Council archive · source document
Response to Info_Request_stg5 REC14 0008 2-10-14 Callaghan Toth · REC14/0008
Attached to the e-mail REC14/0008 - Information Response.
Council Riparian Buffer Area on revegetation plan 1225-89a. This additional rehabilitation south of the mapped Riparian extent provides an offset area for other areas of Council mapping that are not practical to re-vegetate. e Rehabilitation Plans have been prepared detailing the weed control, planting and maintenance requirements for these riparian areas that will be rehabilitated. e It is considered that the Riparian Buffer Area as mapped on OM 3.1 is schematic to indicate areas to be assessed on the ground and determine areas to be protected. e The riparian buffer provided adjacent to Lots 14, 15 and 16 includes all the existing riparian vegetation along this watercourse, i.e there is no riparian vegetation in Lot 14, 15 and 16. Most of the site including these lots is grassed as a result of previous clearing and farming. e By providing generally 10m from top of bank and rehabilitating this area the development retains the existing habitat, maintains the existing wildlife corridor, maintains the stability of the watercourse, and will enhance its values by removing weeds and planting native species where infill planting is required. e As such it is considered that the Biodiversity Overlay has been complied with by providing a setback of a suitable distance to protect the values of the watercourse and riparian zone. And by rehabilitating this area the biodiversity values of this watercourse will be enhanced. e Therefore the boundaries to Lot 14, 15 and 16 will be changed as per plan 1225-89a. 3. Please provide a proposal plan with the Noosa Plan’s Biodiversity Overlay overlaid to provide clarity Response: Please refer to revegetation plan 1225-89a which shows the Biodiversity Overlay Riparian extent. Engineering and Hydrology 4. Provide a Flood Report for the development. Response: Please refer to Brisbane Stormwater Management (BSM) Flood Report dated 15-9-14. 5. The lot layout may require amending subject to Councils acceptance or other revision of the Stormwater Detention and Flood Report. Response: The Flood report has been recently revised to address Council concerns so allotment layout should not need to change. X:WOBSICT Projects in progress\1225 30 lots lake MacDonald Drive\Correspondence\Stage S\REC info req response\Response to C Info_Request_stg5 REC14 0008 17-7-14.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Info_Request_stg5 REC14 0008 2-10-14 Callaghan Toth.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.