Council archive · source document
Response to Info_Request_stg5 REC14 0008 2-10-14 Callaghan Toth · REC14/0008
Attached to the e-mail REC14/0008 - Information Response.
plan 1225-92a and long/cross section plan 1225-94a. The stormwater quality treatment device for stage 5 is a bio-retention basin, refer to plans 1225-61a and 1225-62a. The stormwater quality calculations for this bio- retention basin were previously provided Stormwater Quality Management Plan for REC13/0146 information request with our letter dated 24-4-14. This basin also has a detention component which is included in BSM flood report dated 15-9-14 Figure 12. 9. Provide amended plans that indicate the easements necessary to cater for the proposed lots, the adjoining properties and any existing services that traverse through the site. Response: Please refer to response and amended Plans from Max Watterson and Associates. Yours faithfully, Callaghan & Toth A Haynes BE Civil RPEQ (civil) MIEAust CPEng Please view www.callaghanandtoth.com.au for all information on our company profile and terms and conditions for services rendered X:WOBSICT Projects in progress\1225 30 lots lake MacDonald Drive\Correspondence\Stage S\REC info req response\Response to C Info_Request_stgS REC14 0008 17-7-14.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Info_Request_stg5 REC14 0008 2-10-14 Callaghan Toth.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.