirt & remove vegetation off machinery before maintenance Weed Hygiene Declaration IMS-05-64 to be completed, if applicable to site location Only essential personnel allowed at work area. Wash hands/face thoroughly after handling any objects whilst in the work area. Wildlife catcher to be onsite, if specified in contract No work to be undertaken without spotter present Wildlife catcher to provide SWMS/risk assessment for work being undertaken Roots suspected to be near underground services to be pot holed and vac trucked to positively identify service locations. Machinery to be used wherever possible - if requirement to clear by hand, then workers to work in pairs wearing appropriate PPE and skin covered Snake bite kits to be available, if threat exists Weed survey as required and follow removal/disposal instructions. Spill kits to be on hand at all times R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 MANUAL HANDLING Hazard / Risk Control Measures HAZARDS Lack of understanding of tasks / hazards / required controls Failure to follow correct manual handling techniques Failure to conduct risk assessment Slips, Trips and Falls CONSEQUENCES back and neck injury, muscle strain, ligament tear, bruising or broken bone Pinch injury, cuts and abrasions and damage to joints. Severed Fingers Consult with all persons involved in the task on the site condition/hazards and job tasks/hazards and their responsibilities. Identify area where the load will be moved too, ensuring there are no obstructions, tripping hazards on route. Where possible use a mechanical aid to lift the object or rearrange the flow of materials to reduce handling. If manual lift must be undertaking, the following considerations must be given: Get a solid hold on the item which you are about to lift, using leg muscles to move low level objects, keeping your back straight by tucking in your chin and bending your knees and lifting with your legs, The load should be held as close to the body as possible. Lift load slowly and do not jerk. Avoid twisting your back during lifting or when moving the load. Lifting with one hand should be avoided. If you are unsure of the load’s weight, ask for assistance Team or dual lifts can be used where practicable. All consideration used in individual lifts need to be applied to team and dual lift tasks. When lifting manhole lids, use lifting aids. The correct Gatic style manhole lifters must be used. Do not lift any load beyond your capability. R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 Diagram 1 - Manual Handling Techniques ELECTRICAL SAFETY including Tag and Lockout Hazard / Risk Control Measures HAZARDS Untrained worker Procedures not followed Equipment not test and tagged Equipment used without safety switch CONSEQUENCES Serious Injury or Death Electrical shock Burns Fire Any persons working to install, modify, test or certify electrical installations are trained in accordance with both the type of work being undertaken and the jurisdictional requirements. Electrical Safety Procedure IMS-02-04 must be followed Always check to ensure that the electrical equipment being used has been tested and tagged and is in current test date; Ensure all portable electrical equipment is connected to a safety switch; If using a portable safety switch always test that it trips after the equipment is being plugged in by pressing the test button on the side of the safety switch; Specified electrical equipment used in manufacturing work must be protected by a fixed safety switch. Previously a portable safety switch was an option. Never use a double adaptor or piggy back plug or domestic rated power boards in a workshop or construction site; If any electrical leads to portable equipment are frayed, or single insulated coloured cables are showing, do not use the equipment; If personal or hired electrical equipment is to be used at the workplace, the Supervisor needs to approve and visually check it to ensure that it is safe, has been tested and tagged and is in current test date. If electrical equipment is hired, for use in a workplace it is to be: Inspected and tested by a competent person, before every hire and at least within the last 3 months; If the equipment is not working properly or is unsafe, it must be withdrawn from use, with a ‘Danger – Do not Operate’ tag affixed to the equipment. If any electrical equipment is found faulty or does not work: It is to be immediately removed from use It is to be tagged with a ‘Danger – Do Not Operate’ tag; Your supervisor is to be notified immediately; and This tag is only to be removed when this equipment is fixed. Note: The person finding the equipment out of order would be the person to place the tag on the equipment. Always use a portable safety switch connected to a portable generator; if the generator does not have a built-in safety switch. Specialist advice should be sought from an electrician to identify the correct safety protection when using portable generators if unsure Do not touch live welding electrodes unless using insulated gloves. Do not allow any part of welding electrode to touch any part of body; Ensure the welding electrode holders are of an ‘all insulated’ type; and ensure the welding leads are correctly connected and in good condition. R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 HAZARDOUS CHEMICALS Hazard / Risk Control Measures HAZARDS Combustion Explosion Fire or other sources of ignition Incorrect Use or mixture Lack of First Aid Awareness Incorrect Chemical Handling Lack of Ventilation Chemical Exposure Accidental Chemical Release /Spills CONSEQUENCES Asphyxiation Breathing Difficulties Blindness Poisoning, Burns, Serious injury or Death Environmental Damage Adhere to the Hazardous Chemicals Procedure IMS-02-08 when using a chemical Hazardous chemicals must be used following SDS requirements Minimum quantity to be stored onsite Ensure work area is well ventilated and correct PPE is worn. In the event of accidental release of chemicals - Notify the job supervisor immediately- who will take control of the rectification process and prevent further release. Commence Evacuation of the worksite, if a risk to health and safety exists (in accordance with the Emergency Response Plan) Spill kits - of adequate size to contain any potential spill - must be available on site. Workers should be familiar with the location of kits. Secure chemicals, where the containers cannot be damaged Keep Chemicals clear of ignition sources Ensure only chemicals with labels are used, and that applicable SDS’s are available Drenching/Dump washing facilities will available on site (if applicable) Ensure adequate bunding is available onsite (if required) Ensure the requirements of the Environmental Management Procedure is implemented Chemical disposal shall be in accordance with the SDS and Empty containers are to be disposed in accordance with the procedure and at an approved facility R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 HANDLING GAS CYLINDERS Hazard / Risk Control Measures HAZARDS Failure to follow procedures Manual Handling Cylinder Damage Plant Damage Equipment Deterioration Fire / Explosions Gas Leaks Toxic Gas escaping Cylinders missed with other dangerous goods causing volatile mixture during vehicle accident Unidentified storage area and unauthorised access to area CONSEQUENCES Asphyxiation Breathing Difficulties Blindness Poisoning, Burns, Serious injury or Death Environmental Damage Strains and Sprains – back, arm and leg Compressed gas cylinders must be handled by personnel who fully understand the hazards involved with the use, movement and storage of gas cylinders Be aware of cylinder weight and use good manual handling techniques Use mechanical aids (trolleys) when moving cylinders, wherever practicable. If lifting G size cylinder, mechanical aid or 2-person lift must be used Do not roll cylinders along ground in a horizontal position Clean valve and connector before connecting ‘Crack’ cylinder valve to blow grit from its valve, open valves slowly Keep cracked gas away from face or ignition sources Remove all combustible and flammable items from the work area Use proper fittings tools to tighten connections and leave on cylinder Do not interchange fittings or regulators or try to adapt them to gases which they are not designed to handle Do not by-pass the regulator when discharging from a compressed gas cylinder Do not use adaptors to connect regulators to gas cylinders Never drop cylinders, allow heavy objects to fall on cylinders or allow them to strike each other Use open vehicles to transport cylinders – do not ‘cover’ (tarpaulin, canopies) fuel gases unless vented to outside When cargo area is open to the passenger area (e.g. van) a separate air tight compartment, permanently vented to the outside must be used When more than 250L of dangerous goods is being transported it must be in accordance to the ADG code. When Transporting cylinders – remove regulator, valves to remain closed and protection guards/caps are to be used wherever possible. Ensure cylinders are secured in an upright position Cylinders are to be stored in accordance with AS4332 -The storage and handling of gases in cylinders and different types of gasses to be segregated Do not store cylinders near combustible materials or flammable liquids – keep flammable gases away from ignition sources Cylinders should be stored vertically and secured from falling over and away from heavy traffic and emergency exits Remove empty cylinders from the area as soon as possible Storage areas must clearly show signage in accordance with DG legislation, this includes class diamonds, Hazchem, no smoking and naked flame signs Designated storage areas that prevent unauthorised access and protect untrained people from hazards Adequate Emergency equipment (Fire and first aid) to be adjacent to storage areas. R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 REFUELLING Hazard / Risk Control Measures HAZARDS Damaged/Unsafe plant being used Failure to follow correct procedures Incorrect equipment being used Fuel Spills Fire Explosion / combustion Lack of concentration Fumes Slips, Trips and Falls Overheating and other sources of ignition Equipment too hot when refuelling Release of excess pressure, steam or heat Fall from heights CONSEQUENCES Serious injury or Death Sprains, Strains, Fractures, ligament damage Environmental Damage Burns / Chemical Burns Poisoning Chemical Exposure Hand injuries, head and eye injuries, cuts and abrasions Plant Hazard Assessment (PHA) to be conducted on all plant entering site. Follow Refuelling Small Plant/equipment Procedure IMS-02-26 Take 5 (or PTA) completed before commencement of task Refueling area to be established, with level/Stable ground in a well-ventilated area that is free from any ignition sources. Location considerations to include any natural water courses /potential areas that may be polluted Ensure a spill kit is available nearby and overspills are immediately cleaned up and reported to the site supervisor. Equipment to be turned off and shut down and hot equipment is allowed to cool for 15 minutes before attempting to refuel Ensure the correct refuelling methods are used, 5L anti spill container for small plant and equipment and ensure a funnel or nozzle attachment is used Beware of excess pressure when removing fuel cap Do not use mobile phones in the Refuelling area or whilst refueling Carbon dioxide/dry chemical fire extinguisher in close proximity. No smoking. Or Naked Flames Wear appropriate PPE Ensure SDS’s are available and in close proximity. Remove any contaminated clothing and wash prior to re-use. Do not intentionally inhale vapors Use mobile platforms if required or ensure plant has sufficient hand rails. ADDITIONAL REQUIREMENTS FOR STOCKLAND SITES Petrol Flex Drive Pumps are NOT permitted on Stockland Sites R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 Diagram 3 – Refuelling Flowchart MOBILE PLANT Hazard / Risk Control Measures HAZARDS Failure to follow correct procedures Operators not competent Slips, Trips and Falls Plant not fit for Use Noise Disrupting the public Plant not loaded / unloaded correctly Attachments falling from Plant Plant and Plant/People Interactions Inappropriate Haul Road and/or Traffic Flow Collision of Plant / Vehicles Plant operated inappropriately Failure to follow site rules Failure to adhere to speed limits and haul road requirements Entering Exclusion Zones Pieces of Rock hitting persons Damage to services or infrastructure CONSEQUENCES Damage to hearing Serious Injury or Death Serious Sprains, Strains or fractures, lacerations General Discomfort and angst of public Disruption to public assets Mobile Plant Procedure IMS-02-32 to be adhered to. Plant is only operated by experienced persons, who have completed a Verification of Competency for that type of plant. Ensure Verification of Competencies are completed for all operators of Plant, in accordance with VOC Procedure IMS-02-20. Pre-starts checklist IMS-05-24 conducted prior to operating plant ROPS / FOPS and seatbelts for plant, fitted as per operating manual and consistent with AS 2294 Plant is not to be operated outside time restrictions. 3 points of contact must be maintained when entering/exiting plan. Visual inspections of steps, platforms, handrails etc is conducted, ensuring they are free from dirt, grease, other obstructions Seat belt to be worn whilst operating the machine When unloading plant, use correct access and take care when accessing cabin, ensure ramps are not lowered onto obstacles, unload on firm level ground When using attachments - all safety retaining pins are to be in place and Bump & drag test conducted ensuring attachments are engaged properly Plant are to have warning devices fitted and working, including flashing lights, reverse warning alarm and UHF radio. Do not enter work / exclusion zone of operating plant without operator permission. Positive Communications must be achieved with the spotter / operator. Appropriate Exclusion Zones are to be set up, with ‘No Entry’ signs used, where there is the chance of unauthorised persons entering the work area. These zones are to be coordinated with site management. Do not walk behind moving plant or stand/work in blind spots. Site supervisor will monitor all plant and haul road operations. Unsafe operations are to be stopped immediately and appropriate controls to be implemented. Speed limit signage must be in place on haul roads. Max 40km/hr. All mobile plant must adhere to site rules and speed limits Delineation must be installed on haul road edges in hazardous areas. Workers using haul roads must complete a haul road induction, if it is a requirement of that site. Haul Road Traffic Guidance Schemes (TGS) to be developed and updated as required. Radio communication must be used to inform other vehicles of presence and intentions. If unsure of other vehicles movements, use the radio to confirm the intended movements of the vehicle. Wait for a positive response before proceeding. MOBILE PLANT Hazard / Risk Control Measures When using rock breakers, an exclusion zone will be installed to prevent workers or others from entering an area that may cause risk of being hit by objects, hearing damage or other associated hazards in the rock breaker zone. The exclusion zone should be appropriate for the task and risks and consider the type of material being broken and the risk to persons The rock breaker attachment shall only be attached and removed by a competent person Persons working on or near the rock breaker zone require appropriate PPE i.e.: hearing protection. Risk Assessment completed for plant operating on Stockpiles. R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 