STORMWATER TREATMENT
AND
WATER QUALITY
MANAGEMENT PLAN

VERSION_3
FOR

PROPOSED ANIMAL HUSBANDRY TYPE 2
AT
136 TOP FORESTRY ROAD
RIGDEWOOD

SEPTEMBER 2013

 

Callaghan & Toth \

Civil, Environmental & N\
Hydraulic Engineers

A.B.N. 5905570314

8/41 Sunshine Beach Rd

Noosa Junction Q 4567
Telephone (07) 54749081
Facsimile (07) 54749041

JobNo: 1209

Document No.: 1209_VERSION_3
www.callaghanandtoth.com.au

»

 

 
Log in to download the original file

1209 SWQMP Report_3 2013.pdf · 4.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 113 pages

Page 2

                                                                                                            Callaghan & Toth

                                              DOCUMENT HISTORY

Document Reference:                                No: 1209 SWQMP Report_Version_3 2013.doc

Project Manager:                                   Max Watterson & Associates

Author:                                            Lex Toth NPER3 (ENV) (CIVIL) RPEQ 6069 CPESC

Reviewer:                                          Jane Davissen BE (ENV)

Client:                                            David Milligan

Contact Person:                                    David Milligan ((04) 0887-6864)



DISTRIBUTION LIST

                                                  POSITION ON
    NAME              ORGANIZATION                MANAGEMENT                REV          REV          REV       REV      REV
                                                     TEAM                    0            1            2         3        4


                       David Milligan                  Client                 1            1           1         1


Jane Davissen         Callaghan & Toth               Co Author                1            1           1         1


Max Watterson         Max Watterson &            Project Manager              1            1           1         1
                          Assoc.


                      Sunshine Coast           Assessment Officer             1                                  1
                      Regional Council




REVISION LIST

        REVISION                    DATE DISTRIBUTED                         ISSUED BY                        CHECKED BY

            0                           April 2013                                JD                             ADT
            19                         August 2013                                ADT                             JD
            2                        26 August 2013                               ADT                             JD
            39                       September 2013                               ADT                             JD

            The information contained in this report is confidential and proprietary to Callaghan and Toth. It
                may only be used by the person to whom it is provided, for the stated purpose for which it is
                provided, and must not be imparted to any third person without the prior written approval of
                Callaghan and Toth. Callaghan and Toth reserve all legal rights and remedies in relation to
                             infringement of its rights in respect of its confidential information.
                                              ©Callaghan & Toth
                                                      2013




                                                                                                                           1
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                                                         SWQMP_REV_3
September 2013

Page 3

                                                                                                                          Callaghan & Toth



CONTENTS

SUMMARY .............................................................................................................................................. 5
1. INTRODUCTION ............................................................................................................................ 6
2. DESCRIPTION ............................................................................................................................... 7
  2.1     Proposed Works ...................................................................................................................... 7
3. WATER QUALITY MANAGEMENT PLAN.................................................................................... 16
  3.1     Proposed On-Site Stormwater Treatment Process................................................................ 16
  3.2     MUSIC Model ........................................................................................................................ 17
     3.2.1     Source Nodes................................................................................................................ 17
     3.2.2     Treatment Nodes ........................................................................................................... 18
     3.2.3     Rainfall Data .................................................................................................................. 19
  3.3     MUSIC Modelling Results...................................................................................................... 19
     3.3.1     Water Quality Objectives ............................................................................................... 19
     3.3.2     Assessment of Results .................................................................................................. 20
4. WATER CYCLE MANAGEMENT PLAN ....................................................................................... 24
5    FLOODING ASSESSMENT REPORT.......................................................................................... 24
  5.1     Existing Conditions ................................................................................................................ 24
  5.2     Proposed Drainage System................................................................................................... 24
6. WASTE MANAGEMENT ASSESSMENT ..................................................................................... 26
  6.1     Potential Pollutants ................................................................................................................ 26
     6.1.1     Poultry Litter Application as Fertiliser/Mulch .................................................................. 27
     6.1.2     Poultry Litter Composting and Storage .......................................................................... 27
  6.2     Impact to Local Waterways.................................................................................................... 28
7. CONCLUSIONS & RECOMMENDATIONS .................................................................................. 30
APPENDIX 1            - WATER SENSITIVE DESIGN CODE ASSESSMENT (NOOSA PLAN) ..............A
APPENDIX 2           - PRELIMINARY STORMWATER QUALITY MANAGEMENT PLAN .....................B
APPENDIX 3            - MUSIC RESULTS .............................................................................................. C
APPENDIX 4            - SITE PHOTOS ................................................................................................... D
APPENDIX 5           - DETENTION BASIN RESULTS............................................................................F
APPENDIX 6           - SECURITY OF ROOFWATER SUPPLY CALCULATIONS................................. G
APPENDIX 7           - SECURITY OF DAM WATER SUPPLY CALCULATIONS .................................. H
APPENDIX 8           - SEDIMENT BASIN CALCULATION ......................................................................I




                                                                                                                                                2
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                                                                     SWQMP_REV_3
September 2013

Page 4

                                                                             Callaghan & Toth

LIST OF REFERENCES

1.       Aviagen, (2009), Ross Broiler Management Manual
2.       Myriad international Nutrient calculations proposed broiler production system 2nd
         August 2013
3.       Department of Agriculture, Fisheries and Forestry, Poultry Litter Information page,
         http://www.daff.qld.gov.au/27_15557.htm#top
4.       Department of Agriculture, Fisheries and Forestry, (2012) Queensland Guidelines –
         Meat Poultry Farms
5.       EN HEALTH (2004) Guidance on the Use of Rain Water Tanks.
6.       Engineers Australia (2006) Australian Runoff Quality. Australian Runoff Quality
         Guidelines.
7.       Healthy Waterways (2006) Water Sensitive Urban Design Technical Design
         Guidelines for South East Queensland
8.       Healthy Waterways (May 2010) Deemed to Comply Solutions – Stormwater Quality
         Management (South East Queensland)
9.       Queensland Development Code Part 4.3 (Oct 2008) Alternative Water Sources.
10.      University of California – Agriculture and Natural Resources, Bender, G. Fertilization
         Book 2, Chapter 2, http://ucanr.org/sites/alternativefruits/files/121293.pdf
11.      Water by Design, MUSIC Modelling Guidelines for South East Queensland – Version
         1 (December 2010)
12.      Wong, T., Breen, P. & Lloyd, S. (2000) Water Sensitive Road Design – Design
         Options for Improving Stormwater Quality of Road Runoff. CRC for Catchment
         Hydrology Technical Report No 00/1.
13.      Manual for Erosion and Sediment Control Version 1.3, Maroochy Shire Council 2008.

LIST OF FIGURES

Figure 1.1                 Site Location Plan……………………………………………….……… …8
Plan No. 01                Stormwater Quality Catchment Layout.……………………….…………9
Plan No. 02                Stormwater Quality Catchment Devices…………………….………….10
Plan No. 03                Stormwater Quality Treatment Devices…………………….…………..11
Plan No. 04                Stormwater Quality Treatment Devices ………………………………..12
Plan No. 09                Bunded Poultry Litter Composting Areas Layout….…………………..13
Plan No. 10                Bunded Poultry Litter Composting Areas Detail Plan…………………14
Plan No. 11                Stormwater Quality Treatment Devices……………...…………………15
Figure 3.1                 MUSIC Model for the Proposed Development…………………………21
Figure 3.2                 Typical Bioretention Basin……………………………….......................22
Figure 3.3                 Typical Swale Cross-section…………………………………………….23

LIST OF TABLES

Table 3.1                  MUSIC Catchment Areas for Sheds, Roads and Bunded Composting
                           Areas……………………. ………………………………………………..17

                                                                                          3
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                         SWQMP_REV_3
September 2013

Page 5

                                                                          Callaghan & Toth

Table 3.2                  Comparison of Load Reductions for Sheds and Roads.……………..19
Table 3.3                  Comparison of Load Reductions for Bunded Composting Areas.…..20
Table 5.1                  Pre-Development and Post Development Discharges………………..25
Table 5.2                  Pre Dam Spillway and Post Dam Spillway……………………………..25




                                                                                      4
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                      SWQMP_REV_3
September 2013

Page 6

                                                                           Callaghan & Toth


SUMMARY
The key points of this investigation are as follows:

    1. The proposed development consists of eight (8) new sheds to be used for meat
       Poultry production and associated infrastructure.
    2. Roof water runoff and dam runoff is to be recycled to provide Potable water for the
       poultry.
    3. Runoff from new access roads, car parks and landscaped areas around the buildings
       and Bunded Composting Areas is to be treated for nutrients and gross pollutants via
       Bioretention Swales, Basins, Swales and Buffers, located alongside the roads. The
       treated runoff will then be released as sheet flow within the site.
    4. The increase in pollutant loads due to the increase in impervious areas is to be
       attenuated.
    5. Waste management practices will be used to ensure there are no impacts to water
       quality of local waterways.
    6. Fertilising of existing Avocado trees utilising composted poultry litter (i.e. poultry
       manure mixed with bedding material) will replace the use of commercial fertilisers
       and suppression spraying/mulching on the existing Avocado farm.




