Decision Notice - 010.2008.00000610.001 [As Published] · 142008.610

of 6

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                  -3-



 Plan / Document No.       Rev.     Plan / Document Name                         Date
 08/24-1                            Working Drg       –   John    Norden     &   February 2008
                                    Associates
 GAD2                      0        Airberth Secured to Jetty Posts –            25 July 2004
                                    Airberth
 GAD1                      0        Airberth Secured to Jetty Posts –            25 July 2004
                                    Airberth

7     ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. Should any changes or modifications to the approved plans be required as a result of
   construction constraints, a Change to an Existing Approval Application under the Integrated
   Planning Act must be made. Amended plans clearly indicating the changes must be lodged with
   this application along with the appropriate fees.
2. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
   Local Law No. 12, prevents a builder or building contractor carrying out building work on a
   building site in a way that makes or causes audible noise to be made from the building work:-
    2.1. On a Sunday or public holiday, at any time; or
    2.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
    A maximum penalty of $1,500 applies to an offence under this legislation.
3. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the
    cost of operational works exceeds $80,000, then a portable long service leave levy is required to
    be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved
    form issued by the Building and Construction Industry (Portable Long Service Leave) Authority
    that confirms that the requirements of the Act have been satisfied. A statutory declaration
    outlining the cost of the operational works must be submitted to Council prior to the
    commencement of any works over the site.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES

Not applicable

9     PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable

                                                                                                 Page 3 of 6


[OCR of page images]
 

Plan /Document No. Rev. Plan/ Document Name Date

08/24-1 Working Drg — John Norden &_ February 2008
Associates

GAD2 0 Airberth Secured to Jetty Posts — | 25 July 2004
Airberth

GAD1 0 Airberth Secured to Jetty Posts — | 25 July 2004
Airberth

7 ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:

1. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a Change to an Existing Approval Application under the Integrated
Planning Act must be made. Amended plans clearly indicating the changes must be lodged with
this application along with the appropriate fees.

2. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-

2.1. On a Sunday or public holiday, at any time; or
2.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.

3. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the
cost of operational works exceeds $80,000, then a portable long service leave levy is required to
be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved
form issued by the Building and Construction Industry (Portable Long Service Leave) Authority
that confirms that the requirements of the Act have been satisfied. A statutory declaration
outlining the cost of the operational works must be submitted to Council prior to the
commencement of any works over the site.

Aboriginal Cultural Heritage Act 2003

There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.

The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. \t is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.

You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8 PROPERTY NOTES

Not applicable

9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable

Page 3 of 6

Used in these records

About this file

File size
54 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00000610.001 [As Published].pdf · 54 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.