Diagram 4 – Mobile plant Blind Spots TRANSPORTING / UNLOADING AND LOADING PLANT Hazard / Risk Control Measures HAZARDS Lack of understanding of tasks / hazards / required controls Lack of understanding Traffic Flow Failure to implement Positive Communication Plant and Plant Interaction Plant and Person Interaction Quick Hitch Failure Loss of Loads Plant Blind Spots Operators Not Competent Failure to follow site rules Failure to adhere to speed limits and haul road requirements Entering Exclusion Zones Slips, Trips and Falls Truck / Crane slipping on uneven surfaces or slippery ground Truck/Plant rolling away/over Failure to follow manual Handling Techniques Failure to implement a site designated laydown area Not having a safe stable ground to unload Tight areas for manoeuvring plant Sediment builds up in storm water lines Sediment laden water leaving site Damage to services or infrastructure CONSEQUENCES Strains, Sprains Hand Injuries, Head Injuries, Eye Injuries, Cuts and abrasions Crush Injuries Serious injury or Death Plant Damage Drowning Operator trapped in Plant Environmental Damage Disruption to public assets Transport and Arrival at Site Conduct Prestart, complete the relevant prestart form and send copy to Transport Coordinator. Report any faults / issues Plan the trip - Prior to departure, Operators should review travel route for any hazards, congestion, closures etc. Upon arrival on site the transport / plant operator is required to park the vehicle in an allocated safe parking space, as arranged with the site Foreman Check for OH powerlines and other obstructions above/on ground Always apply park brake prior to leaving vehicle and where required, chock wheels and drums. Loading Loads are to be secured at all times, in accordance with NHVR Load Restraint Guide, where applicable. A load must not be placed in a way that makes the vehicle unstable or unsafe and must be secured, so it is unlikely to fall or dislodge. Load binders, straps, chains and load dogs to be inspected before use, only use certified and tagged equipment Ensure Loads are within maximum Mass and Dimension limits Lowering / Attaching Ramps Gloves must be worn when unlatching, lowering and/or attaching ramps. Fingers kept clear of pinch points around the ramps. If ramps are to be attached, consider using a second person for a team lift. Remember to lift using the legs and bend the knees Inspect ramps to ensure they are in good working condition. All pins used must have a safety clip on the underside to prevent any chance of unplanned vertical movement. VERY IMPORTANT TO CHECK BOTH PINS AND SAFETY CLIPS. Make sure hinges / pins are secure and in good working condition per the manufacturer’s specifications. Ensure machinery weight does not exceed safe working load limit of the ramps. Inspect surrounding area for any debris, uneven ground, steps, gutters or any other hazards that may interfere. Removing Lashing (Tie Downs) Ensure parking brake or other plant isolation is engaged. Remove lashings in sequence (usually front to back). If a lever bar is required, the operator must stand to the side of the bar NEVER directly in line with it. PPE must be worn which may including riggers gloves, eye protection, hard hat and safety boots. Unload Plant Set up exclusion zone around truck/plant being unloaded so all persons are outside the line of fire should plant slip or fall off truck. Access the transport deck via ramps when possible or by other means using 3 points of contact at all times. Extra care must be taken and considered in wet conditions. Clear area of obstructions make sure ground is firm, level, and the area is spacious enough for unloading. Check surrounding environment again immediately prior to starting the plant making sure nothing has changed including pedestrians or other physical obstructions. Use Spotter in a safe place when required. If a spotter is used, clear communication and a clear view of the spotter must be maintained at all times. Raise any part of the plant including attachments off the transport deck enough to not touch the deck whilst moving. When clear and safe to do so, move plant slowly toward the ramps. No slewing, skidding, or skewing whilst moving the plant. Descend the plant down the ramps at a slow and controlled pace with the tracks or wheels positioned in the centre of the ramps Park the plant in the predetermined area within the exclusion zone. Unloading and Reloading equipment / attachments Unloading / loading attachments or other equipment must be carried out with care and attention. Where attachments have an intended purpose of being engaged by a quick hitch this must be used including the safety pin at all times Where required a Spotter is to be used to assist in the engagement of attachments. Clear communication and visibility of the Spotter must be maintained at all times. The operation of the machine whilst carrying out the task must be slow and steady. When using HIAB to unload/load, control measures from lifting SWMS must be followed. Leaving Site Areas left in a clean and tidy state. Sign out and Traffic Management Procedures followed Environmental wash station / gravel driveways utilised. Ensure that all wheels are free of dirt / mud to prevent transfer to roads and other sites and to prevent the spread of Fire Ants, weed etc R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 UNLOADING AND LOADING – Materials Hazard / Risk Control Measures HAZARDS Lack of understanding of tasks / hazards / required controls Lack of understanding Traffic Flow Failure to implement Positive Communication Plant and Plant /person Interaction Loss of Loads Plant Blind Spots Operators Not Competent Failure to adhere to speed limits and haul road requirements Entering Exclusion Zones Slips, Trips and Falls Truck slipping on uneven surfaces or slippery ground Truck/Plant rolling away/over Failure to implement a site designated laydown area Not having a safe stable ground to unload Tight areas for manoeuvring plant CONSEQUENCES Strains, Sprains Hand Injuries, Head Injuries, Eye Injuries, Cuts and abrasions Crush Injuries Serious injury or Death Plant Damage Operator trapped in Plant Environmental Damage Ensure the drivers are aware of; site layout, load/unload locations, physical aspects of the route. Changing conditions and operate to suit those conditions overhead power lines, bridges prior to commencing ground personnel, the public and other plant interacting in the area road rules, speed limits, signs and traffic control signals/systems. Loading Positive Communication between driver and excavator / loader operator Is obtained prior to entering the work area and confirmation of preferred load position Ensure TARE weights are not exceeded Ensure nothing protrudes from the body before moving Ensure the area is set up, so the driver drives forward out of load areas and it is not downhill, to prevent rolling back into the excavator/loader. Ensure operators remain in the Cabin while being loaded Ensure operators are aware of plant blind spots Unloading An Exclusion Zone is set up – minimum radius = height of tray + 3m Ensure the driver understands where each load is to be tipped, as this may vary from load to load When setting up Tipping Areas, consideration should be given to ground conditions, load type, angles, ground compaction, & proximity to edges. Drivers should be able to tip up/down a slope not across it. Ensure drivers DO NOT Reverse & Hoist tray at the same time, as this increases the chance of roll over. Ensure all trucks lower hoist before driving off, as failure to do so can increase risk of rollover entanglement & damage to truck Operators must operate within their own ability. If in doubt stop & discuss available options with supervisor and co-workers. Ensure any / all permits are completed (Fire ants, weeds etc) R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 MAINTENANCE OF PLANT Hazard / Risk Control Measures HAZARDS Object / persons fall from height Lack of awareness of risks/hazards Lack of Training or supervision Remote or isolated work Failure to notify site personnel of works Machine fault that is potentially fatal ROP’s /FOP’s are damaged and will not work as structurally as they should in the event of a rollover. Faults are not reported machines guards are altered Slips, trips, and falls resulting in injury Permit not obtained or followed CONSEQUENCES Crush Injuries Head Injuries Serious injury or Death Sprains, Strains, Fractures, ligament damage Environmental Damage Burns / Chemical Burns Poisoning Chemical Exposure Hand injuries, head and eye injuries, cuts and abrasions Plant prestart Only qualified persons to conduct maintenance on plant and equipment that is not part of the plant pre-start. Pre-starts to be completed on all plant prior to operation. ROP’s, FOP’s, safety devices and attachments must be checked. Three points of contact to be maintained, while conducting pre-start Be aware of ground conditions and remove built up mud from boots and steps, to prevent slips, trips and falls. Any faults identified are to be reported to the faults hotline and documented on the plant prestart. Only qualified, approved person/s may remove or alter machine guarding Maintenance of plant and equipment Any maintenance conducted onsite, must be conducted in accordance with Maintenance of Plant and Equipment Procedure IMS-02-37, including completed and approved Maintenance permit. Service truck and equipment to be maintained regularly, checked for fuel / oil leaks. Barricades & No entry signs to be erected to prevent unauthorised persons entering work areas if necessary. Keep bodily parts away from machinery parts that may crush, vibrate, compact, spin or cut De-energise all stored energies Lock out tags to be placed on equipment before commencing any maintenance works A ‘Danger - Out of Service Tag’ is to be used as a notification to other persons of any extraordinary conditions that may exist, e.g. faulty equipment. Notify supervisor, as the situation warrants. Tags can only be removed by the person who placed the tag. They must satisfy themselves that the equipment or service is in proper working order and that its operation will not cause damage to plant or risk injury to other persons MAINTENANCE OF PLANT Hazard / Risk Control Measures Always open the accumulator’s valve to release pressure. Hoses under pressure act as accumulators. Eliminate all ignition sources or heat sources from contact with hydraulic lines or escaping fluids, sprays or mists resulting from hydraulic failures. All swinging arms, booms, rollers, presses must be lowered or supported to eliminate the risk in the event of a hose failure. If the equipment is mobile, always chock the tires to prevent rolling. When conducting maintenance on hydraulic hoses ensure the hose and coupling manufacturer are the same and that they’re assembled using the manufacturer’s recommended equipment, components and procedures. When connecting threaded or flanged ends, follow proper torque recommendations for hydraulic hoses. Check hydraulic fittings prior to commission Fitter to observe repaired area when operator starts machine Recheck and retighten nuts/bolts Remove lock out tags when repair/Maintenance is complete. Any machines requiring next day maintenance function are to remain locked out in accordance with Tag and Lockout procedure IMS-02-15, area to be cordoned off with barricading and signage prior to departure R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 WORKING NEAR OVERHEAD POWER Hazard / Risk Control Measures HAZARDS Energex not aware of works Lines not adequately shut off or covered or other controls in place Plant/Workers coming into close vicinity or hitting Overhead power Correct emergency procedure not being followed Delayed emergency response or lack of adequate emergency response Damage to services or infrastructure CONSEQUENCES electric shock or electrocution, Burns, Serious Injuries or Death Multiple persons injured Disruption to public assets Planning – Energex / Ergon require 7 working days notification including pole numbers, if power is to be shut off or lines covered Contact Energex / Ergon for safety advice on working near Energex / Ergon Exposed Live parts” if applicable Identify locations of all OH Power, OH Powerlines are to be treated as live unless otherwise confirmed in writing by power company Plans to be attached to excavation permit where identified. Assess the risk of working near OH powerlines Plan works to limit exposure to overhead power lines and follow advice given by Energex / Ergon on the safety advice Have power line heights measured and documented by authorised persons A safety observer (spotter) is required and adequately trained & authorised by Energex / Ergon when working near overhead power. Refer to diagram 1 of this SWMS No person, including a contractor, is to enter the Safety Observer Zone - unless a spotter is in place Existing ground height should not be changed unless all staff are notified of the new clearances to the OH powerlines and approved by the supervisor. Powerlines must be identified with signage in high risk areas. Where possible, mark the border of the exclusion zone with suitable hazard markers eg: warning tape, dymark paint or signage The spotter shall not perform any other duty or observe more than one activity whilst acting as spotter and must be able to communicate effectively with the operator at all times Check “Exclusion Zone Chart” for allowed operating distance near live parts. (see section B) When moving excavators near Overhead power, ensure the boom is extended out in the lowest position and have a spotter to guide through power line areas Spotters are in control of the plant, they are spotting – if the operator loses site of the spotter, they are to bring the plant to a full stop until such time as the spotter is in site again. No raising of truck hoist under OH Power without spotter in place Emergency Procedure Contact Energex immediately to have the power shut off If outside the machine Stay Clear at least 8 meters Do not try to break contact between the machinery and the OHP if contact has been made If inside the machinery Stay in The Cabin Machinery operators must not leave the cabin until the OHP is deactivated and the area declared safe by the power company or their representative If evacuation is necessary, Jump Well Clear with Feet Together, Hop Away, Do Not Touch the Ground and The Machinery at The Same Time Rubber tyres may explode (not necessarily immediately) Keep well clear of power lines on the ground R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 Diagram 5 – WORK NEAR UNDERGROUND SERVICES Hazard / Risk Control Measures HAZARDS Service Strikes Delayed Emergency Response Pot holing not completed by competent trained person Damaged underground services Failure to follow procedures and SWMS Slips, Trips and Falls Persons entering Exclusion Zones Persons falling into an excavation Further damage to assets Combustion Explosions CONSEQUENCES Serious Injuries or Death Sprains, Strains, fractures, ligament/joint damage, lacerations Infection / Disease Electrocution Electrical Burns Disruption to public assets Review Works and Requirements for job and complete Risk Assessment for all works. Prior to commencing excavation around live services, a documented risk assessment must be undertaken to confirm adequacy of required controls Project team undertake site inspections to confirm site conditions and underground services using site drawings, DBYD and other visual indicators such as Pits, Valves, Marked Poles and Overhead Power to mark out services. Steps 1-2 is all about planning and making sure all current