                                                                                        5
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                       SWQMP_REV_3
September 2013

Page 7

                                                                             Callaghan & Toth


1.       INTRODUCTION
This report is provided in response to an Information Request for the MCU application –
Animal Husbandry Type 2 – Intensive and MCU for an Environmentally Relevant Activity
(ERA 4 – Poultry Farming) at 136 Top Forestry Road, Ridgewood for the Sunshine Coast
Regional Council. The Information request required:

     1. An Integrated Stormwater Management Plan that addresses the Noosa Plan - Water
        Sensitive Design Code, and
     2. A stormwater impact assessment and site based stormwater management plan, to
        identify potential water pollutants, proposed treatment trains and provision to address
        the Environmental Protection (Water) Policy 2008.

This report aims to address the concerns highlighted by Council and will assess the
proposed poultry farm against the following guidelines:

     •   Water Sensitive Design Code – the Noosa Plan
     •   Water Sensitive Urban Design Technical Design Guidelines for South East
         Queensland, published by Healthy Waterways
     •   Environmental Protection (Water) Policy 2008.

The Model for Urban Stormwater Improvement Conceptualization (MUSIC) has been used to
assess the suitability of various stormwater treatment devices and to model existing and
predicted pollution export loads and concentrations from the developed area of the site.




                                                                                          6
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                         SWQMP_REV_3
September 2013

Page 8

                                                                             Callaghan & Toth


2.       DESCRIPTION
The subject site is Lot 21 on SP226606 located at 136 Top Forestry Road, Ridgewood
(Refer Site Location Plan Figure 1.1). The site is bounded by West Cooroy State Forest to
the east, partly cleared rural properties to the west, Blackfellow Creek to the north and Top
Forestry Road to the south. This site is an existing commercial orchard, consisting of
approximately 7000 avocado trees.

2.1      Proposed Works
It is proposed to establish a poultry farm on site, which will include:
     ƒ Proposed new eight (8) sheds – each approximately100m x 16m in size.
     ƒ Construct formal gravel roads and carparking.
     ƒ Drainage swales.
     ƒ Replace the use of commercial fertiliser with the use of composted poultry litter (i.e.
         Poultry manure mixed with bedding material) to fertilise orchard trees. For further
         details refer to Preliminary Operational Plan and Myriad International Nutrient
         Calculation Report (submitted separately by MWA).
     ƒ Removal of dead birds off site.

As a result of these works stormwater drainage and treatment devices are required to drain
the development area, attenuate flows and treat stormwater runoff to acceptable levels.
Plans 02 to 04 and 09 to 11 show the catchments identified onsite and the treatment train
proposed for the site. To treat and manage water on site it is proposed for:
    • Roof water stored in rain water tanks and dam water is to be treated and then used
        to supply poultry drinking water. The rainwater tanks have been sized in accordance
        with Water by Design Music Guidelines Version 1, December 2010. The combination
        of dams and tanks has been sized to give 99% water supply security.
    • New access roads and carparks to drain to Bioretention Swales, Bioretention Basins,
        Swales and Buffers.
    • Bunded poultry litter composting areas are to be drained to Sediment Traps and then
        to Bioretention Basins before discharge to the orchard with overland flow directed to
        the dams.
    • Reserve bunded area is to be available for storage of poultry litter which exceeds the
        estimated amounts from the total number of sheds.
    • Overland flow from orchard to continue to be directed to existing dams on site.
In order to receive planning approval from Sunshine Coast Regional Council, this site must
demonstrate that it complies with the Noosa Plan - Water Sensitive Design Code and that
the storm water runoff will not change the surrounding hydrology.

Bioretention basins, Bioretention swales, Sediment traps, grass swales, vegetated buffers
and above-ground roof water tank units (for Poultry drinking water) are required for the site.
These stormwater treatment devices will enable the water quality objectives to be achieved.
Water reuse and water use minimisation will be designed in accordance with the guidelines.

To manage nutrient loads on site it is proposed:
   • To replace the current use of hand spreading slow release fertiliser and the use of
      weed suppression herbicides with the use of composted poultry litter (i.e. Poultry
      manure mixed with bedding material) to fertilise fruit trees.
   • Ensure poultry litter is composted and applied as per Myriad International Nutrient
      Calculations Report to ensure uptake is maximised and excess nutrients are not
      found in runoff.

                                                                                           7
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                         SWQMP_REV_3
September 2013

Page 9

 

WhereiS 4 © 2011

 

     

600m

en ________§_§.___s_se+,

a
sy
op ror

 

 

SITE OF
WORKS

 

 

eS
&
&
O
&
S
x
Q
S
eb
S
3 4
€ 2 4
g

 

 

Callaghan & Toth

.

Civil, Environmental &
Hydraulic Engineers

8/41 Sunshine Beach Road
P.O. Box 2305

NOOSA HEADS 4567

Ph: 54749081 Fox: 54749041
www.callaghanandtoth.com.au

project

STORMWATER QUALITY MANAGEMENT PLAN

location

136 TOP FORESTRY ROAD
RIDGEWOOD Q4563

 

SITE LOCATION PLAN

Figure 1.1

 

Source: WHEREIS Scale: NTS

 

Page 8

 

Page 10

 

 

 

re
7
AM 2 \
3305sqm }
ao ——Ay
rx
ys
~~.

 

ASSOCIATED 51sqm
SEDIMENT BASIN

=_
N 50sqm BIORETENTION
DAM 2 \ BASIN 3

 
 
    
  
  
   
 
  
   
  
 
    
 
 

 

 

 

 

 

 

 

FZ \3475sqm b N BUNDED POULTRY LITTER
NY wf \ COMPOSTING AREA THREE 100m
be ROWS TOTAL AREA 120m x 22.5m
hn

CMT A
11.36HA

 

RESERVE BUNDED POULTRY LITTER
COMPOSTING AREA ONE 76m ROW
TOTAL AREA 82m x 14m

 

 

 

 

ASSOCIATED 19sqm

SEDIMENT BASIN \
20sqm BIORETENTION \
BASIN 2

\ BUNDED POULTRY LITTER [>
COMPOSTING AREA TWO 55m
‘i ROWS TOTAL AREA 75m_x_19m

 

 

 

 

 

 

 

 

 
 
 
   
   
   
 
  

Callaghan & Toth )

. | Civil, Environmental &

\\y, Hydraulic Engineers
i! PO BOX 2305
NOOSA HEADS 4567
8/41 Sunshine Beach Road
Phone 54749081, Fax 54749041
www.callaghanandtoth.com.cu

designed [AH | datum AHD DERIVED

drawn MM . PSM. 120517
checked | ADT | Origin (B.M.)_ RL 187.09

 

 

 

 

 

 

approved
SURVEYED BY

MAX WATTERSON & ASSOCIATES
[pane 54 426 121

_————————————————is.
project

PROPOSED ACCESS ROAD TO
SHEDS AT LOT 21 ON
SP226606

ld

a
Client

 

DAVID MILLIGAN

—— )

title

STORMWATER QUALITY
CATCHMENT LAYOUT

a

LOT 21 on SP226606

Parish of TUCEKOI

County of MARCH
SUNSHINE COAST COUNCIL
Locality of RIDGEWOOD

$$

i.
SCALE

 

020 40 60 80 100 Meters 200
se eee

Scale SCALE SHOWN IS ORIGINAL DRAWING SCALE
1:4000(A3) 00_NOT SCALE FROM THIS DRAWING
USE ONLY DIMENSIONS PROVIDED

a
REVISIONS

 

 

 

 

 

 

 

 

 

 

ment] revision details date

A | ADD BUNDED TREATMENT 8-13

6 | AMMEND BUNDED TREATMENT 8-13

C | REVISED SEDIMENT BASIN NOTE 8-13

D |_REVISED PAGE NUMBER 9-13

V /
FILES

 

COMPUTER DIRECTORY
XAJOBS\CT\...

