Original source · versioned page text
Amended DA Form 1 OPW18-0118
Department of Infrastructure, Local Government and Planning
12) Boundary realignment
12.1) What are the current and proposed areas for each lot comprising the premises?
Current lot Proposed lot
Lot on plan description Area (m?) Lot on plan description Area (m?)
Gawain Cone mur arene nance ts
13) What are the dimensions and nature of any ous easements being er and/or any proposed: easement?
(Giicinei eevee Moe IR Reo = = =
Existing or Width (m) | Length (m) | Purpose of the easement? (eg. Identify the iand/lot( (s)
proposed? pedestrian access) benefitted by the easement
C
Division 3 — Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
14.1) What is the nature of the operational: work?
BQ Road work CO Stormwater CO Water infrastructure
(1 Drainage work C Earthworks C1 Sewage infrastructure
Landscaping (Signage (J Clearing vegetation
(2 Other - piease specify:
14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
(1 Yes — specify number of new lots:
No
14.3) What is the monetary value of the proposed operational work? (include GST, materials and labour)
$75,000
€ :
PART 4— ASSESSMENT MANAGER DETAILS
15) Identify the assessment manager(s) who will be assessing this development application
16) Has ‘the local government‘agreed to’apply.a’superseded planning scheme for this development application?
LD Yes — a copy of the decision notice is attached to this development application
L) Local government is taken to have agreed to the superseded planning scheme request — relevant documents
attached
KX] No
PART 5 — REFERRAL DETAILS
PRIA RP Ee ocemuley roses emo uel ace Mienccic Roe Cur eRe DiKunsnceee as
Note: A development application will require referral if prescribed by:the Planning Regulation:2017.
(J No, there are no referral requirements relevant to any development aspects identified in this development
application — proceed to Part 6
Matters requiring referral to the chief executive of the Planning Regulation 2017:
CO Clearing native vegetation
(J Contaminated land (unexploded ordnance)
Page 5
DA Form 1 — Development Application details
Version 1.0—3 July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Amended DA Form 1 OPW18-0118.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.