lives services are identified prior to works taking place, planning works and reconciling DBYD with what is in the ground. No mechanical tools to be used near services, all services must be positively identified using Vacuum Excavation or Hand Digging using Non- Conductive Hand Tools. If any excavation is within 3 meters of services. Blade Buckets must be used when excavating near known services Once the location of live services is confirmed, their location should be clearly marked on the ground using the following method: Pothole markers 100mm PVC pipe inserted into pothole (this prevents earth falling back into the pothole and maintains visibility of the service Conduit with signage indicating type of service & depth Distance between potholes (and markers) should not exceed 5m and be no longer than 3 meters in high risk areas, the distance chosen between potholes must be detailed in Risk Assessment, outlining clearly risk based justification for distance chosen. Fully expose and visually Identify where live services intersect with any planned excavation profile. In such scenarios the service must be fully exposed 500mm either side of the trench at the point of intersection by vacuum excavation or hand digging. Ensure Excavation Permits are issued/understood and signed onto by all relevant workers Follow the Excavation procedure IMS-02-05 Clear area of obstructions, walk over ground to be excavated if required to excavate. Where possible, mark the border of the exclusion zone with suitable hazard markers eg: warning tape, dymark paint or signage No machine work within exclusion zone as per Service Owners relevant guidelines. Barricade open excavations, if left unattended for any period of time and the trench poses a risk to other workers or public. If damage is caused to the service. Immediately stop work, create an exclusion zone, contact site supervisor and contact asset owner immediately to have the asset switched off R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 Diagram 6 – Service Strikes TRENCHING AND EXCAVATING Hazard / Risk Control Measures HAZARDS Not following Excavation Procedure Attachment or load falling on worker Plant hitting or running over person Relevant controls outlined in permit not being followed Access and egress, slip trip or fall Ladder moving Trench Collapse Persons falling into trench exposed to dust Engulfment, Shoring boxes breaking, Plant/Trucks to fall into trench shields falling on worker unable to access or exit trench after collapse Delayed emergency response CONSEQUENCES serious injury or death serious sprain, strain or fractures Asphyxiation Engulfment Drowning Excavation Procedure IMS-02-35 must be followed Excavator bucket must be engaged as per manual. In regards to quick hitches A correct bump and drag test followed by crouching the bucket so as to view the rear hitch and ensure that it is correctly engaged will ensure that the hitch is correctly engaged before use. No worker to be in the drop zone of the Slew Radius (height divided by 1/2, eg 4m high = drop zone 2m) until the bucket is below chest height of the worker and the plant / excavator is in lift / crane mode. No worker permitted inside the blind spot of any plant (see diagram 7) until positive communication is made with the driver and the plant is in park position and all attachments are lowered and disengaged. Excavation Permit IMS-05-17 must be in place with DBYD and relevant plans attached. The site foreman should be risk assessing permit requirements on a case by case basis. Where working around live services, permit should be opened and closed on a day to day basis. Where working around services that are not live, permits could be opened for a maximum period of one week. When conducting bulk earthworks in Greenfield sites where there are no known services, permits can be valid for the duration of the works. Ladders or stepped access and egress are to be utilised. where people are in trench. The access/egress points must be no further than 9m away. Three points of contact to be maintained during use of ladder Where feasible a trench platform and fixed ladder should be used. Refer to Diagrams Trench Box set up of this SWMS Ladder to be anchored/secured or supported during use and removed during trench shield movement Barricade installed at least 1.5m back from edge of excavation, with “Deep Excavation” Signage. Trenches / Excavations over 900mm deep must be barricaded if unattended Monitor dust levels and suppress using water as required Surrounding water to be monitored for risk of penetrating trench Entry to trench/excavation not permitted, until shoring or benching is installed Trenches may need to be battered, benched or shored depending on ground conditions. Ensure that all shoring or benching has been carried out correctly All benching is not more than 1:1 and in accordance with the Excavation Code of Practice. Benching depths of a maximum of 1.5m - Depending on ground conditions benching depths may need to be less than 1.5 meters. Any benching above 1.5m must be approved and signed off provided by Geotech engineer Soil is not to be loaded on the side of the trench within 1m of the zone of influence of the trench. Refer zone of influence Diagram 7 Shoring must be conducted using certified boxes only, approved types include: hydraulic systems, steel sheet piling, steel trench sheeting, precast concrete panels No operation of plant/trucks or workers within the Zone of influence. Diagram 7 Exclusion zone to be established whilst installing or moving shield or plates Regular Inspections of trench must be undertaken on a regular basis to ensure it is safe as per Shadforth Excavation procedure. R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 Diagram 7 – Zone of Influence Diagram 8 – Trench Box Set up Scenario 1 – Double Trench Box or Manhole Box Confined space, regardless of whether end plates are in place. Harness to be worn by all workers attached to davit arm while entering and exiting the box Scenario 2 – Single Trench Box or Manhole Box Deemed a Confined Space. Davit Arm and Rescue Kit are required to be on standby (within 20m of trench box and accessible) Scenario 3 – Single Trench Box or Manhole Box 3m or less from top of box level to deepest part of trench. There must be no risk associated with engulfment or hazardous atmospheres. This must be assessed in line with the code of practice. Must have graded / Stepped access at one end. INSTALLATION OF TRENCH SHIELDS AND PLATES Hazard / Risk Control Measures HAZARDS Unloading near persons or work area slip trip fall hazard in work area Lose control of load or Load falling on worker Shoring box not assembled correctly Lift point failing causing load to drop on worker Lifting of load that is too heavy causing lift to fail Incorrect lifting technique increasing Chains breaking causing load to fall Worker in trench at risk of box falling on them Risk of worker falling in trench Engulfment of trench between bottom of trench box and base of trench Loose items falling into trench hitting worker Person falling into trench Access and egress, Slip trip or fall causing serious sprain strain or break, unable to access or exit trench after collapse Ladder falling causing worker to fall off ladder Lack of or Incorrect PPE worn, cuts, abrasions, crushed, breaks CONSEQUENCES Serious injury or death Serious sprain, strain or fractures Asphyxiation Engulfment Trench boxes to be unloaded in designated lay down area. Tag lines to be attached to components when lifting and control is required Workers to be clear of the load and loads are not permitted to be lifted over people. Shoring box is to be dismantled, assembled or adjusted by competent persons only, as per manufacturer’s recommendations. Lift point on plant to be certified and stamped. SWL to be checked on all plant Correct lifting techniques to be used on the cranage and lifting of the box. Refer to Crane Operations Procedure IMS-02-33 Chains and slings to be tested and tagged and visually inspected Exclusion zone to be maintained during shoring box installation. Workers / persons are not permitted in or around the trench during the installation. Trench to be excavated to the correct size for the installation of the shoring box Shoring box to be installed to the base of the trench, unless approved by geotechnical engineer and must extend 300mm above ground height to prevent items being kicked / knocked into the trench and hand rails are to be fitted to extend 900mm above ground height All loose items to be 2m back from edge of trench Areas not protected by handrails must have barricade installed 1.5m back from edge of excavation, with “Deep Excavation” Signage. Access and egress to shoring box maintained at all times. Ladders are to be secured with ladder strap and be appropriate for the task All persons to wear correct PPE while in shoring box R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 CRANE OPERATIONS Hazard / Risk Control Measures HAZARDS No following safe procedure Poor planning lift completed in an unsafe manner Adequate controls not being implemented Plant hitting overhead powerline Ground Giving Way / Plant instability Slips Trips and Falls Lose control of load / Load falling Lift point breaking Operator lifting load that is to heavy Operators not competent Persons entering exclusion zone Plant or attachments hitting person/s Plant or person being hit by boom swing Loads hitting person or plant Hose failure causing load to fall The drive lever could be knocked causing boom to hit worker Release of stored energy Load drift into person or plant Plant / Crane Tip over / not positioned correctly Suspended slab collapsing CONSEQUENCES Serious Injury or Death Crush Injuries Head Injuries Disruption to public assets Crane Operations Procedure IMS-02-33 must be followed. Refer to procedure for licencing requirement for Dual Lifts. Lift plan to be completed for critical lifts by the supervisor Simple Lift Plan IMS-05-97 and Lifting Task Assessment IMS-05-83 completed and in place for all simple lifts Clear area of obstructions make sure ground is firm, level, and the area is spacious enough. Visually check for overhead powerlines and other obstructions Ground to be inspected under outrigger position Isolate area from workers, that are not assisting Lifting points on Plant are to be certified Use tag lines on items which require guiding into place where appropriate Use swift lifts were appropriate Never stand under a suspended load and ensure nobody is in the vicinity of the suspended load The correct weight of the load must be obtained by the operator prior to the lift. Assess weight of load and ensure cranes SWL is adhered to All plant for load shifting are required to display their SWL. Take care when securing load and ensure correct PPE is worn Ensure all chains, slings, and lifting aids are designed to take the weight of the load, tested and in date, and free from defects Plant is only to be operated by persons holding appropriate qualifications and VOC. Before reversing, the operator is responsible for ensuring that no person/ workers are in close proximity to the vehicle. Appropriate work areas are to be set up where there is the chance of unauthorised persons entering the work area. Exclusion zones with ‘No Entry’ signs are to be used. These zones are to be co-ordinated with site management. Do not walk behind machinery that is being operated Use a spotter to ensure an exclusion zone of at least the length of the boom swing, is kept around operating plant where necessary All lifting and lowering of loads only to be done whilst machine is stationary, or loads are to be carried at a low level with all workers outside the exclusion zone. When attaching chains/slings to an excavator in crane mode, the excavator operator must disengage the drive lever prior to the task being undertaken CRANE OPERATIONS Hazard / Risk Control Measures Get spotters/operators attention before entering work / exclusion zone. Do not enter work/exclusion zone of operating plant without operator permission. Heavy formwork to be lifted by excavator (anti hose burst protection must be fitted to excavator used in crane mode). De-energise all stored energies Mechanical motion can be dangerous. Watch out for swinging arms, booms, rollers, presses — anything that moves can be dangerous if a hose fails. For example, when a hose bursts, objects supported by fluid pressure may fall, and vehicles or machines may lose their brakes. If the equipment is mobile, always chock the tires to prevent rolling. The load should be checked to ensure sufficient clearance if the load should shift. Position of the crane for lifting to ensure that sufficient area is provided for outriggers or stabilisers to be adequately extended and packed, If you are unsure of the condition of the ground, a geo-tech certificate must be obtained to ensure safe operation of the crane/excavator/HiAb, prior to the lift being commenced, If the crane/excavator/HiAb is to be set-up on a suspended slab, an engineer’s certificate must be obtained to ensure that the total weight of the crane/excavator/HiAb, the load and any lifting gear employed can be supported, or that sufficient support will be provided to ensure safe operation, prior to the lift being commenced, The size of the load must be combined with the height to be lifted and the radius to ensure that the load will not become “boom-proud”. When outriggers are out of sight, the operator will ensure that a lookout or observer will keep people away when retracting the outriggers, Once the crane/excavator/HiAb is secured, the operator will remove all equipment put in place for the control of traffic and pedestrians, and then move the crane/excavator/HiAb to a safe area. R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 WORKING ADJACENT TO A ROAD Hazard / Risk Control Measures HAZARDS Traffic management Plan not implemented / communicated effectively TMP not available to refer to onsite Lack of or incompetent traffic control Failure to comply with MUTCD Slips, Trips and Falls Incorrect signage in place Speeding vehicles Correct controls not in place People and plant unaware of plants position or intention to reverse Persons driving plant not seeing workers Incorrect set up of traffic controls Relevant hazards not assessed and/or lack of communication with workers Controls not adequately marked Traffic signage not set up correctly Workers and other persons entering exclusion zone Traffic Controllers not aware of TGS Workers on site not aware of any changes on site or new hazards Works not being kept to required standard CONSEQUENCES Traffic accidents Persons being hit by vehicles/plant Serious injury or death Serious sprain strain or fractures Traffic Management Plan (TMP) or associated TGS is in place, where required and a copy is available on site Traffic controllers (Ticketed and competent) to be used, where identified in the traffic management plan All works, signage and Barricading/delineation will comply with the Manual of Uniform Traffic Control Devices (MUTCD) Ensure any control devices applied do not become a potential hazard to workers or pedestrians or vehicles. Correct signage will be identified and displayed before work begins, as per the traffic management plan / TGS. Signage devices will be set up at correct distances, heights and kept in clean and good condition. Local speed shall be reduced to an acceptable level. Vehicle Safe ways shall be clearly identified and maintained at a safe level. Road closure permits to be obtained where required. Mobile plant / Vehicles to be fitted with warning devices - operating flashing lights & reverse beepers and signage if necessary - vehicle frequently stopping All persons working in vicinity of mobile plant or operating in poor/low light conditions will wear high visibility clothing. Where long-term works exist (more than one shift) correct suitable delineation (eg. Flashing lights or reflecting bollards) shall be installed and checked by a responsible person at the end of each shift. Risk assessment must be conducted prior to any night works commencing. Safety devices (eg witches’ hats) to be used around high risk work sites (e.g. traffic islands) Supervisor to check that pre- start traffic signage checklist has been completed and documented Exclusion zones and hazard warning signs (where required) displayed before work commences. Effective reliable communications available on site. Check barricading and signage is in place at the start, middle and at the end of each shift Ensure approved TGS is held by traffic controllers Ongoing risk assessments are conducted during the project and discussed at toolbox meetings. R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 WORKING ADJACENT TO WATER Hazard / Risk Control Measures HAZARDS Not knowing depth of water, worker falling into water Plant falling into water Operator unable to get out of plant should it fall into water Delayed or incorrect or non- existent emergency response Workers not appropriately trained Site hazards not communicated, no controls in place Worker entering work zone or area that would put them at risk No available first aid kits or limited stock Pollution of site and associated water ways Members of the public unaware of works. Complaints to council and the client. Rescue equipment not available or not in good working order Plant rolling off edge and rolling into water Unsafe work surfaces Flooding, slippery ground safe systems of work not being adhered Staff on the ground have no UHF or means of communication. Barricade is left down or not in place. Falls or enter the exclusion zone Untrained operators Incorrect PPE CONSEQUENCES Drowning Serious sprain strain or Fractures Environmental Damage Plant / Asset Damage Contamination to flora, fauna or waterway Clear area of obstructions, walk over ground to be worked and ensure proximity to water will not result in a machine slide or persons falling in Assess the stability of the work surface and Identify unsafe areas which may affect plant stability Determine the depth of water and if it is affected by tidal flow and its impact on the work Determine if it is possible to work from level areas, including temporary pads Work with site management and the WHSE advisor to devise and implement emergency procedures based on site conditions. Ensure all workers and operators are instructed in and understand the safe system of work and emergency procedures. Select the appropriate plant for the task and the site conditions Ensure all safety features and emergency exits on mobile plant are in working order Locate all above and below ground services prior to work commencing. Erect exclusion zone if necessary, to prevent workers being put at unnecessary risk A first aid person with Cardio-Pulmonary Resuscitation training is to be available on site where there is a risk of drowning to workers. Identify a spotter to oversee works operating near water Ensure that vehicles do not pollute the area with oil, fuel or other substances. If working in public areas, ensure that signage has been displayed to advise the public of vehicles working in the area - Restrict access to the area if possible. Ensure that site personnel do not work alone, where there is a risk of injury or drowning. Rescue equipment must be provided, maintained, easily accessible and all workers trained in its use. Slopes must be treated as significant hazards and edge protection should be placed around any water filled excavation. Monitor the site for any changes in the work surface and to ensure that the safe systems of work are being adhered to. Work to suit the weather conditions, heavy rain can make the worksite unsafe. Do not work in low light conditions. Effective communication is to be available for use should an emergency arise, and medical assistance is required. Ensure that appropriate and mandatory PPE is used at all times Clean vehicles of any mud or sand that may be adhering to it and contain the run off by appropriate means. Safe removal of all plant from the site. Removal of signage and barricades once area clear of workers Ensure works do not leave a future slip hazard for other workers or members of public. Ensure any barricades that may have been removed during setup, are returned safely to prevent future incidents R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 HOT WORKS Hazard / Risk Control Measures HAZARDS Poor planning and/or supervision Lack of understanding or Failing to follow controls/permit Workers not adequately trained No written authority in place No one present to help inured person or respond to emergency Slip trip or fall Other Workers/Person entering high risk works area Signs not readily visible not being able to suppress fire Risk of any fire or explosion spreading further than isolated area Not following confined space controls Workers Breathing in hazardous fumes hot surfaces Fire and explosion, Flashback Works not closed out CONSEQUENCES Hand Injuries, head Injuries, Eye Injuries, cuts and abrasions, Delayed emergency response leading to worsening of any injured persons condition serious injury or death Burns, Dehydration, heat exhaustion, heat stroke Hot Works Procedure IMS-02-28 must be followed All work is to be planned and supervised. Any staff who undertake hot work must be appropriately trained for the task and must not commence work prior to obtaining a valid written authority — Hot Work Permit IMS-05-18 No person is to commence hot works in a hazardous area, on their own and a record of their presence is to be maintained. Poly butt welding is considered hot works. Ensure control measures are implemented as per permits Ensure safe access and egress to the area. Ensure that hoses and leads do not become a trip hazard. Power supply cords shall be kept as short as possible. Ensure the area has been signposted or barricaded to prevent unauthorised entry Signage devices shall be clean and in good condition. Ensure personnel and equipment are available to execute a rescue where control measures cannot otherwise ensure that: there is no risk of fire or explosion, the work performed doesn’t generate a risk to health and safety. Equipment to be in close proximity to work zone. Equipment required is to include personnel protective equipment (PPE), first aid, and fire suppression equipment Ensure, where possible, that the area has been isolated. If hot work is required to be conducted in a confined space, then all confined space procedures and permits must also be complied with. Care is also required with the finished product which will be VERY hot. Depending on the item being welded and its location the fumes generated may be hazardous to health and precautions should be taken. Mechanical ventilation or local exhaust at the arc to direct the fume plume away from the face can be used. R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 WORKING AT HEIGHTS – Above 2m Hazard / Risk Control Measures HAZARDS Failing to follow procedures and control measures Slip trip or fall Worker/persons entering work zone or area Persons/ objects / attachments falling from height Incorrect equipment being used Ladder break Incorrect ladder Ladders not secured Ladders angle is not to the 4 in 1 ratio Ladder is damaged. Electric shock CONSEQUENCES Serious injury or Death Hand Injuries, Head Injuries, Eye Injuries, Cuts and Abrasions Serious sprains, strains or fractures Electrocution Working at Heights Procedure IMS-02-21 must be followed Wear appropriate/mandatory PPE as per safety induction & procedure. Conduct hazard Inspection and risk assessment of work area and remove hazards or put in place control measures. Where electrical hazards exist, the ladder used must be made of non-conductive material i.e.; timber. Three (3) points of contact must be maintained at all times whilst on the ladder -.i.e. 1 foot and 2 hands or 2 feet and 1 hand Implement exclusion zones, hazard markers, signs, equipment, emergency response equipment & PPE Signs will adequately indicate to the members of the public; The nature of the workplace, that unauthorised entry to the workplace is not allowed and the direction the pedestrians or traffic is to move. Be aware of persons, plant, equipment, buildings & weather conditions and take necessary precautions. Edge Protection including handrail/ kick boards to be used as required. Fall restraint System and Fall Arrest System to be used as required Use an Elevated Work Platform (EWP) to gain access if necessary. When working at height on plant – Will have suitable means of access/egress. Where tools may fall, a tool lanyard will be used. Isolation procedures to be implemented if required. All servicing to be carried out by competent person. Lower all attachments to ground. Ladders are generally used for access above ground level or to gain access to a difficult work area. Equipment used for the purpose for which it was designed. Is no longer than 6.1m (single ladder) or 9.2m extension ladder used to do electrical work, or 7.5m for other extension ladders Use a ladder that is suitable for job and conforms to AS/NZS 1892. Is not used to support a weight greater than that for which it was designed. WORKING AT HEIGHTS – Above 2m Hazard / Risk Control Measures Ladders that are damaged are to be taken out of service and labelled with a ‘Danger – Out of Service’ tag. Use an Industrial type ladder with a load rated not less than 120kg Step ladders are only to be used in the fully open position. When on a ladder the user must be facing the ladder at all times. Any tools or equipment to be carried up the ladder must be in a backpack, tool belt or other means to ensure that the user’s hands remain free. A second person shall foot the ladder whilst in use. The ladder must be positioned at a slope of 4 in 1 (for every metre in height the base of the ladder should be set back 250 mm). Where tools may fall from height a tool lanyard will be used. Tools, plant and equipment used at height will be kept at a minimum. Tools /equipment will not be left where they can be knocked or fall over edge. No more than one person shall be on a ladder at any time. R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 CONFINED SPACE Hazard / Risk Control Measures HAZARDS Gas detector not operated correctly fire and explosion No person presents to help injured person or respond to emergency flammable atmospheres Non-compliant with legislative requirements No awareness of confined space works being undertaken, incorrect controls not in place work area not adequately isolated Worker or Unauthorised person entering confined space risk of engulfment Asphyxiation Respiratory protection not working Harness breaking No awareness of any issues for persons in confined space heat, Persons left in confined space Members of public access confined space Confined space left open Incorrect Techniques being used CONSEQUENCES Serious injury or death Burns Asphyxiation Heat stroke/stress, exhaustion Confined Space Procedure IMS-02-02 must be followed All work is to be planned and supervised Any staff that enters or may be required to enter a confined space must be trained in working in a confined space and must never enter a confined space prior to obtaining written authority (Confined Space Entry Permit – IMS-05-05). Use direct reading gas detectors to test atmosphere of confined space. Gas detector must be operated by a competent person, calibrated and maintained. Helmets with Straps must be worn to avoid helmets falling Tools must have lanyard attached or placed into suitable bucket for the task. All tools and equipment to be left 1m back from confined space if there is a risk from falls from height Initial testing should be done from outside the confined space by inserting a sample probe and/or portable gas detection device at appropriately selected access holes, nozzles and openings. Because contaminants can settle at different levels, each part of the confined space should be tested – side to side and top to bottom Atmospheric testing and monitoring shall be carried out consistent with the hazards identified and the findings of the risk assessment. No person is to work in a confined space without a spotter Ensure personnel and equipment are available to execute a rescue where control measures cannot otherwise ensure that: A record of each person within a confined space and each person required for stand-by purposes should be maintained. The written authority should be displayed in a prominent place, preferably adjacent to the confined space, to facilitate signing and clearance. Appropriate emergency response and first aid procedures and provisions shall be planned, established and rehearsed. Where possible the confined space should be isolated — withdrawn from service. Where not possible workers must be protected from engulfment or introduced hazardous atmospheres. Ensure the confined space has been purged and/or cleaned Ensure the area has been signposted and barricaded to prevent unauthorised entry The equipment shall be appropriate to the work being conducted and the specific confined space. All employees, inside and outside of the confined space, will be trained in the use of all the safety equipment. Respiratory protection devices must comply with AS/NZS 1716 and/or 1715. Where safety harnesses and lines are required, they must comply with AS/NZS 1891.1 If found necessary ventilation will be provided to the confined space prior to entry and during occupancy. Ventilation should be by natural, forced or mechanical means to establish and maintain a safe atmosphere. Any contaminants removed from the confined space should only be exhausted to the atmosphere at a location where they do not represent a risk. CONFINED SPACE Hazard / Risk Control Measures Where flammable atmospheres exist eliminate all sources of ignition. Hot work is not permitted to commence in a confined space until a hot work permit has been issued and until the atmosphere has been purged and no longer presents a hazard to personnel. Fans used to exhaust flammable contaminants should be intrinsically safe. Where necessary, reference should be made to AS/NZS 1020 to guard against static electricity discharge. Communication and where possible, observation should be maintained between those in the confined space and the stand-by person. This can be achieved by voice, radio, hand signals, hard wired communications or other appropriate means. In confined spaces where flammable conditions could exist, radios should be intrinsically safe. Electrical equipment where used in a confined space and connected to an external supply should comply with AS/NZS 3100 and where required, installed in accordance with AS/NZS 3000. Portable electrical equipment should be connected to an earth-free, protected extra-low voltage supply from an isolating transformer (AS/NZS 3108) which is located outside the confined space. Protected through RCD (AS 3190) located external confined space. Must be intrinsically safe where there is a potential for combustibles. The use of hazardous substances in a confined space should be avoided wherever possible. If the substance must be used, the area must be well ventilated at all times and PPE worn in accordance to that specified on the MSDS. Personnel must be familiar with the product prior to using it in a confined space and a copy of the MSDS for the product must be readily available