 

 

 

PAGE 9

Sheet 8 of 24 sheets
drawing number

PLAN Ot

 

 

 

 

 

 

\ date 1st MARCH 2013 )

 

 

 

 

Page 11

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

BUFFER CATCHMENTS Callaghan & Toth
4 0.0287Ha . | Civil, Environmental &
B 0.0799Ha ‘\\ Hydraulic Engineers
D 0.0832Ha uh PO BOX 2305
CATCHMENTS E 0.0714Ha N NOOSA HEADS 4567
- i a 8/41 Sunshine Beach Road
A 0.057Ha, I 0.0176Ho Phone 54749081, Fox 54749041
B 0.081Ha L 0.0227Ha | | www.callaghanandtoth.com.au
Cc 0.0771Ha M 0.0160Ha designed [AN] datum AHO DERWED
D 0.133Ha a 0.044SHa N drawn MM PSM 120517
E 0.194Ha P 0.0687Ha checked | ADT | Origin (B.M.) RL 187.09
F 0.162Ha Q 0.0133Ha | |
G 0.0475Ha R 0.0133Ha, approved
G-A 0.021Ha Ss 0.0142Ha SURVEYED BY
H 0.0697Ha V 0.0691Ha ; MAX WATTERSON & ASSOCIATES
T 0.0320Ha W 0.0474Ha S PHONE 54 426 121
K 0.1147Ha X 0.0975Ha fo oo
C 0.0676Ha 7 S project
M 0.0291Ha VY
N 0.0271Ha J PROPOSED ACCESS ROAD TO
o 0.354Ha /
ASSOCIATED 19sqm
P O.116Ha SEDIMENT BACIN 4 SHEDS AT LOT 21 ON
a 0.0215Ha 20sqm_ BIORETENTION 4 SP226606
R 0.0571Ha BASIN Y ———____—
$s 0.0486Ha Y DO
T 0.0471Ha J Client
U 0.1493Ha
V 0.154Ha DAVID MILLIGAN
W 0.166Ha
W-1 0.0434Ha RY)
X 0.2885Ha _————
title
STORMWATER QUALITY
CATCHMENT DEVICES
\ a
ROOF CATCHMENTS BUNDED POULTRY LITTER
2
SHED _1 0.16SHo. COMPOSTING AREA TWO 55m 1
SHED 2 0.165Ha ROWS TOTAL AREA 75m x 19m
SHED 3 0.234Ha
SHED 4 0.1815Ha LOT 21 on SP226606
SHED 5 0.160Ha .
SHED 6 0.165Ha Parish of TUCEKOI
SHED 7 0.160Ha County of MARCH
SHED 68 0.160Ha SUNSHINE COAST COUNCIL
o Locality of RIDGEWOOD
KR)
—————
SCALE
05 0 15 20 2 wes 50
—_—>_L L_~_eEaEaEEE>Ee>]™ELL_ _SSSSSS
scale SCALE SHOWN IS ORIGINAL DRAWING SCALE
1:1000(A3) [e"Gnuy DMENSIONS PROMDED

 

 

REVISIONS

A | ADD BUNDED TREATMENT

B | REVISED PAGE NUMBER

   
 

 

oe CATCHMENTS (REFER TO CATCHMENT

\ J& TABLE FOR CATCHMENT SIZE) ——
x \ & FILES

BUFFER ZONES (REFER TO BUFFER COMPUTER DIRECTORY
ZONE TABLE FOR BUFFER ZONE SIZE) X:\JOBS\CT\...
— i _ £0 DIRECTION PAGE 10

Sheet 9 of 24 sheets
drawing number

PLAN 02
\ date 1st MARCH 2013 )

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 12

 

 

 

—

Mot

wv.

\
|
A
an
l
|
HEDS |
- tl

=— =

 

 

PIPE OUTLET

( Callaghan & Toth )

| Civil, Environmental &
Hydraulic Engineers

PO BOX 2305

NOOSA HEADS 4567

8/41 Sunshine Beach Road

Phone 54749081, Fox 54749041

www.callaghanandtoth.com.au

designed] AH datum AHD DERIVED

drawn MM 7 PSM 120517
checked | ADT | Origin (B.M.) RL 187.09

 

 

 

 

 

 

approved
SURVEYED BY

MAX WATTERSON & ASSOCIATES
[Pre 54 426 121

_————————————————is.
project

PROPOSED ACCESS ROAD TO
SHEDS AT LOT 21 ON

SP226606
MY)
oF

Client

 

 

DAVID MILLIGAN

KD)
———

title

STORMWATER QUALITY

TREATMENT DEVICES

a

LOT 21 on SP226606

Parish of TUCEKOI
County of MARCH
SUNSHINE COAST COUNCIL

Locality of RIDGEWOOD

$$

i.
SCALE

 

0.5 10 15 20 25 Meters 50
See

Scale SCALE SHOWN IS ORIGINAL DRAWING SCALE
1:1000(A3) 00_NOT SCALE FROM THIS DRAWING
USE ONLY DIMENSIONS PROVIDED

 

 

REVISIONS

A | ADD BUNDED TREATMENT

B | REVISED PAGE NUMBER

 

———————
FILES

 

COMPUTER DIRECTORY
XAJOBS\CT\...

PAGE 11

Sheet 10 of 24 sheets

 

 

 

 

 

drawing number

PLAN 03

 

 

 

 

\ date 1st MARCH 2013 )

 

 

 

 

Page 13

 

 

 

 

PIPE OUTLET

   

| [designed [AH datum AHD DERIVED

MAX WATTERSON & ASSOCIATES
. [Pre 54 426 121

(OO

SS

 

( Callaghan & Toth )

| Civil, Environmental &
| Hydraulic Engineers

PO BOX 2305

NOOSA HEADS 4567

8/41 Sunshine Beach Road

Phone 54749081, Fax 54749041

www.callaghanandtoth.com.au

 

 

drawn MM 7 PSM 120517
checked | ADT | Origin (B.M.) RL 187.09

 

 

 

 

approved
SURVEYED BY

 

_————————————————is.
project

PROPOSED ACCESS ROAD TO
SHEDS AT LOT 21 ON
SP226606

——_

Client

DAVID MILLIGAN

KD)
———

title

STORMWATER QUALITY
TREATMENT DEVICES

a

LOT 21 on SP226606

Parish of TUCEKOI

County of MARCH
SUNSHINE COAST COUNCIL
Locality of RIDGEWOOD

$$

i.
SCALE

0.5 10 15 20 25 Meters 50
See

 

Scale SCALE SHOWN IS ORIGINAL DRAWING SCALE
1:1000(A3) 00_NOT SCALE FROM THIS DRAWING
USE ONLY DIMENSIONS PROVIDED

 

 

REVISIONS

A | REVISED PAGE NUMBER

 

———————
FILES

 

COMPUTER DIRECTORY
XAJOBS\CT\...

PAGE 12

Sheet 11 of 24 sheets
drawing number

PLAN 04
\ date 1st MARCH 2013 )

 

 

 

 

 

 

 

 

 

 

 

Page 14

 

 

 

Callaghan & Toth )

| Civil, Environmental &

\\y, Hydraulic Engineers
i! PO BOX 2305
\ NOOSA HEADS 4567
- , 8/41 Sunshine Beach Road

Phone 54749081, Fax 54749041
www.callaghanandtoth.com.cu

designed] AH datum AHD DERIVED

drawn MM . PSM. 120517
checked | ADT | Origin (B.M.)_ RL 187.09

   

 

OVERFLOW WEIR

 

 

 

 

 

OVERFLOW WEIR

 

   
  

approved
SURVEYED BY

MAX WATTERSON & ASSOCIATES
[pane 54 426 121

_————————————————is.
project

PROPOSED ACCESS ROAD TO
SHEDS AT LOT 21 ON

SP226606
MY)

a
Client

 

OVERFLOW WEIR

 

 

 

TO SECTION IN REPORT
19sqm SEDIMENT BASIN
1.5m DEEP

DAVID MILLIGAN

—— )

title

TYPICAL BUND DETAIL PLAN
*

|
a

LOT 21 on SP226606

Parish of TUCEKOI

County of MARCH
SUNSHINE COAST COUNCIL
Locality of RIDGEWOOD

$$
i.

     
 

BUNDED POULTRY LITTER
COMPOSTING AREA TWO SSm
ROWS TOTAL AREA 75m x 19m

 

SCALE
0.25 5 7.5 10 12.5 Meters 25
Sea
scale SCALE SHOWN IS ORIGINAL DRAWING SCALE

: DO NOT SCALE FROM THIS DRAWING
1:500(A3) USE ONLY DIMENSIONS PROVIDED

 

 

REVISIONS

TWO 55m LONG x 3m
WIDE x 1.5m HIGH
COMPOSTING MOUNDS

A | ADD BUNDED TREATMENT

B | REVISED PAGE NUMBER

 

FILES

 

COMPUTER DIRECTORY
XAJOBS\CT\...

