Skip to the record
The gold standard in government transparency.

Original source · versioned page text

DA Form 1 OPW Application-2 Peppertree Cl

Attached to the e-mail Operational Works Application OPW21/0048 - 2 Peppertree Cl Marcus Beach.

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Section 2 — Further development details

7) Does the proposed development application involve any of the following?

 

 

 

 

 

Material change of use (1 Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot (1 Yes — complete division 2

Operational work [Wes — complete division 3

Building work (] Yes - complete DA Form 2 - Building work details

 

 

Division 1 ~ Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a

local planning instrument.
8.1) Describe the proposed material change of use

Provide a general description of the Provide the planning scheme definition | Number of dwelling | Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m?)
(if applicable)

     

 

 

 

 

 

 

8.2) Does the proposed use involve the use of existing buildings Oi ue
0 Yes
[I No

 

 

 

 

 

Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
9.1) What is the total number of existing lots making up the premises?

9.2) What is the nature of the lot reconfiguration? (tick al! applicable boxes)

    
  
  
 

 

(1) Subdivision (complete 10) (1 Dividing tand into parts by agreement (complete. 11))
(J Boundary realignment (complete 12)) CD Creating or changing an easement giving access to a lot
from a constructed road (complete 13))

 

 

 

 

  
  
   

10) Subdivision
10.1) For this development, how many lots are being created and what is the intended use of those lots:

   

Intended use of lots created Residential Commercial

 

Industrial Other, please specify:

 

 

 

Number of lots created

10,2) Will the Subdivision be staged?

(J Yes — provide additional details below
[C1 No

How many stages will the works include?

What stage(s) will this development application
apply to?

 

 

 

 

 

 

 

Page 4
DA Form 1 — Development application details
Version 1.3— 28 September 2020
Log in to download the original file

DA Form 1 OPW Application-2 Peppertree Cl.pdf · 4.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.