when and where it is being used. Dependant on the work being undertaken in the confined space and the conditions within the confined space, the workers should be monitored to prevent over exertion and/or collapse from fatigue. This can also be achieved by job rotation. Entry and re-entry to any confined space must only be allowed after the completion of all required documentation. Re-entry to the confined space is to be treated in the same manner as the initial entry. It is to be acknowledged in writing that work in the confined space has been completed and that all persons involved in the work have left the space before authorisation for the return to service of the confined space is made. Closure of entry to confined space as appropriate. Removal of means of isolation R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 PIT CONSTRUCTION AND CONCRETING Hazard / Risk Control Measures HAZARDS Not following relevant procedure Workers struck by plant/ vehicles Vehicles/plant roll over edges of batters and stockpiles Worker entering work zone or area fall from height unsafe lifting controls not implemented Open pits Workers hit by objects Wrong tools used Trip hazards - wire Unsecured loads Boom not isolated Falls from ladders Slurry enters the eyes Inadequate Barricading Trench collapse. Incorrect lifting Workers are crushed, or body parts pinched. Incorrect lifting point used Swift lifts are damaged or do not lock onto the lifting point. CONSEQUENCES Entangled Body Parts Impalement muscle fatigue repetitive strain movements. Back injuries, strains and sprains injuries. lime burns or other skin conditions, Damage to water ways and habitats and protected flora and fauna Crush Injuries Entry to pits procedure to be followed (see diagram 9) & confined space SWMS to be followed Be aware of reversing trucks and have a spotter designated for all deliveries of concrete and materials Be aware of mobile plant working in the area and create an exclusion zone where there is a risk of mobile plant interaction Barricades & No entry signs to be erected to prevent unauthorised persons entering work areas if necessary. All lifting to be conducted in accordance with Lifting Section of this document. When working with a concrete pump keep hands, arms, legs and feet away from the hopper grate whenever the pump is running. Never remove the hopper grate while the pump is running and never stand or walk on the hopper grate regardless of whether the pump is running or not Do not jump over or try to negotiate across formwork – go around it All steel fixing shall be conducted from one end of the work area and progress to completion of the work area where practical Vertical starter bars shall be cogged to allow safe access to the work area or safety caps shall be positioned on vertical starter bars to render them safe prior to access to the work area Nips are to be used in all areas where tie wire is used to tie steel & where practical bend wire tie ends over after nipping end Tie wire rolls are to be housed in belt reels and the belt reels are to be utilised at all times by the steel fixers to prevent the wire whipping back and striking the eyes. Heavy formwork to be lifted by excavator (anti hose burst protection must be fitted to excavator used in crane mode). When attaching chains/slings to an excavator in crane mode, the excavator operator must disengage the drive lever prior to task undertaken. If ladder is used to access pit it must be secured The ladder has a load rating of at least 120 kg and is industrial Have 3 points of contact on the ladder at all times Pour platforms with hand rail must be used where pit is 2m or greater above working height. All working at heights controls must be used as per working at heights procedure IMS-02-21 Correct PPE to be worn while handling concrete All barricade must be installed correctly without sagging or gaps and star picket caps must be in place. Barricade open excavations if left unattended for any period of time and the trench poses a risk to other workers or public. PIT CONSTRUCTION AND CONCRETING Hazard / Risk Control Measures Manhole forms to be lifted by lifting points only No workers to be inside or against the form while it is being “slipped” Slipped manhole forms must be supported to prevent unexpected movement. Manhole components need to be lifted from designated lifting points i.e aspro’s, necks, lintels and precast components Swift lifts need to be checked for current testing and any visible damage before use. If in doubt they need to be tagged out and reported to the supervisor Install gutter flow collectors where required & comply with site environmental controls for concrete wash out R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5 Diagram 9 – Entry to Pits Scenario 1 Pit with manhole form Person entering to be fitted with harness and safety line First ladder to be installed and ladder strapped to be installed Carabina to be installed on lifting point of manhole form Rope safety line and rope adjuster installed to Carabina point Second ladder to be passed up by spotter Second ladder to have ladder strap installed Spotter to be present, at all times Emergency procedure Extraction by excavator that is fitted with anti-burst protection and correct shackle Scenario 2 Pit not live less than 2m Person entering to be fitted with harness and safety line Test air quality with gas monitor Tripod to be available for immediate rescue Ladder to be installed and secure Spotter to monitor safety line Emergency procedure Extraction by tripod Scenario 3- Pit not live with aspro Confined space Person entering to be fitted with harness / safety line Test air quality with gas monitor Person entering to be secured to tripod Ladder to be installed and secure Spotter to monitor safety line on tripod Emergency procedure Extraction by tripod Scenario 4 Pit live no aspro confined space Person entering to be fitted with harness and safety line Test air quality with gas monitor Person entering to be secured to tripod Ladder to be installed and secure Spotter to monitor safety line on tripod Emergency procedure Extraction by tripod Scenario 5 Pit live with aspro confined space Person entering to be fitted with harness and safety line Test air quality with gas monitor Person entering to be secured to tripod Ladder to be installed and secure Spotter to monitor safety line on tripod Emergency procedure Extraction by tripod INSITU MANHOLES & LARGE PIT CONSTRUCTION Hazard / Risk Control Measures HAZARDS Not following relevant procedure Workers struck by plant/ vehicles Vehicles/plant roll over edges of batters and stockpiles Worker entering work zone or area fall from height unsafe lifting controls not implemented Open pits Workers hit by objects Wrong tools used Trip hazards - wire Unsecured loads Boom not isolated Falls from ladders Slurry enters the eyes Inadequate Barricading Trench collapse. Incorrect lifting Workers are crushed, or body parts pinched. Incorrect lifting point used Swift lifts are damaged or do not lock onto the lifting point. CONSEQUENCES Entangled Body Parts Impalement muscle fatigue repetitive strain movements. Back injuries, strains and sprains injuries. lime burns or other skin conditions, Damage to water ways and habitats and protected flora and fauna Crush Injuries To be read in conjunction with PIT CONSTRUCTION AND CONCRETING section of this SWMS Manhole / pit base to be excavated to allow safe access to all sides of the construction Entry and egress must be provided to the excavation and work areas i.e secured ladder, sand bag steps, smooth / even ramp or evenly cut steps Where the excavation is supported by a shoring box all accessible sides must have hand rails (sides may be excluded with the use of barricaded exclusion zones) and box is to be installed in line with the TRENCHING AND EXCAVATING section of this SWMS The work area around the manhole / pit must be free of excess material and must be a level, clean area with consideration of slips trips and falls hazards Drainage gravel to be used to create a level work platform around the base of the manhole / pit When placing materials such as reo steel bar, steel mesh, form board, manhole / pit drum consideration is to be given to manual handling and slips trips falls (workers having clear access to the materials and a clear path to move the materials to the work face) Excavation to be checked for correct size and to allow for access before bottom steel is installed Caps to be placed on all starter bars as they are installed from the base up No standing on top of pipes that are entering the manhole / pit unless filled on both sides to the crown of the pipe Where requiring a poly liner, the liner is to be fitted to the drum before drum is lowered into the excavation Fitting of the liner is to be completed using a platform ladder or approved trestles on level ground, no working off single or extension ladders Internal form to be installed prior to reo steel being installed to walls (reduces the risk of falls into the manhole) When lowering or lifting the manhole components no worker must be inside the drop zone of the suspended load (height divided by 1/2, eg 4m high = drop zone 2m) until the bucket is below chest height of the worker Once the inner form has been installed the manhole / pit is considered a confined space and any entry into the manhole / pit must follow the confined space procedure The external form is to be lowered in place in either parts or complete depending on the size and position of the structure with consideration of the height of the steel that the form must go over and safe access for workers / dogman to position the form Safe access must be provided for the workers to install the pour deck and pour the manhole via, scaffold (suspended or mobile) platform ladder or approved trestles on level ground Workers are not to be on
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 1 section
Section 2
pour decks without fall protection
Pour decks and false decks are to be constructed using approved materials and components including, purpose made pour decks, approved fixings and bracketing
All reo steel starter bars or vertical bars are to have correct sized, approved caps installed during all stages of the works including concrete pour
Access and egress for stripping of the forms must be conducted in line with Diagram 9 – Entry to Pits and confined space section of this SWMS
Internal forms must not be lifted with any worker inside the pit or inside pipes that enter the pit
Forms must be dismantled, rigged to the chains or sling and then worker is to exit the manhole before removing the internal form
Precast manhole and pit lid to be installed in line with lifting section of this SWMS
All open penetration to have approved covers installed when manhole or pit is not being worked on, at breaks and end of shift
R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5
RECOVERY OF BOGGED VEHICLES
Hazard / Risk Control Measures
HAZARDS Multiple vehicles bogged recovering vehicle rolls. Poor communication / Planning Tow cable snaps All potential hazards have not been documented Correct controls not implemented. Incorrect item of plant used for the recovery Incorrect towing points used Inspection of the attachment points before performing the recovery. Bystander is struck by damaged recovery straps/tow ropes. Vehicle in a location that is congested effecting other works. Workers being struck or runover CONSEQUENCES Serious injury Death Damage to protected water ways and flora and fauna. Potential harm to habitats Plant / Vehicle Damage Prior to rescue / recovery commencing, the ground conditions must be assessed to ensure no other vehicles become bogged.
Carry out Risk Assessment to ensure the most appropriate method of rescue / recovery is in use.
Communication protocols must be established, ensuring they are clearly understood before commencing the recovery. Radio or visual contact is to be maintained at all times between the operators of the disabled vehicle, the recovery vehicle and the person supervising the recovery.
All ground personnel are to be outside a radius of at least 1.5 times the length of the recovery equipment.
Only approved retrieval slings & shackles of the correct rating are to be used. Snatch straps and chains such as webbing slings, load resistant slings and rope are NOT USED for the recovery of vehicles and plant.
Suitability of recovery equipment such as cables, winches and hooks used to tow vehicles and plant are fit for purpose and verified by an independent engineer.
When recovering loaded vehicles, the mass of the load and the safe working load of the recovery equipment must be assessed and where doubt exists the equipment must be unloaded.
Where Vehicles and plant are fitted with towing points, the rescue equipment must not be connected to the towing point. As these are rated for towing and not for recovery on ‘bogged’ or stuck vehicles.
Only engineered attachment points are to be used for the recovery with appropriate supervision. If the attachment points have been damaged, or their effectiveness during the recovery is in question, specialist advice is to be obtained. Towing of bogged vehicles and plant is only undertaken when engineering attachment points and/or other methods are identified and verified.
Extreme forces are generated during recovery and therefore correct attachment to each vehicle using appropriately rated attachments and recovery points are imperative for vehicle, driver and bystander safety.
In the first instance attempt to drive out the bogged vehicle or plant either through freeing up or digging out the obstructions and/or via the aid of recovery boards and planks to facilitate grip and traction.
Any environmental damage caused is to be rectified as soon as is practicably possible.
On completion, all vehicles or plant involved in the recovery are to be inspected for damage by Plant Personnel, 3rd party workshop or person responsible for vehicles on the project.
R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5
DEMOLITION
Hazard / Risk Control Measures
HAZARDS Untrained persons undertake task Person getting trapped Structural Integrity Incorrect procedures are used Exposure to air borne particles. Unauthorised entry Workers unaware of the tasks and procedures Live Services Inadequate bracing of structures. Glass Falling Asbestos Lead Paint Workers trapped in the opening CONSEQUENCES Broken bones Twisted knees and ankles, Serious Injury or Death Entrapment Asphyxiation Electrocution Asbestos related illnesses Cuts, abrasions and lacerations Part 3A of the WH&S Regulations 2008 requires that a business that performs demolition work must hold a certificate to carry out that activity.
Complete a dilapidation report before commencement of demolition works
All hazardous materials are to be identified before work commences such as Asbestos, lead paint etc.
Ensure that all exclusion zones are in place before work commences.
Pre-start conducted to communicate to all workers involved in the activity their roles and to outline risks and hazards
All services to be made safe or disconnected before work commences.
During demolition temporary bracing and shoring shall be added for stability where necessary
If a structural component of the demolition area becomes unstable that is not in accordance with the intended demolition methodology a structural engineer’s advice is required and all other persons should be removed from the immediate area until cleared to return
All openings are to be boarded over or properly barricaded to prevent slips, trips and falls.
Precautions must be taken to prevent glass from falling on workers (remove excess if possible).