PAGE 13

Sheet 9 of 24 sheets
drawing number

PLAN 9

B
\ date 1st MARCH 2013 )

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 15

 

 

 

 

0.5m HIGH TOPSOIL LANDSCAPED
MOUND WITH 150mm THICK TUB

MILL DECAYED MULCH TO SURFACE.
PROVIDE 251 BAG SIZED TREES AT 2m
CENTRES AND SHRUBS AT ALTERNATE
2m CENTRES. SEE ATTACHED NOOSA
COUNCIL SCHEDULE.

 

 

 

 

 

BUNDED POULTRY LITTER
COMPOSTING AREA TWO 55m
ROWS TOTAL AREA 75m x 19m

4.50

200mm THICH MEDIUM CLAY
CAP TO BUNDED AREA.

19.00

3.00 2.00 | 3.00 |

 

TYPICAL BUNDED POULTRY LITTER COMPOSTING SITE SECTION
1:100

4.50

 

Callaghan & Toth )

. | Civil, Environmental &

\\y, Hydraulic Engineers
i! PO BOX 2305
NOOSA HEADS 4567
8/41 Sunshine Beach Road
Phone 54749081, Fax 54749041
www.callaghanandtoth.com.cu

designed [AH | datum AHD DERIVED

drawn MM . PSM. 120517
checked | ADT | Origin (B.M.)_ RL 187.09

 

 

 

 

 

approved
SURVEYED BY

MAX WATTERSON & ASSOCIATES
[pane 54 426 121

_————————————————is.
project

PROPOSED ACCESS ROAD TO
SHEDS AT LOT 21 ON
SP226606

ld

a
Client

 

 

DAVID MILLIGAN

—— )

title

TYPICAL BUND CROSS SECTION
*

|
a

LOT 21 on SP226606

Parish of TUCEKOI

County of MARCH
SUNSHINE COAST COUNCIL
Locality of RIDGEWOOD

$$

i.
SCALE

0.05 1.0.1.5 2 25 Meters 9.0
See

 

Scale SCALE SHOWN IS ORIGINAL DRAWING SCALE
1:100(A3) 00_NOT SCALE FROM THIS DRAWING
USE ONLY DIMENSIONS PROVIDED

 

 

REVISIONS

A | ADD BUNDED TREATMENT

B | REVISED PAGE NUMBER

 

FILES

 

COMPUTER DIRECTORY

 

XAJOBS\CT\...

 

 

PAGE 14

Sheet 9 of 24 sheets
drawing number

PLAN 10
\ date 1st MARCH 2013 )

 

 

 

 

 

 

 

 

 

Page 16

 

 

 

 

ASSOCIATED 51sqm
‘SEDIMENT BASIN
50sqm BIORETENTION
BASIN 3

 

 

 

 

 

BUNDED POULTRY LITTER
COMPOSTING AREA THREE 100m
ROWS TOTAL AREA 120m x 22.5m

 

 

 

RESERVE BUNDED POULTRY LITTER
COMPOSTING AREA ONE 76m ROW
TOTAL AREA 82m x 14m

 

 

 

    
 

 

Callaghan & Toth )

. | Civil, Environmental &

\\y, Hydraulic Engineers
i! PO BOX 2305
NOOSA HEADS 4567
8/41 Sunshine Beach Road
Phone 54749081, Fax 54749041
www.callaghanandtoth.com.cu

designed [AH | datum AHD DERIVED

drawn MM . PSM. 120517
checked | ADT | Origin (B.M.)_ RL 187.09

 

 

 

 

 

 

approved
SURVEYED BY

MAX WATTERSON & ASSOCIATES
[prove 54 426 121

_————————————————is.
project

PROPOSED ACCESS ROAD TO
SHEDS AT LOT 21 ON

SP226606
MY)

a
Client

 

DAVID MILLIGAN

—— )

title

STORMWATER QUALITY

TREATMENT DEVICES

a

LOT 21 on SP226606

Parish of TUCEKOI

County of MARCH
SUNSHINE COAST COUNCIL
Locality of RIDGEWOOD

$$

i.
SCALE

0.5 10 15 20 25 Meters 50
Se

 

Scale SCALE SHOWN IS ORIGINAL DRAWING SCALE
1:1000(A3) 00_NOT SCALE FROM THIS DRAWING
USE ONLY DIMENSIONS PROVIDED

fF
REVISIONS

 

 

 

 

 

 

 

 

 

 

ment] revision details date

A | ADD BUNDED MULCH 6-13

6 | ALTER BUNDED MULCH 8-13

C | REVISED NOTE SEDIMENT BASIN 8-13

D |_REVISED PAGE NUMBER 9-13

V /
FILES

 

COMPUTER DIRECTORY
XAJOBS\CT\...

 

 

 

PAGE 15

Sheet 10 of 24 sheets
drawing number

PLAN 1 1
\ date 1st MARCH 2013 )

 

 

 

 

 

 

 

 

 

Page 17

                                                                              Callaghan & Toth

3.       WATER QUALITY MANAGEMENT PLAN
3.1      Proposed On-Site Stormwater Treatment Process

The developed site was divided into MUSIC model sub-catchments as shown on Plans 02 to
04. The proposed treatment train for the development site is illustrated on Plans 02 to 04
and 09 to 11 and listed below:

1. Bioretention Swales will treat the stormwater runoff from the access roads, car parks,
    from Catchment F. The Swale is 0.6m wide at the base and will be vegetated with
    effective nutrient removal plants. The treated runoff will then be directed to vegetated
    areas within the property which eventually drain to dams which use the collected water
    for irrigation of the Avocado trees. The bio-retention component of the swales will
    remove the nutrients, heavy metals, and retard flow.

2. Grass Swales will treat the stormwater runoff from grassed areas adjacent sheds,
    Catchments C, G, GA, H, T, U and W. The Swales will be 0.6m wide at the base and will
    not be vegetated with effective nutrient removal plants.

3. Bioretention Basins will treat the stormwater runoff from bunded composting areas,
    access roads, carparks and Catchment K and N. The Bioretention Basin’s sizes for the
    site are as follows:

     • Catchment K and N Bioretention Basin will be 55m2 in area.
     • The 70m long bunded composting area Bioretention Basin will be 20m2.
     • The 120m+87m long bunded composting area Bioretention Basin will be 50m2.
     The treated runoff will then be directed to vegetated areas within the property. The bio-
     retention component of the basins will remove the nutrients, heavy metals, and retard
     flow.

4. Grass Vegetated Buffers will treat the stormwater runoff from access roads and carparks
   from Catchments A, B, D, E, I, L, M, O, P, Q, R, S, V, W1 and X. The vegetated Buffers
   will be 5m wide for the length of each catchment and flow from the catchments will be via
   sheet flow.

5. Rainwater Tanks will be required to collect water from the new shed roofs. The tanks are
    to be above ground with an overflow pipe discharging to the adjacent swales which drain
    to on site dams used for irrigation. The tank capacity is to be adequate for the part
    supply of poultry water needs and to control humidity in the sheds.

6. Sediment Basins wet coarse Sediment Basins will be required to pre-treat runoff from the
    bunded poultry litter composting areas:

     •   The sediment basin area required for the 70m long bunded composting area is 19m2
     •   The sediment basin area required for the 120+87m long bunded composting area is
         51.1m2

     Calculations for sediment basins sizing are in Appendix 8.




                                                                                          16
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                          SWQMP_REV_3
September 2013

Page 18

                                                                                      Callaghan & Toth

3.2      MUSIC Model
3.2.1 Source Nodes

Catchment areas of source nodes within the proposed development have been identified as
sub-catchments such as roofs, carparks, roads and verge areas. MUSIC allows for the
characteristics of these source nodes to be amended to ensure that accurate pollution
generation and hydraulic characteristics are used to generate stormwater runoff within the
model. Table 3.1 below details the sub-catchments used in the MUSIC model, land use,
percent imperviousness and area of each sub-catchment. The MUSIC Modelling Guidelines
for South-East Queensland – Version 1 December 2010 have been used to set level of
imperviousness. The areas around the sheds have been related to a “Commercial” land use
and pollutant export parameters detailed in the Guidelines for this land use have been used
for each node. The composting areas have been related to an “Agricultural” land use.
Figure 3.1 shows the MUSIC model.


TABLE 3.1         MUSIC CATCHMENT AREAS (DEVELOPED)

             Catchment                               Land Use          Music Impervious      Area (ha)

  Shed Roof Area – To Rainwater
             Tanks                                   Commercial 100%                           1.39
             (Sheds 1 - 8)

 Gravel Roads and Carparks – to
Buffers (Catchments A, B, D, E, I, L,                Commercial 8             0%               1.68
    M, O, P, Q, R, S, V, W1, X)

 Grasses Areas, Gravel Roads – to
Swales (Catchments C, G, GA, H, T,                   Commercial            80 - 95%            0.58
             U, W)

    Gravel Road and Carpark to
                                                     Commercial              80% 0                 .16
 Bioretention Swale (Catchment F)

    Gravel Road and Carpark to
 Bioretention Basin (Catchment K &                   Commercial              80% 0                 .14
                 N)

Large composting poultry litter area                 Agricultural            90%               0.34

Small composting poultry litter area                 Agricultural            90%               0.15

             TOTAL                                                                            4.44ha


The Poultry sheds are not considered MUSIC catchment areas as the sheds will be
designed to ensure no nutrient rich runoff drains from the sheds.

The poultry litter composting area is to be a bunded and clay capped. The composting
poultry litter mounds will be covered and turned by machine while under tarps refer to
Appendix 4 composting photos 3 and 4. The remaining bare areas of the composite storage

                                                                                                    17
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                                   SWQMP_REV_3
September 2013

Page 19

                                                                              Callaghan & Toth

areas will be clay capped. These bunded composting areas are to drain to coarse wet
Sediment Basins and then to Bioretention Basins.

3.2.2 Treatment Nodes

The “MUSIC Modelling Guidelines for South East Queensland” Version 1 prepared by Water
by Design and dated December 2010 have been used to set the rainfall runoff parameters
and pollutant export parameters for the site.

The land use types used for this model were “Commercial” and “Agricultural” and the values
in Table 3.7 and Table 3.8 of the guidelines have been used in this model.

The Bioretention Swale provided for Catchment F will be 0.6m wide at the base, 3m wide
overall and 86m long and will be vegetated with effective nutrient removal plants. The filter
depth will be 0.5m and the extended detention depth will be 0.0m. It has a 1% grade flowing
into adjacent grassed areas. The size of this system has been designed in accordance with
Plan 03.

Grass Swales are provided for Catchments C, G, GA, H, T, U and W. The Swales will be
0.1m wide at the base and 4m wide overall and will not be vegetated with effective nutrient
removal plants. The swales will be grassed and have 1% grades and will flow into adjacent
grassed areas.

The Bioretention Basins will treat the stormwater runoff from access roads, carparks,
Catchments K and N, and bunded composting areas. The Bioretention Basins will be:

    •    For Catchment K and N will be 55m2 in area
    •    The 70m long Bunded Composting Site Bioretention Basin will be 20m2.
    •    The 120m+87m bunded composting area Bioretention Basin will be 50m2.
    •    The treated runoff will then be directed to vegetated areas within the property. The
         bio-retention component will remove the nutrients, heavy metals, and retard flow.

Vegetated Buffers are provided for Catchments A, B, D, E, I, L, M, O, P, Q, R, S, V, W1 and
X. Buffers will be 5m wide for the length of each catchment and flow from the catchments
will be sheet flow into the buffers.

Rainwater Tanks have been provided for the total roof catchments as shown on Plans No
1209-02 to 1209-04 and 09 to 11. 100% of the new eight sheds roof area of 1.39 hectares
will be connected to thirty two rainwater tanks. Each tank will have a capacity of 50,000
litres.

It is estimated by Inghams Queensland that in summer each shed will require 13,000 litres
for the cool shed pads cells and a average 9,819 litres for drinking water (ROSS Table 7)
i.e., 22,819 litres total daily use for 30,000 poultry (average shed size) therefore allow a
average 22,819 litres per shed per day. It is noted that sheds are not stocked all of the year
as there is a 2.5 week cleaning period after 7 weeks growing. As such the sheds are
stocked 71% of the year.
Therefore Total water requirements are:

    •    22,819 litres/shed/day x 8 sheds x 0.71=Total daily use of 130,394 litres.
    •    Total monthly use of 3,955,293 litres.



                                                                                          18
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                         SWQMP_REV_3
September 2013

Page 20

                                                                           Callaghan & Toth

Sediment Basins wet coarse Sediment Basins will be required to pre-treat runoff from the
Bunded Poultry litter Composting areas:

    •    The sediment basin area required for the 70m long bunded composting area is 19m2
    •    The sediment basin area required for the 120m+87m long bunded composting area
         is 51.1m2

3.2.3 Rainfall Data

The meteorological data used for the MUSIC Model was the data for Cooroy from 01/01/92 –
31/12/01. The mean Annual Rainfall for Cooroy          92 – 02 = 1585mm

The MUSIC Modelling Guidelines for South East Queensland – Version 1 December 2010
details that Cooroy data for 1973 to 1983 should be used. This data has an annual average
Rainfall of 1600mm. It is considered that the 10 year period from 1992 – 2002 has a
relatively close mean annual Rainfall to the recommended 10 year period and as such is
acceptable to use in this case.

3.3      MUSIC Modelling Results

The MUSIC modelling program has been used to investigate the performance of various
treatment options in the treatment train. MUSIC version 5 is capable of incorporating
rainwater re-use in the model. These features have been used in making comparisons
between different stormwater management systems for this report.


3.3.1 Water Quality Objectives

This model meets the pollution load reduction target as detailed in Water by Design Deemed
to Comply Solutions – Stormwater Quality Management (South East Queensland) version
1.0 – Table A-2. The following have been included in Appendix 3.
            • The treatment train effectiveness for the system.
            • The MUSIC Version 5 Summary Report.
The MUSIC modelling results indicate that the proposed additions to the farm can be treated
effectively by the proposed stormwater treatment train and this system will achieve
reductions in pollutant loads as detailed in Tables 3.2 and 3.3 below.

         TABLE 3.2:        COMPARISON OF LOAD REDUCTIONS FOR SHEDS & ROADS

             Parameter                             MUSIC       POLLUTANT
                                                 REDUCTION       LOAD
                                                  RESULT       REDUCTION
                                                                TARGETS
             Flow 34%
             Total Suspended Solids                  78% 80%
             Total Phosphorous                       59% 60%
             Total Nitrogen                          53%          45%
             Gross Pollutants                        54%




                                                                                      19
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                      SWQMP_REV_3
September 2013

Page 21

                                                                             Callaghan & Toth

         TABLE 3.3:        COMPARISON OF LOAD REDUCTIONS FOR BUNDED
                           COMPOSTING AREAS

             Parameter                             MUSIC       POLLUTANT
                                                 REDUCTION       LOAD
                                                  RESULT       REDUCTION
                                                                TARGETS
             Flow 3%
             Total Suspended Solids                   85%          80%
             Total Phosphorous                       58% 60%
             Total Nitrogen                           50%          45%
             Gross Pollutants                        100%


3.3.2 Assessment of Results

The developed site has been modelled as a series of “Commercial” and “Agricultural” sub-
catchments, which incorporate Water Sensitive Urban Design (WSUD) treatment trains. Plan
No’s 1209-02 to 1209-04 shows the proposed locations of the rainwater tanks, bio-retention
swales, bio-retention basins, grassed swales, and vegetated buffers.

The reductions listed in Table 3.2 above do not comply for Total Suspended Solids and Total
Phosphorus targets. The TSS reduction of the proposed treatment train is 78% which is
within a 2.5% error of reaching the 80% target. Given that the location of the Poultry sheds
is on the ridges of the property and treated stormwater runoff exiting the treatment train still
has to travel through vegetated areas (in the order of 100m to 500m) prior to reaching
surface waters, i.e. onsite dams, Blackfellow Creek, etc, the remaining suspended solids will
be removed while travelling over the vegetated existing farm land.

The Total Phosphorus results for the sheds and roads (Table 3.2) and Bunded composting
areas (Table 3.3) is a 59% reduction and 58% reduction respectively. The target is 60%,
which means the treatment train results are within a 2% error of reaching the 60% target.
Again as the treated stormwater runoff is travelling over 100m-500m through vegetated farm
areas to reach surface waters it is considered the small amount of phosphorus not removed
in the treatment devices will be treated in the onsite vegetated areas before entering local
waterways.

Therefore, it is considered that the proposed stormwater treatment system is currently
sufficient to reduce the pollutants prior to exiting the site.