R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5
ASBESTOS REMOVAL
Hazard / Risk Control Measures
HAZARDS Incorrect procedure Particles become air borne Materials not identified efficiently Incorrect or Inadequate controls in place Lack of communications Lack of awareness Lack of training in Asbestos handling and identification Exclusion Zones not set up or inadequate PPE not adequate Staff are unaware on the tasks and PPE required Neighbours are unaware of works and pose harm to their health Incorrect training or not aware of health impact of asbestos No exclusion zones to warn others of the exact area the removal works are occurring in Onsite staff and other members of the public are unaware of the removal of asbestos. Particles become stuck to the workers clothes and particles are spread through the workers family throughout the use of the washing machine. CONSEQUENCES Asbestos Related Illness/disease Death dehydration and or heat strokes Only experienced and licenced staff to undertake works
For preparation an untrained person can assist with site set up
Pre-start briefing to ensure all staff are fully aware of the scope of work before work commences.
Conduct a risk assessment with all involved in the task
Asbestos removal by relevant person to inform any neighbouring properties or nearby work crews.
Ensure that neighbouring properties and home owners are aware and asked if they suffer from any medical conditions such as asthma etc.
Works are not to be conducted in windy weather.
Ensure persons handling ACM have appropriate certificate (“B” Class Certificate, Removal of ACM from workplace)
Barricading Requirements outer perimeter minimum 20m from outer edge of work area inner work area barricaded for actual removal zone
Place “Danger Asbestos Removal” Signs on barricade
Arrange decontamination facility to wash down personnel (e.g. water truck and hose)
Ensure all PPE is available and in the outer work zone. Disposable overalls, P2 mask or better (preferably full face for eye protection), Disposable gloves & Gum boots Ensure overalls are taped to gum boots and gloves, zip overalls all the way to the top and place hood over head Hard hats are exempt due to heat stress related issues and mask fitting
Have PVA glue, plastic or plastic asbestos bags, duct tape, pressure spray bottle in work zone, ready to use if required.
Keep pathways / work areas clear of trip hazards
R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5
QUICK CUT SAWS & CHAINSAWS
Hazard / Risk Control Measures
HAZARDS Failure to follow correct procedures Failure to wear correct PPE Cutting on unstable Ground Slips, Trips and Falls Blade Pinching Kick Back of saw Blade breaking Blade or Cutting particles, Shrapnel contacting persons Incorrect or inadequate chocking Slippery Surfaces Poor Vision Noise Disruption to public Pedestrians being within exclusion zones Damaged Equipment Broken Guards Blade Exploding Dust exposure / RCS Loss of Control of saw CONSEQUENCES General discomfort and angst to public Serious injury or Death Blindness Muscular and joint strain to back and knees Irritation form Dust (Eyes, nose, mouth) Chemical Poisoning Burns Environmental Damage Respiratory Disease Quick Cut Saw Procedure IMS-02-27 must be followed for all quick cut operations and for training and competency requirements of operators or other persons assisting with cutting operations.
All workers that are required to use a quick cut saw on any Shadforth site, must have undertaken the course ‘RIICRC319D Saw and cut concrete pavements to initiate planned cracks’ or a training program delivered by a registered training organisation and approved by Shadforth’s Compliance Manager.
Chain saw equipment only to be used by personnel who have undertaken ‘FPICOT2237 - Maintain chain saws and FPICOT2239 - Trim and cut felled trees.
Work zone for cutting must be a flat level area, with adequate exclusion from other workers/persons.
Ensure work area is tidy and free from obstructions
Ensure weather conditions are suitable, visibility is good with adequate lighting to make the cut, safely.
Consider the time of shift, that the activity is taking place – cuts are only to be conducted during allowable working hours.
A Take 5_IMS-05-51 to be conducted before all cuts by the operator, outlining all required controls are in place.
Workers and others assisting, are required to wear correct PPE – Gloves, Double eye protection including safety goggles or glasses and a full-face high impact face shield, hearing protection, hard hat, safety boots and Dust/respiratory Mask that has been fit tested. If required wear Chaps
Lift by bending your knees, grasping the load firmly, and then raising the load keeping your back as straight as possible. Never cut above shoulder height.
If there is a pedestrian access, it must be maintained to ensure pedestrians and cyclists have a clear & safe passage through the job site and are a safe distance from any potential shrapnel or other hazards.
Inspect the quick cut saw / chain saw prior to use, check saw blades, shafts, flanges, guarding, hand grips, and drive belts for wear and tear, correct assembly, and the correct functioning of safety equipment
Use Diamond blades and water when cutting, to suppress dust and clean up excess dust/water sludge
Do not overfill machine when refuelling, have spill kit/SDS on site nearby and use gloves while refuelling. Refuelling procedure IMS-02-26
Ensure item is blocked and chocked before cutting, ensure blocks are placed on flat level ground, ensure object being cut is placed on the blocks and chocked with plastic chocks, ensure object is stable and will not move prior to cutting, always stand with both feet firmly on the ground – never hold with one foot.
Never cut a pipe or object with the front or bottom of the blade / chain – the safest part of the blade / chain to use is the area between the bottom of the blade and the front of the blade as it sits on the machine.
Check the texture, shape, and composition of the object being cut for any hazards, be aware of any embedded cables or steel reinforcement
ADDITIONAL REQUIREMENTS FOR STOCKLAND SITES
Only the Stihl TS 440 14inch/350 mm with Quick Stop Anti Kick Back Brake Technology will be permitted to be used for the majority of cuts.
QUICK CUT SAWS & CHAINSAWS
Hazard / Risk Control Measures
Where the Stihl TS 440 14” quick cut is unable to be used and the 16” quick cut saw is to be used – A full risk assessment must be completed for each task.
Pit Crew and Pipe Crew foreman who are permitted to use the 16” quick cut saw, must complete the additional training requirements as required by Shadforth.
Use of a 16 Inch Quick Cut, is to be registered with the WHSE advisor on site
When cutting pipes over 1450mm diameter, the purpose-built pipe roller must be used to hold and guide the turning of the pipe.
R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5
Diagram 2 – Quick Cut Safety
ANGLE GRINDERS
Hazard / Risk Control Measures
HAZARDS Failure to follow correct procedures Failure to wear correct PPE Cutting on unstable Ground Rotating equipment Sparks Damaged grinding disc Electrocution High pressure air Flying objects Excessive Noise Slips, Trips and falls Manual Handling CONSEQUENCES Serious injury or Death Blindness Muscular and joint strain to back, arms and knees Irritation form Dust (Eyes, nose, mouth) Chemical Poisoning Burns Environmental Damage Eye injuries Electrocution and burns 9” GRINDERS ARE NOT PERMITTED ON WORKSITES
Ensure equipment is maintained in good working order, with current test tag (as per electrical safety procedure IMS-02-04) and all guards are fitted correctly
Ensure grinders are used in accordance with manufacturer’s instructions
Ensure leads are not placed where they could be damaged or cut
All adjusting screws should be tight
Check work is properly supported and wont slide or move and ensure the cut-off will fall safely or will be supported
Check electric cord will reach along the cut
Check floor is clear of obstructions and debris
Operator position must be comfortable, no reaching or off balance. Check your position so that the cut can be completed without unnecessary repositioning of the feet and without overreaching Get Assistance if necessary
Respiratory Masks that have been fit tested to the individual, must be worn at all times when grinding any products that may contain silica dust such as concrete / concrete products, bricks, blocks, tiles, pavers, fibre cement sheeting, stone or composite stone
Ensure any dust create in minimise and contained to work area
Prepare a spot to put the grinder down after each cut and ensure the blade has stopped before resting the grinder.
Insert the grinding discs prior to starting work (ring test)
Ensure the disc is compatible with the grinder
Check the RPM of disc and machine and check correct installation of grinder wheel
Place grinder loose on work
Switch off power / air to the grinder when not in use
R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5
GRIT SANDBLASTING
Hazard / Risk Control Measures
HAZARDS Lack of understanding of activity requirements Fumes, dust, Heat Trips, Slips and Falls Manual Handling Unauthorised work Conflicting activities Invalid permit Lack of competency Lack or poor communication Haste or shortcuts Air contamination Improper supply of air Ineffective filters Sandblasting on body parts Locking of dead man’s device Electric Shock Working in isolation Chemical spills CONSEQUENCES Electric shock Cuts, lacerations Eye, skin and respiratory irritation Obtain a permit to work, if required to do so
Ensure there are no conflicting activities near the worksite before starting the job
Only trained and competent persons are to conduct sandblasting
Use regulator to control supply
Change filter at the advised frequency
Monitoring the air and ensure good quality of air
Ensure dead man’s device is always in good operating condition
Do not allow workers to play with the sand blasting machine
Barricade the work area to prevent unauthorised entry
After completion of work make sure all the equipment & tools are properly taken back to their storage area
If any equipment is found to be unserviceable and/or faulty, place a “danger – out of service” tag on it and report it to the supervisor immediately
Identify all hazardous substances being used and ensure SDS are available for review and hazardous chemicals are controlled in accordance with the hazardous chemical’s procedure and SWMS
Ensure manual handling is conducted in accordance with the Manual Handling section of this SWMS.
When using high pressure water cleaner, ensure all controls outlined in the High-Pressure Water Jetting Section of this SWMS is implemented.
R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5
WELDING
Hazard / Risk Control Measures
HAZARDS Lack of understanding of activity requirements Fire / Explosion Confined Space Damaged equipment Slips, Trips and falls Manual Handling Fumes Welding Flash Chipping slag from weld Electric Shock Excessive noise Rotating equipment sparks High pressure air Flying objects CONSEQUENCES Burns Respiratory Eye injuries Hearing damage Electrocution Sprain and Strain – back and arm Hot works permit_IMS-05-18 or Maintenance of Plant & Equipment Permit_IMS-05-95 to be approved, prior to commencing any works
Have appropriate screening in place to protect other workers from flash
When working in open areas, use barricades to keep people at least 25m away
Use safe manual handling and lifting techniques in accordance with the SWMS.
Correct handling of compressed gas cylinders and regulators in accordance with the handling gas cylinders section of this SWMS
Position items so welder will be comfortable
Use extraction fan and work in well ventilated area
Remove all combustible and flammable items from work area
Do not weld on wet ground
Pre-Welding check must be completed by the welder or supervisor and all actions identified, should be rectified prior to commencing work
When employees are welding or heating - cables, leads or connections must be positioned so that there are no fire or tripping hazards created
Ensure appropriate ventilation is present whilst welding and regularly check for gas leaks
All hoses and leads are to be stored appropriately
Follow manufacturers specification for set up
Locate on Flat ground, protected from weather – ensure plugs, connections and sockets are clean and dry
Check equipment before starting
Have solid footing to weld
Wear gloves to weld and change electrodes
An electrode stub should not be left to burn less then 3cm
WELDING
Hazard / Risk Control Measures
Never Cool electrodes by dipping them in water
Keep electrodes dry
Store different electrodes separately
Prevent welding machine ventilation from being blocked
Turn off equipment before adjusting the polarity switch
Minimise welding machines exposure to corrosive fumes
Remove electrode from holder and switch off machine, once work is completed or if leaving work area
Oxygen cylinders valves have right turn connections. Acetylene cylinders have left turn connections. Black hoses connect oxygen, red hoses connect acetylene
Handling, store and use cylinders in accordance with the handling gas cylinders section in this SWMS.
Use flashback arrestors, between the cylinder and torch
Prevent hoses from being crimped or tangles
Leaks are to be repaired appropriately – taping up a leak is not acceptable
Keep equipment clean of oil and grease
Weld on table tops made of steel plate or special fire bricks
Release pressure in regulators and lines before storing or moving kit – open an acetylene valve from ¾ to 1 ½ turns
Adequate emergency equipment (in particular a fire blanket) to be onsite and accessible.
Barricade of the work area as appropriate
R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5
HIGH PRESSURE WATER JETTING / CLEANING
Hazard / Risk Control Measures
HAZARDS Oil & Fuel Spills Chemical Spills Manual Handling Slips, Trips and Falls High Pressure Water Slippery Surfaces Hazardous Chemicals Static Electricity Confined Space Barricading Congestion Lack of training or knowledge on equipment operations Lack of communication Pinch Points CONSEQUENCES Flora and Fauna Damage Eye Injuries Electric Shock Contract Disease Pinch injuries Workers understand the scope of works and control measures to be implemented
Spill kits to be on hand to combat any spillage of fuel or chemical
Hazardous Chemical, Manual handling, Confined spaces procedures and SWMS should be referred to, where applicable
Area is clear of obstructions and the ground is level where equipment is to be used or parked
PPE – Eye googles are compulsory when using high pressure equipment. Appropriate PPE for the equipment/task to be worn
Only certified equipment is to be used and all operators must be competent in the correct use of the equipment
High-pressure water equipment (cleaners or jetta) to be used in accordance with manufacturer’s instructions
Barricades and sign boards to be set and used in work areas. (e.g. High-pressure water cleaning in use)
Hoses/nozzles to be visually checked for nicks/cuts prior to use
Earth leakage devices to be used when connected to 240v
Water drainage is safe and connected to a safe drainage system
Any person entering a confined space has been trained and certified to enter. A confined space permit must be filled out before entry and all works conducted in accordance with the SWMS, Permit and procedures.