                                                                                          20
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                         SWQMP_REV_3
September 2013

Page 22

 

 

 

Catchment 4, B. D & E - Gravel Carpark/Road
Catchment C

 

‘ass adj Shed |

Catchment F - Gravel Road/Parking

Buffer - Catch A.B.D.E Swale - Shed 1

   
    

Bioretention Swale 1

—@- ie

Swale - Shed 3 Catchment G & GA- Grass adi Shed 3

 

 

  
  
 

Roof Areas of Sheds 1-8 RWT G2 x 50,000)

Swale - Shed 6 Bioretention Basin 1
Buffer - Catch L.M.R.S.V.W1X
Catchment |, O,P & Q - gravel roads:

Catchment U- Grass adj Shed 6

Catchment K & N - gravel road

 

| Catchment L.M.R.S.Y v1_X - gravel roads
1 4 ‘i 4 Catchment T - gravel road_| |

 

 

   

Agnoul Agricuturs

Beretention - t é
Boretenton - 2

 

MUSIC MODEL FOR BUNDED COMPOSTING AREA

Recetving Node

 

Callaghan & Toth "STORMWATER QUALITY MANAGEMENT PLAN MUSIC MODEL

Civil, Environmental &

: : location
, | Hydraulic Engineers

136 TOP FORESTRY ROAD
8/41 Sunshine Beach Road RIDGEWOOD Q4563 .
NOOSA HEADS 4567 Figure 3.1

Ph: 54749081 Fax: 54749041
www.callaghanandtoth.com.au Scale: NTS

 

 

 

 

 

DATE: AUGUST 2013 21

 

Page 23

 

 

 

GARDEN EDGE 50mm BELOW LOWEST GROUND
LEVEL. SLOPE GRASS TO EDGE AT 1:4

 

 

GRATE 0.

BELOW

GARDEN
NS EDGE

 

PLANT OUT WITH
SPECIES AS PER
05 @6/SQM

 

 

 

 

 

 

 
 
 

 

 

   

 

TED

Ty VNVVVVVVVVVVVVVVVVV VY

& REFER TO IPWEAQ
9100 SLOTTED RIGID & a | WSUD-003
SEEPAGEPIPE SURROUNDED | © zZ | STANDARD
WITH 100mm LAYER OF 3 | DRAWING 050 DEEP
ow ..
2.5mm WASHED SCREENINGS 5 To500 SAND
| FROM SOUTH
7 PACIFIC
SANDS

 

 

 

 

 

 

f

 

 

010-4] |/-—-

 

REFER TO IPWEAQ STANDARD DRAWING:

100mm THICK 1mm #
[TRANSITION SAND LAYER

 

 

WSUD-O01A FOR FILTER CLOTH DETAILS

 

 

RAIN GARDEN SECTION (Typ.

SCALE NTS

11m BIO BASIN 1
6.7m BIO BASIN 2
16.7m BIO BASIN 3

 

GARDEN EDGE 50mm BELOW LOWEST GROUND
LEVEL SLOPE GRASS TO EDGE AT 1:4

 

 

 

 

 

Vi VV

| —] TREATED HS PINE TIMBER SLEEPER
RETAINING WALL

Vy V VV

 

 

 

 

 

 

é Spavovovo woe sayososnvouosavobovuyouasoLSbopagousuDEOba poe TOLD ToNaSOSoNOUDUSUOBOObOS

 

 

 

 

 

 

 

 

 

 

 

 

 

>
cs
Lo

 

 

e| |e
5m BO BASIN 1

I+ 3m BIO BASIN 2—=|
3m BIO BASIN 3

 

 

 

 

 

Nhe hed

 

Ah

 

 

L GRATED OVERFLOW PIT WITH 150UPVC

SW OUTLET. CONTRACTOR TO MEGAPOXY ALL JOINS

 

 

 

 

ROOFWATER TANK OUTLET PIPE

& PAVED AREA DRAINAGE OUTLET
PIPES-IL TO MATCH SAND SURFACE
LEVEL.

PLACE 0.4mx0.4m 1008 STONES RIVER
SCOUR PROTECTION.

 

 

 

RAIN GARDEN LAYOUT (Typ.

SCALE NTS

 

 

Callaghan & Toth

Civil, Environmental &

\ Hydraulic Engineers

8/41 Sunshine Beach Road

PO BOX 2305

NOOSA HEADS 4567

Ph: 54749081 Fax: 54749041
www.callaghanandtoth.com.au

project

ANIMAL HUSBANDRY

location

TOP FORESTRY ROAD RIDGEWOOD

TYPICAL BIORETENTION BASIN

Figure 3.2

 

 

Scale: NTS

DATE: August 2013

 

22

 

Page 24

 

 

[> 1-2m—F--0 60-1 ~im—

TUBE S70CK TOPSOIL & TURF
1S2000 SAND @8/sqm
0.20
VARIES> Ps evs
> :
SS WS “
0.3

 

0.1m DEEP COARSE SAND}
TRANSITION LAYER (0.5mm-2mm)

 

 

 

 

0.2m MINIMUM DEEP 5-2mm WASHED | 0.33 |
SCREENINGS & SLOTTED RIGID
SEEPAGE PIPES & 0.5% MIN GRADE.

TYPICAL BIORETENTION SWALE CROSS SECTION

SCALE NTS

 

Callaghan & Toth | “ANWAL HuseaNoRy TYPICAL BIORETENTION SWALE

Civil, Environmental & location

| Hydraulic Engineers TOP FORESTRY ROAD RIDGEWOOD

Q 8/41 Sunshine Beach Road .
yy NOOSA HEADS 4567 Figure 3.3

Ph: 54749081 Fax: 54749041
www.callaghanandtoth.com.au Scale: NTS DATE: August 2013 23

 

 

 

 

Page 25

                                                                                 Callaghan & Toth

4.       WATER CYCLE MANAGEMENT PLAN
This development has been designed in accordance with Deemed to Comply Solutions –
Stormwater Quality Management (South East Queensland) Version 1.0 – May 2010.

To this end, 100% of the new roof area of 1.39 hectares will be connected to thirty two (32)
rainwater tanks. Each tank will have a capacity of 50,000 litres.

The rainwater tanks will supply water to feed the poultry and will have a top up facility from
one of the five on-site dams.

It is estimated by Inghams Queensland that in summer each shed will require 13,000 litres
for the cool shed pads cells and a average 9,819 litres for drinking water (AVIAGEN Table 7)
i.e., 22,819 litres total daily use for 30,000 Poultry’s (average shed size) therefore allow a
average 22,819 litres per shed per day. It is noted that sheds are not stocked all of the year
as there is a 2.5 week cleaning period after 7 weeks growing. As such the sheds are
stocked 71% of the year.

Therefore Total water requirements are:

     •   22,819 litres/shed/day x 8 sheds x 0.71=Total daily use of 130,394 litres.
     •   Total monthly use of 3,955,293 litres.

Rainwater tank and dam supply capacity has been calculated in accordance with Appendix
B of EN Health Guidelines on the use of rainwater tanks.

The attached calculations in Appendix 6 show that the thirty two 50,000 litre tanks can
provide a 12.2% water supply security for the birds.

The attached calculations in Appendix 7 shows that the utilisation of just two of the seven
dams on site (each with a volume approximately 5000m3) can on its own supply 99% of the
required water supply for the Poultry’s.

 A minimum of 24 hours storage is required to ensure there is sufficient supply for the
Poultry’s in the case of electrical failure. The thirty two 50,000 litre tanks (1,600,000 litres)
provide 12.2% of the security of supply for the bird’s water requirements and provide 12
days storage at average usage.

The tanks will have a top up facility from two of the seven dams to ensure security of supply.

5        FLOODING ASSESSMENT REPORT
5.1      Existing Conditions

This site is not subject to ponding of floodwaters from the adjacent waterways and the Q100
year ARI flood levels. The buildings and carparks are above the Q100 year ARI flood levels.

5.2      Proposed Drainage System

The road surface level is proposed to be drained to either an underground drainage system
or to the verge via sheet flow. The road surface waters will discharge to the existing Avocado

                                                                                              24
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                             SWQMP_REV_3
September 2013

Page 26

                                                                                  Callaghan & Toth

Farm contour benches which form the existing catchment that drains all runoff to existing
dams at the base of each valley. The dams 1 & 2 shown on plan Plan 01 will have a 5m wide
broad crest weir spillway which will alternate flows to be equal to pre-development
concentrations.

The dam modifications have been modelled to act as a detention basin. The spillway size is
sufficient to reduce the increase in runoff from the roofs (Table 5.1) for a Q5, Q10 and Q100
storm back to predevelopment levels as shown in Table 5.2. Refer to attached Detail
detention basin calculations for Q10 Pre and Post development flow calculation for Dams
and Roofs in Appendix 5

         TABLE 5.1:        Pre-Development and Post Development Discharges

 Location                                            Q5              Q10                Q100
 Pre-Development Roof Area                       0.538 m3/s 0.638      m3/s 1.092           m3/s
                                                        3
 Post Development Roof Area                      0.769 m /s 0.851      m3/s 1.227           m3/s
                                                        3
 Roof Flow Increase                              0.231 m /s       0.221 m3/s          0.135 m3/s

         TABLE 5.2:        Pre Dam Spillway and Post Dam Spillway

 Location                                           Q5              Q10                  Q100
                                                       3
 Pre-Dam 1&2 Spillway                         2.200 m /s 2.58         m3/s 4.50             m3/s
 Post Dam 1&2 Spillway                       Spillway depth   Spillway depth        Spillway depth
                                                  0.24m            0.26m                 0.42m

                                                 1.81 m3/s        1.90 m3/s           3.49 m3/s
 Dam 1&2 Spillway flow                          -0.39 m3/s        -0.68 m3/s          -1.01 m3/s
 Decrease

The detention effects of Dam 1 & 2 spillways in all cases reduce the flows by more then the
increase in flow caused by the shed roofs.

As there are existing gravel roads already along the ridges the effect on runoff from the new
gravel roads is considered to be similar to the runoff from the existing roads.




                                                                                              25
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                             SWQMP_REV_3
September 2013

Page 27

                                                                                             Callaghan & Toth


6.       WASTE MANAGEMENT ASSESSMENT
6.1      Potential Pollutants

The proposed Poultry meat farm has the potential to generate pollutants from the following
sources:

ACTIVITY                POTENTIAL                    PROPOSED                COMMENTS
                        POLLUTANTS                   TREATMENT
Roads, carparking       Sediments, nutrients,        Bioretention basin,     The MUSIC model assesses the
                        heavy metals,                bioretention swale,     proposed treatment train for the
                                                     grassed swale,          increase in area of hardstand,
                                                                             pollutant generating areas and
                                                                             demonstrates that pollutant load
                                                                             reductions are achievable with the
                                                                             proposed treatment train.
Poultry Shed            Sediments and                Roofwater reuse tanks   Stormwater infiltration into the shed
                        nutrients                                            will not occur. The 75mm thick
                                                                             Poultry Litter absorbs the Poultry
                                                                             urine and therefore no pollutants
                                                                             from the Poultry will result from this
                                                                             activity.
Composted Poultry       Sediments and                Wet Sediment and        The bunded compost mounds will be
Litter Storage          nutrients                    Bioretention Basin      covered with tarps to ensure
                                                                             minimum stormwater infiltration into
                                                                             compost rows. The remaining
                                                                             Bunded area will be clay capped to
                                                                             minimise infiltration. The runoff from
                                                                             these areas will be treated via a Wet
                                                                             Sediment Basin and Bioretention
                                                                             Basin
Composted Poultry       Nutrients                    No treatment proposed   Refer to Myriad International Nutrient
Litter use on                                                                Production and Fertilising
Avocado trees                                                                Requirement Report and Preliminary
                                                                             Operational Plan
Dead Poultry            Nutrients, bacteria,         No treatment proposed   Dead poultry will be taken off site for
                                                                             appropriate disposal




                                                                                                            26
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                                        SWQMP_REV_3
September 2013

Page 28

                                                                               Callaghan & Toth


6.1.1 Poultry Litter Application as Fertiliser/Mulch

The proposal involves collecting the poultry litter (i.e. bedding material, such as
straw/shavings, and Poultry manure) and using it as a fertiliser and mulch for the existing
orchards on the site, following a composting process. The composted poultry litter will be
used to replace most of the commercial fertiliser, which is currently used to fertilise the trees.
This composted poultry litter will help increase topsoil depth on the orchard over the long
term. It will also reduce the need to spray for weeds around the trees due to ‘mulch’ effect of
the composted litter acting to suppress weeds.

Composted poultry litter can be a valuable resource to optimise pasture production. It is
mostly organic matter and supplies nutrients, helps hold moisture, improves soil structure
and encourages organisms such as earthworms. Composted poultry litter contains the
following main components:

        Nitrogen (N)
        Phosphorus (P)
        Potassium (K)

The Agronomist’s Report (Myriad International 2nd August 2013) states that:

     1. The analysis revealed that actual nutrient requirements of the 7000 tree Avocado
        orchard are greater than the nitrogen supplied by the litter and that additional
        manufactured fertiliser nutrient will be required to meet the demands of the avocado
        production system.

     2. Phosphorus contained in compost is predominately in the citrate form which is
        extremely stable in the soil and not water soluble. The citrate form of Phosphorus
        tightly binds to the soil and only a small percentage is available for crop uptake. The
        application of the compost will greatly reduce the potential movements of
        Phosphorus on the farm due to water runoff. This is compared to the standard
        practice of reliance on manufactured fertilisers which are water soluble Phosphorus
        based and move with water flows unless managed.

Refer to Myriad International Report for a comparison of the Calculated Litter to fertiliser
volumes and the Orchard fertiliser coverage volumes.

6.1.2 Poultry Litter Composting and Storage
The storage area for Poultry litter will be in bunded contained areas as shown on Plan 02 to
04 and 09 to 11. The mounds will be covered with tarps. The remaining Bunded area is to be
clay capped to ensure there is no stormwater entry to this area and therefore minimise
polluted stormwater runoff from this area. These areas will be treated to remove sediment
and nutrients with a system of wet Sediment Basins and Bioretention Basins.

The bunded areas will be able to store a volume of 1027m3 and will therefore be sufficient to
store litter from one complete clean out of all eight sheds for five (5) weeks prior to
application to avocado trees. The storage volume of 1027m3 has been calculated assuming
the use of a Seymour Compost turner 4000, which stockpiles at 2.5m3 per m of mound.

The eight sheds will have a 7 week growing cycle followed by a 2.5 week cleaning and
stocking cycle. This gives a 9.5 week total period between when new poultry litter is

                                                                                            28
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                           SWQMP_REV_3
September 2013

Page 29

                                                                               Callaghan & Toth

deposited in the bunded composting areas. The next batch of poultry litter is deposited in the
bunded composting Areas.

In normal periods of rainfall the Poultry Litter can be turned over by machine (refer to Photos
in Appendix 4) and over a period of 5 weeks to turn it into compost and also to reduce in
volume by two thirds.

As the Poultry litter is proposed to be used as mulch for weed suppression as well as a
fertiliser it is anticipated that the maximum period for composting will be five (5) weeks and
maybe less depending on the spread of litter break down.

The bunded areas have been sized to accommodate composting of the clean out of the
whole eight (8) sheds (area 13,695m2 x 0.075 = 1027.13m2).

The tarps which will cover the compost mounds should prevent rain infiltration and therefore
sufficient composting should be achieved between week one (1) and week five (5).

Reserve areas will be provided for storage of composting poultry litter if in the case the litter
depth in the sheds is found to be more than 0.075m. This reserve area is an extra 18.5% of
the original volume.

6.2      Impact to Local Waterways

Blackfellow Creek forms the northern boundary of the site and flows to the Mary River. This
creek is a Lowland Freshwater waterway under the Environmental Protection (Water) Policy
2009 – Mary River environmental values and water quality objectives – Basin No. 138
including all tributaries of the Mary River (July 2010). The EPP Water details the water
quality objectives for this waterway type, including:

    •    Total Nitrogen < 0.5 mg/L
    •    Total Phosphorus < 0.05mg/L
    •    Suspended Solids < 6mg/L

Management of the farm will include the following to ensure water quality of Blackfellow
Creek is not impacted by this use:
   • Stormwater runoff will be treated as per Section 3,
   • Composted Poultry litter will be used to fertilise avocado trees so there is no increase
       of nutrient application to the land.
   • Commercial fertiliser usage will be only used to top up and deficiency in the fertilizer
       supplied by the composted poultry litter.
   • Herbicide usage will be minimised as weeds will be suppressed by mulch effect of
       composted litter application around trees.
   • Poultry litter composting areas will be tarped, bunded and runoff will be treated via
       wet sediment basins and Bioretention basins.
   • Farm management will conduct soil and leaf analysis to ensure the composted
       poultry litter is supplying adequate ratios of nutrients and minerals to the trees.
   • The application of composted poultry litter will be managed to minimise the potential
       of the contamination of local waterways and will not be applied:
           o within 50 m of waterways allowing overland flow to reduce run-off volume and
               re-capture particulate contaminants in run-off;
           o during heavy rainfall periods to minimise contaminants in run-off;
           o on windy days to minimise inappropriate dispersal; and

                                                                                            28
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                           SWQMP_REV_3
September 2013

Page 30

                                                                             Callaghan & Toth

    •    Vegetated buffers to Blackfellow Creek will be maintained on site.
    •    Runoff from the majority of the avocado orchard (38 hectares) will continue to be
         directed to onsite dams.