All workers have up to date vaccinations for hepatitis and other bacterial disease, when working with sewerage
Conduct Risk assessment if extra hazards and risks are identified
Vacuum units are correctly positioned and clear of hazards
Appropriate methods of communication set up between operators
Ensure no persons or property is at risk before operating Jetta.
Spotter to stand upstream of manhole to monitor progress of Jetta
When operating Jetta Unit ensure when releasing hydraulics, no loose fittings or appliances are near and there is no risk to others
Check pipes are empty or as near as, prior to removing bungs or cutting pipes
Ensure slack is taken up with hose before setting up sleeves on catch points
At completion of works check that all manhole and pits have been covered and that all materials or debris have been cleaned up
R1 = E24 If Control Measures are altered R2 rating must be reassessed R2 = L5
Other Activity:
Hazard / Risk Control Measures
HAZARDS CONSEQUENCES
R1 = If Control Measures are altered R2 rating must be reassessed R2 =
Civil Construction | SWMS
WORK SITE DETAILS
SWMS REVIEWS
WORKER ACKNOWLEDGMENTS
Civil Construction | SWMS
WORK SITE DETAILS
SWMS REVIEWS
WORKER ACKNOWLEDGMENTS
WORK SITE DETAILS
Project Start Date
Work area Duration
Task
Works Description
REQUIRED PPE:
Mandatory Task Specific
Gloves Hearing Protection
Hard Hat Face Shield – High Impact
Safety Glasses Harness
Steel Capped Boots Respiratory Protection, Fit Tested as required
Long Sleeve Hi Vis Shirt Other:
Long Pants Other:
DOCUMENTS REFERENCED AND CONSIDERATIONS
WHS Act 2011, WHS Regulations 2011 AS/NZS 1891.1 – Industrial Fall-Arrest Systems & Devices, Harnesses and Ancillary Equipment.
Workplace Management Plan AS/NZS 1716 – Respiratory Protective Devices
Working near OH and UG electrical Lines COP 2010 AS/NZS 1020 – The Control of Undesirable Static Electricity
Environmental Protection Act 1994 AS/NZS 3100 – Approval and Test Specification – General Requirements for Electrical Equipment
Hazardous Manual Tasks COP 2011 AS/NZS 3000 – Electrical Installations/Wiring Rules
Managing risks of Falls at Workplaces COP 2018 AS/NZS 1715 – Selection, Use & Maintenance of Respiratory Protective Equipment
Excavation Work COP 2013 AS/NZS 1020 – The Control of Undesirable Static Electricity
Managing risks of Plant in the Workplace COP 2013 AS 3190 – Approval and Test Specification – Residual Current Devices
EXTRACT BELOW FROM WH&S ACT 2011, Section 28
Duties of workers - Workers have a duty to take reasonable care for their own health and safety and that they do not adversely affect the health and safety of other persons. Workers must comply with any reasonable instruction and cooperate with any reasonable policy or procedure relating to health and safety at the workplace.” All workers who have been involved in the development of this SWMS and/or Risk Assessment and who will be required to follow the contents, must record their title, name and sign in the space provided below.
SWMS DEVELOPMENT CONSULTATION & ACKNOWLEDGEMENTS
We hereby confirm these SWMS have been developed in consultation with relevant workers and Site personnel and agree to comply with the documented precautions and control measures outlined within these SWMS.
Name Position Signature Date
SWMS Reviews
Date Reason for Review Reviewed By Comments / Changes Made
Initial site specific SWMS review
SWMS reviewed with workers
CIVIL CONSTRUCTION SWMS
I hereby acknowledge and confirm that the documented precautions and control measures will be complied with, as outlined in the documented SWMS.
Prerequisites and General Works Site Establishment & Survey Manual Handling
Electrical Safety (Tag and Lockout) Hazardous Chemicals Handling Gas Cylinders
Refuelling Mobile Plant Transport Plant
Unloading and Loading Maintenance of Plant Working near OH Power
Working Near UG Services Trenching & Excavating Installation of Trench Shields/Plates
Lifting Clearing and Grubbing Working adjacent to a Road
Working Adjacent to Water Hot Works Working at Heights – above 2m
Confined Space Pit Construction & Concreting Recovery of Bogged Vehicles
Demolition Asbestos Removal Quick Cut Saws
Angle Grinders Grit Sandblasting Welding
Name Company Signature Date
[word/footer1.xml]
IMS-10-25_P – Reviewed: August 2020 Document Uncontrolled When Printed Page 1 of 1
[word/footer2.xml]
99 Sandalwood Lane, Forest Glen Q 4556 | Phone: 07 5458 3300 | Fax: 07 5458 3388 | www.Shadcivil.com.au
ABN 68 162 606 377
[word/header1.xml]
Civil Construction SWMS
Civil Construction SWMS
[Attachment: image1.jpeg (image text)]
Se To Lo) gr
[Attachment: image10.png (image text)]
Erosion and sediment control plan
Key principle No. 3
Develop effective and flexible Erosion and
Sediment Control Plans based on the
anticipated soil, weather, and construction
conditions.
Erosion and sediment control plans (ESCPs)
need to walk a fine line between being formal
plans that site operators must follow, and
being flexible plans that still allow site
personnel to use their ‘common sense’ to:
e Adjust to changing site conditions.
e Focus on the intent of any technical notes
rather than their literal meaning.
[Attachment: image11.png (image text)]
Key principle No. 4
e This principle has many benefits,
including:
— reduced soil erosion
— reduced release of fine colloidal soil
particles that cause turbit runoff
— promotion of the rapid stabilisation and
revegetation of soil disturbances
Minimal disturbance of allotments
[Attachment: image12.png (image text)]
Key principle No. 5
e The proper management of stormwater
runoff during the construction phase is
critical to the implementation of effective
erosion and sediment control.
e The importance of stormwater
management generally increases with
increasing rainfall intensity.
e This means drainage control becomes
. ‘ increasingly important the closer you get
ua, to northern Australia.
Diversion of “clean” run-on water
[Attachment: image13.png (image text)]
Key principle No. 6
e Soil erosion is the process through which
the effects of wind, water, or physical
action, displace soil particles causing them
to be transported.
e The main factors affecting soil scour are
rainfall erosivity, soil erodibility, slope
length, slope steepness, soil cover, and
the surface flow conditions (i.e. flow type,
velocity, duration, and frequency).
Hydro-mulching
[Attachment: image14.png (image text)]
Blo supplied by Catchments & Creeks Ply Lid 9
Recently stabilised subdivision
Key principle No. 7
e Ahealthy and continuous vegetative cover
is one of the most effective forms of
erosion control.
e¢ Most importantly, vegetation protects the
soil against raindrop impact erosion.
e Vegetation also binds the underlying soil
to improve its structural strength, improves
the soil’s infiltration capacity, and
increases evaporation thereby decreasing
overall stormwater runoff.
[Attachment: image15.png (image text)]
Cea CMU Roa Al
Sediment basin
Key principle No. 8
e — Itis usually impractical to prevent all soil
erosion on construction sites; thus some
degree of sediment control is always
required.
e The primary purpose of most sediment
control measures is to trap the coarser
sediment fraction.
e Few sediment traps can capture fine
sediments; even fewer can reduce
turbidity levels in stormwater runoff.
[Attachment: image16.png (image text)]
e All ESC measures must be maintained in
proper working order at all times until their
function is no longer required.
e To assist in achieving this requirement,
technical notes and/or construction
specifications attached to the Erosion and
Sediment Control Plan (ESCP) must
Ee specify the maintenance requirements of
Photo suppligtby Catchments & Greeks Pty Ltd all sediment traps.
Site maintenance
[Attachment: image17.png (image text)]
Key principle No. 10
e Erosion and Sediment Control Plans
(ESCPs) are living documents that can
and should be modified as site conditions
change, or if the adopted measures fail to
achieve the required treatment standard.
e If a site inspection detects a failure in the
adopted ESC measures, then the source
of this failure must be investigated and
foto supplied by Catchments & Creeks Pty Ltd corrected.
Water samples
[Attachment: image18.png (image text)]
Always start at the top
Substitution
Training
[Attachment: image20.png (image text)]
WD
4 7
‘SPILL KIT
® Fai eoa|
Complete Take 5 / PTA Have spills ht, fire extinguisher Move to hard & fiat surface
and MSDS nearby sy
q(Gy
Turn ignition off
Remove sources of ignition Cool motor for 15 minutes
from re-fuelling are
$
Don’t use electronic devices Only re-fuel in ventilated Only re-fuel with 2 5t bottle
in the re-fuelling area areas, never in confined with an anti-s
nozzle
[Attachment: image21.jpeg (image text)]
Dump truck
Tractor scraper
Bulldozer
Articulated roller
Articulated loader
Excavator
[Attachment: image22.jpeg (image text)]
Powerline exclusion zones
[Attachment: image23.png (image text)]
@ 7 Oars
HOME INSERT DESIGN PAGELAYOUT REFERENCES MAILINGS REVIEW ‘VIEW —_DEVELOPER Rebecca Callow »
ou Arial | 7A Aay vie Lod MiFing -
Dm co vial A SoS 4aBbCel AaBbC AaBbC AaBbCel AaBbCel AaBbCel asabcce AMAL aaBeCe saBbCcL AaBbCeL AABBCC: =] | Be Replace
Paster ormat Painter Uva Ay wae 22-1 + | Emphasis Heading1 THeading4 THeading9 | TNormal | Strong Subtitle _—«‘TTitle.~—«‘TNoSpac... Subtle Em... IntenseE,. Quote _IntenseQ... Subtle Ref. Intense Re Ty Select
Clipboard & Font & Paragraph & styles Ealing
L 2 Gee RB ae Goce
by Code of Practice 2013 Nominal phase to | Untrained | Operating plant Vehicle operated by
phase voltage of person for | operated by iatrainod person for
3 This information paper is to provide guidelines and information to effectively control risks associated overhead uninsulated | the eloctric | untrained person for. | trang ns (ne)
with working near overhead power lines lectric lino line (mm) _| the electric line (mm)
Tow voltage (with
4) Excavators, cranes, pumping booms, elevated trays of tip trucks, extended survey staffs and ‘consultation with 1000 3000 600
person in control of
elevated working platforms etc. can all become electrically live if they come into contact with cipoced elects tne)
. overhead electrical cables. Failure to take care and follow safe working procedures around overhead ior volage (without
powerlines can result in people being killed consultation with
5 person in control of 3000 000 600
What is an Exclusion Zone? exposed electric line)
‘above low vollage, UP
4 An exclusion zone for plant or work being performed under or near an overhead powerline is the to 33KV (with
Zone in which you are not allowed to enter. consultation with 2000 3000 900
a person in control of
A Safety Observer is a person who has been assessed as competent, through the completion of a exposed electric line)
E! recognised training course, to carry out the duties of a safety observer and communicate with the pBiv ano
operator. The safety observer must have the sole task of safety observer, a safety observer is ‘consultation with 3000 3000 900
E required for each piece of plant operating within the safety observer zone. A safety Observer is an person in control of
5 authorised person. exposed electic line)
‘above 33KV up to 000 soo F100
a Safety Observer Zone is an area in which it is possible that any part of operating plant, a person 132K
working on an elevating work platform, or a load being moved could enter the exclusion zone of live shove 182kv upto 4500 6000 2900
5 electric lines or communication lines (cable, TV, internet, Telstra)
‘above 220KV up to 000 000 a0
Traini 275KV
x raining above 275kV up to
shove 6000 ‘6000 3400
A Authorised Persons, Instructed Persons and Safety Observers may allow the operation of plant ‘above S30KV up to yoo 00 ao
ei within reduced exclusion zones. Training of these employees in those competencies is essential 50OKV
F and is to be arranged by the Shadforths Compliance Team and must be approved by the electrical Nominal pole to earth | Untrained | Operating plant Vohicle operated by
3 entity, de voltage of fheelectric | ont y untrained person for
exposed electric line | tine (mm) | the electric line (mm)_| the electric line (mm)
Bi += 25 3000 3000 300)
B5KV 3000 3000) 2100
8 “150K 3000 3000 2100
33,000volts or 33 KV 27ORV 4500 6000 2900
4 “+ 350KV, 5000 ‘6000 2900
+1 400kV 6000 6000 3400
11,000 volts or 14
A —— 415 volts
ay —— Telecommunications
cable
a Approach Distances for Vehicles Nominal phase to phase ac. voltage (volts)
Approach distance (m)
4 Low voltage conductors up to 1000 - 0.6 metres
ee -—_—_+
: = Po
= Oe
(oa: E oe: ee: | a PENT
ima
(39 Shadtorths Civil Contract x
Rapidinduct Packages
x
) Company Status
iAuditor: Manage Teams x
iAuditor: Manage Teams x
1 Operating near poweriin x )/ $Y Electrical safety code of
CO @ Secure
Apps @) SafetyCulture: Mana
https://www.worksafe.qld.gov.au/_data,
}0-working-ne
erhead-uni
round-
Part2 Overhead uninsulated (exposed) electric
Division 2
Exclusion zones for authorised or instructed persons
Nominal phase
to phase voltage
of overhead
uninsulated
electric line
instructed person
for the electric
line (mmm)
‘Operating plant operated
bby authorised person or
instructed person for the
‘electric line, with safety
‘observer or another safo
system (mm)
Vehicle operated
by authorised
person or
Tow voltage
(No exclusion zone
prescribed)
1000
‘above low
voltage, up to
33kV
700
1200
‘above S3KV up to
‘SOKV
750
1300
‘above SOKV up to
66kV
1000
1400
‘above G6KV up to
110kV
1000
1800
‘above T10KV up
to 132k
1200
1800
‘above 132KV up
to 220kV.
1800
2400
‘above 220KV up
to 275k
2300
3000
‘above 275KV up
10 330kV
3000
‘3000
‘above S30KV up
10 400kV.
+3300
4000
+3300
‘above 400KV up
to 500kV,
3900
4600
‘3900
Nominal pole to
‘earth de voltage
of exposed
electric line
Authorised
porson or
structed person
for the electric
line (mm)
‘Operating plant operated
bby authorised person or
instructed person for the
‘electric line, with safety
‘observer or another safo
‘system (mm)
Vehicle operated
by authorised
person or
instructed person
F the electric
line (mm)
car
700
1200
700
+ BSR,
71000
1800
71000
+= 150KV,
1200
1800
1200
+ 27OKV
1800
72400
1800
“+7 350KV,
"2500
3200
72500
+1 400KV
2900
3600
2900
ESOPDF20 Electrical safely code of practice 2010 - Working near overhead and
underground electric ines
x
cu
PIPE)
[Attachment: image24.png (image text)]
"HE electricalsr13.pdf (SECURED) - Adobe Acrobat Reader DC ~ x
Shadforths Civil Contrac: x \ BS) Rapidinduct Packages x Company Status x iAuditor: Manage Teams iAuditor: Manage Teams X \ Jf Operating near powerlin. x / $Y Electrical safety code of
File Edit View Window Help
CS OO @ Secure | https://www.worksafe.qid.gov.au/_data/assets, 9676 /es-code-of-practice-20 orking-near-overhead-underground-electric-lines.pdf
Home Tools 05 Feb 2018 _ Mad. electricalsr13.pdf (S... * ® Signin
HE Apps @) SafetyCuture: Mane
®8HQ @O »/e# kt MOCO ™- RANT OF
@ Bookmarks x . . . . .
= Nominal poleto Untrained person Operating plant Vehicle operated Export PDF ¥
of wR earth dc voltage of for the electric line operated by by untrained ©) create PDF v
TS Bl aueenstand exposed electric (mm) untrained person person for the APPENDIX B_ EXCLUSION ZONES FOR OVERHEAD ELECTRIC
line for the electric line electric line (mm) = Edit PDF LINES
gd A Contents (mm) ‘These tables are reproductions from Schedule 2, Parts 2 and 3 of the ES Regulation.
> A Electrical Safety Comment Part 2 Overhead uninsulated (exposed) electric lines
Regulation 2013 +/- 25kV 3000 3000 900
4/- 85kV 3000 3000 2100 Tanmalgh > [UR ORRIN [ace pomcaiy
Organize Pages ¥ ‘overhead uninsulated | the electric | untrained person for
4/- 150kV 3000 3000 2100 : oes stcticine —_|oen__ct ie
+/- 270kV 4500 6000 2900 ns perenne
Fill & Sign Tow voltage (without
50kV 5000 6000 2900 a Seu
+/- 2
Creed sense)
+/- 400kV 6000 6000 3400 oS Sender Signature Ean
consultation with
Send & Track person in control of
< » ‘exposed electric line)
‘above low voliage, up
to 33kV (without
@® More Tools ‘consultation with
person in control of
exposed electric line)
‘above S3KV up to
above. 3000
‘above T32KV upto
220K 4500
‘above 220KV upto
275KV
‘above 275KV up to
aeoy ‘6000
‘5000
‘above S30KV up to
Soon ‘6000 8000
Nomina poet earn | Uanad | Oparaing lant
Page 208 Current as at 1 July 2015 Sepoaed sien troviecne | urrained prson for
exposed electric ine Tino mm) | the electri ine (nm)
Tea. 3000 3000 300
a BEV. 3000 3000 2100
180K 3000 3000 2100
®EZTOR 4500 6000 2300
#7 350K 5000 6000 2300
#7 a00K 5000 6000 3400
Store and share files in the
Document Cloud
ESOPDF20 Electrical safely code of practice 2010 - Working near overhead and Page 38 of 43
Learn More Underground elec ines
x
[Attachment: image25.png (image text)]
Major Hazard - UG Services - 4 P's.pdf - Adobe Acrobat Reader DC
File Edi View Window Help
Home Tools Major Hazard - UG...
e®8BQ in ALE
REMEMBER THE 4 P’s to AVOID SERVICE STRIKES
1. PLAN
+ Conduct A Prestart / Inspect the Site
Do Risk Assessment
Review DBYD / Reconcile site plans.
+ PLAN each day's work / Communicate with all workers
POSTIVELY IDENTIFY
+ Services within 3m must be positively Identified using vacuum excavation or hand
digging
Pothole to verify the location, depth and direction
Pothole Markers 100mm PVC Pipe inserted every 3-5
here a Tench roe merc wih a sane, must be Fuly Exposed & Visuay
Identified 500mm ether side of the
PROTECT
+) Where the Tench Profi intersects with a service, protec the area wih a Physical
Bamer
Erect Blue Baricading around the intersection area
Install Signage indicating lve underground service
PERMIT & PROCEED Pe =e and
Permits to be issued by Site Foreman BE orci Markers - 100m PVC poo &
{All Workers understand Permit Requirements Signsa ne Seater a
Al Workers Sign the Permit ener on
Permits are reviewed each day, with all workers
All services in works area must be located via vacuum excavation or hand digging and physically viewed
"Building sustainable communites trough groan * ©) | O@ cE & shadforth
| es
7 a HaoOe
® & signin @ p és i Certs) Blowers Ese
san cam tie CTPMD ee any ae rong 2 Beto
. > + * [ll THC > Fistitotnoc > Gonpines > Sey AetsandPubtone > 6 Wepre» DG Sev
DD Name - Dete modified Type Size
B opens 5 ta —_ , ti
sie “ (Major Hazard - UG Services -4P'spdf _22/09/2018931AM Adobe Acrobat D.. TRIKE
createpor v Dlnts UprticdandeyeendSaveed 2YG/20169308M Mews Wed. 22K
Edit PDF Pictures *
sade
Comment Civiconwesons
BM combine Files v Voc paca se
& orpboe
£1] organize Pages ¥
D ong 3 (BB CCF Awad Submis
(B.CCF Ana Subic
conn
© Pte Sn
B. Filsign
Send for Review
A More fools
= Files 0\chastonhs
eB New
Comyn and dt 05
aero re oe
stems tensed 18
Ste Tie
ee
ea
ve
[Attachment: image26.png (image text)]
if 1000 mm minimum a
[Attachment: image27.JPG (image text)]
Scenario 1- Double trench box or manhole box
Confined space regardless of whether end plates are n place. Harness to be worn by all workers attached to davit
‘arm while entering and exiting the box.
Han
excluded area
laddersafe
access platform
Ladder to be 2 rungs
above fixing point
Sandbags,
ramp to ladder
plate
“Greater than am
from top of boxto
the deepest part of
‘trench
[Attachment: image28.jpeg (image text)]
Davit arm fixed or
accessible within 20m
Hand rail or
‘excluded area.
platform
Ladder to be 2 rungs
above fixing point
--
--
‘Sandbag, ramp to
ladder platform
or both ends
Plate one end
[Attachment: image29.JPG (image text)]
Scenario 4- Single trench box or manhole box.
3m or less from top of box level to deepest part of trench. There must be no risk associated with engulfment or
hazardous atmospheres. This must be assessed in line with the code of practice. Must have graded / stepped access
at one end.
Hand rail or Ground Level
excluded area.
Hand rail or
excluded ares
Ladder tolbe 2 rungs
4 above fixing point
I t
q it
‘Sandbag ramp q it
‘access to optional 1 1
ladder q I} | Less than 3m
i) it
q it |
me-------- 1
|
Graded /
stepped access
[Attachment: image3.png (image text)]
@ shadrorith
[Attachment: image30.png (image text)]
Spotter
Ladden
straps
SCENARIO 1:
Pit with manhole form
[Attachment: image31.png (image text)]
Barricading
ms
rT
\
t
\
Ladder 1
‘
‘
Net
\
‘
t
\
t
‘
‘
\
¥
SCENARIO 2: uv
Not live less then 2m
[Attachment: image32.png (image text)]
_ Tripod
Bo
SCENARIO 3:
Not live
[Attachment: image33.png (image text)]
_ Tripod
BO
SCENARIO 4:
Pit live no aspro
\
‘
\
‘
‘
‘
\
‘
\
\
\
‘
1
\
‘
‘
\
4
[Attachment: image34.png (image text)]
SCENARIO 5:
Pit live with aspro
Confined space
[Attachment: image35.png (image text)]
[Never use the kickback zone of the power
Cutter which is the top outside quarter of,
Blade as per the diagram below
[Attachment: image37.jpeg (image text)]
DOUBLE EYE
PROTECTION
MUST BE WORN
[Attachment: image4.png (image text)]
Introduction to construction site erosion and sediment control
r SPs The objective
e To take all reasonable and practicable
measures to minimise short and long-term
soil erosion and the adverse effects of
sediment transport.
e In this context the terms:
— ‘reasonable’ means an action based on
sound judgement and affordable cost;
— ‘practicable’ means an action capable
of being put into practice with the
available means or with reason or
prudence.
roto s | by C its & Creeks Pty Ltd
Sediment-laden runoff from work site
[Attachment: image41.png (image text)]
@ shadrorth
[Attachment: image5.png (image text)]
Loose mulch displaced by storms
The first rule of ESC
The first thing to acknowledge within the
Erosion and Sediment Control profession
is that there is an exception to almost
every rule and recommendation.
The fact that a control measure is
observed to work well in one location does
not mean that it will work well in another
location.
Similarly, the fact that a control measure
fails in one region of Australia does not
mean that the technique will not be useful
within another region.
[Attachment: image6.png (image text)]
Environmental duty
e The Environmental Duty applies to all
persons.
e The Environmental Duty applies to all
activities on a construction site.
e Such an Environmental Duty may be
described in general terms as:
— To take all reasonable and practicable
measures to prevent or at least
minimise environmental harm.
Sediment released into ocean
[Attachment: image7.png (image text)]
Common sense gone missing!
Application of ‘common sense’
Erosion and sediment control practices
must represent an appropriate balance
between the application of the ideal design
philosophy and the application of common
sense.
No rule or recommendation should be
allowed to overrule the application of a
unique, site specific solution where such a
solution can be demonstrated to satisfy
the principle objective and the specified
performance standard.
[Attachment: image8.png (image text)]
Key principle No. 1
e Best practice development planning
involves the determination of the
appropriate use for a given site and how
best to accommodate that land use within
a development layout.
e To achieve this, it is essential to
investigate the site conditions including
the soil, water, vegetation and topographic
features of the property.
OR LAC CMM eras Ac
Development integrated into hillside
[Attachment: image9.png (image text)]
Key principle No. 2
e During the planning of a building or
construction project, consideration must
be given to how the site layout and
construction process can best achieve the
principal environmental objective of taking
all reasonable and practicable measures
to prevent or minimise environmental
harm.
Construction site