                                                                                         29
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                        SWQMP_REV_3
September 2013

Page 31

                                                                             Callaghan & Toth


7.       CONCLUSIONS & RECOMMENDATIONS
The proposed development area can be treated by a treatment train consisting of:
   • rainwater reuse tanks,
   • b io-retention swales
   • bio-retention basins,
   • grass swales and
   • vegetated buffers.

This treatment train is capable of removing the nutrients and heavy metals from the
development area.

The rainwater tanks will supply poultry drinking water with backup supply from on-site dams.
Rainwater tanks and bioretention areas are able to attenuate the runoff concentrations to
current levels and so the development will not have an impact on the hydrology of the
receiving waters.

The use of composted poultry litter to fertilise the existing avocado trees will be managed to
ensure nutrient levels do not exceed current application rates of commercial fertiliser.

The water quality of Blackfellow Creek should not be impacted by this proposal, as
management of the site will reduce the risks of contaminants entering the creek.




                                                                                         30
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                        SWQMP_REV_3
September 2013

Page 32

                                                             Callaghan & Toth


APPENDIX 1                 -        WATER SENSITIVE DESIGN CODE
                                    ASSESSMENT (Noosa Plan




                                                                                A
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                SWQMP_REV_3
SEPTEMBER 2013

Page 33

                                                                                                                                                            Callaghan & Toth


APPENDIX 1                          -        WATER SENSITIVE DESIGN CODE ASSESSMENT (NOOSA PLAN)

SPECIFIC OUTCOMES                                          PROBABLE SOLUTIONS                                        PROPOSED SOLUTIONS
Water reuse
O1 Development uses a combination of detention and         S1.1 Development complies with the water quality          S1.1 The site is located within the Mary River catchment
retention systems to capture run-off from areas on the     standards in Table 2 of the SEQ Regional Plan             and adjacent to Blackfellow Creek. Blackfellow Ck is a
                                                                                                                     defined as a lowland freshwater on Plan WQ1381. The
site;                                                      Implementation Guideline No. 7 for Water Sensitive
                                                                                                                     EPP (Water) 2009 – Mary River environmental values and
AND                                                        Urban Design;                                             water quality objectives details that lowland freshwaters
                                                                                                                     have the following WQO’s:
O2 Water storage devices must have sufficient              S2.1 No solution provided                                 Turbidity < 50 ntu
capacity having regard to local rainfall pattern and the                                                             Suspended solids < 6 mg/L
catchment area of roof or other hard standing surface;                                                               Chlorphyll a < 5 ug/L
AND                                                                                                                  Total Nitrogen < 500 ug/L
                                                                                                                     Oxidised N > 60 ug/L
O3 Captured water is utilised for all non-potable uses     S3.1 Captured water is plumbed to be available for all    Ammonia N < 20ug/L
on site;                                                   external uses including gardening, irrigation, ponds,     Organic N < 420 ug/L
                                                                                                                     Total phosphorus < 50 ug/L
                                                           filling swimming pools and outdoor cleaning, as well      Fitlerable reactive phosphorus < 20 ug/L
AND                                                        as all ground floor toilet cisterns and washing           DO 85% - 110 % saturation
                                                           machine cold taps;                                        pH 6.5 – 8.0
                                                           AND
                                                                                                                     S2.1 and S3.1 & 3.2
                                                           S3.2 Where the captured water is used for toilet          Rainwater tank volume to be 1,600kL with backup supply
                                                           flushing and/or laundry use, an automatic or manual       from on-site dams to ensure sufficient water supply for
                                                           interchange device that allows alternate use of           Poultrys.
                                                           captured water or the reticulated water supply is
                                                           installed to ensure that there is a continual supply of
                                                           water for sanitary flushing and laundry use.

O4 On-site detention does not adversely impact on          S4.1 No solution provided
water requirements downstream of the site where the                                                                  S4.1 The site is 38 hectares in area and the proposal will
water is required to sustain the ecology and hydrology                                                               not affect runoff.
of downstream systems (environmental flows);
AND
                                                                                                                     S5.1 N/A
O5 Within the Shire Business Centre site, as shown         S5.1 No solution provided

                                                                                                                                                                            A
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                                  SWQMP_REV_3
SEPTEMBER 2013

Page 34

                                                                                                                                                         Callaghan & Toth

on Map SBC, on-site detention measures are
contained within the developed areas of the site, clear
of drainage lines and Open Space Precincts.
Run-off treatment                                                                                                 S6.1 Runoff will continue to exit the site as sheet flow. The
O6 Run-off that leaves the site is treated so as not to                                                           proposed stormwater treatment train for the Poultry farm
adversely impact on the ecology and hydrology of          S6.1 & S7.1 Development complies with the water         component will treat pollutants from increased hard-stand
downstream environmental flows;                           quality standards in Table 2 of the SEQ Regional Plan   areas. The avocado farm will not be fertilised with
                                                                                                                  composted Poultry litter rather than commercial fertilisers –
AND                                                       Implementation Guideline No. 7 for Water Sensitive      this will be managed to ensure nutrient levels are not
                                                          Urban Design.                                           increased on the site.
O7 Within the Shire Business Centre site, as shown
on Map SBC—                                                                                                       S7.1 N/A
a) run-off treatment occurs within the site ; and
b) drainage lines are only used for final polishing of
run-off.
Town water supply connections                             S8.1 A suitable backflow prevention device is           S8.1 N/A
O8 Backflow devices or similar systems ensure water       installed to protect the potable water within the
reuse facilities have no impact on the quality of the     reticulated water supply in accordance with AS/NZS
town mains water.                                         3500:2003 Plumbing and Drainage.
Use of natural treatments and systems
O9 Natural treatment strategies, including grass                                                                  S9.1 Proposed stormwater treatment for the works include
swales and bio-retention systems, vegetated filtration    S9.1 & S10.1 Development complies with the water        bioretention basins, bioretention swales, grassed swales,
strips and gross pollutant traps, are used wherever       quality standards in Table 2 of the SEQ Regional Plan   grassed buffers and rainwater tanks.
practicable;                                              Implementation Guideline No. 7 for Water Sensitive
AND                                                       Urban Design.                                           S10.1 N/A

O10 Within the Shire Business Centre, as shown on
Map SBC— where necessary, drainage lines are
ecologically enhanced to ensure that the water quality
polishing functions are of high standard.




                                                                                                                                                                          B
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                                SWQMP_REV_3
SEPTEMBER 2013

Page 35

                                                            Callaghan & Toth


APPENDIX 2                 -        PRELIMINARY STORMWATER QUALITY
                                    MANAGEMENT PLAN




                                                                             B
1209 Animal Husbandry – Top Forestry Rd, Ridgewood             SWQMP_REV_3
SEPTEMBER 2013

Page 36

                                                                                     Callaghan & Toth


APPENDIX 2 -    PRELIMINARY STORMWATER QUALITY
MANAGEMENT PLAN


                            BIORETENTION BASINS & SWALES
ISSUES                   PROCEDURES

                                                 Design Phase

Objective                To design low maintenance effective stormwater treatment devices to achieve a
                         no-worsening result over the existing pre-development situation in the creeks
                         adjacent the site.

Actions                  Consulting Engineer to design Bioretention systems in accordance with:
                              ¾   Bioretention Systems requirements as outlined in the “Water by Design –
                                  Construction and Establishment Guidelines” Version 1 dated February
                                  2009 prepared by Healthy Waterways
                              ¾   Calculations as per BBC Water Sensitive Road Design Guidelines.
                         Consulting Engineer is to ensure that the Bioretention systems are:
                              ¾   located in a suitable area,
                              ¾   sized according to guidelines,
                              ¾   provided with the appropriate construction materials, subsoil drainage
                                  and outlet pipe, and
                              ¾   incorporated into a stormwater treatment system also including gross
                                  pollutant traps, sediment traps etc.

Monitoring               Consulting Engineer to ensure that operational works drawings reflect
                         requirements of this Integrated Water Management Report.
                         Council is to review the Operational Works Plan.

Reporting                Consulting Engineer to provide Integrated Water Management Report with
                         Operational Works application.
                         Design Engineer to provide Operational Works drawings in accordance with
                         requirements.
                         Council is to review the Operational Works Plan and provide relevant
                         documentation relating to application.

Incidents                The Bioretention systems are not approved according to submitted plans.

Corrective Actions       The Consultant will amend the design or placement of the Bioretention Systems
                         to reflect Council’s requirements and design guidelines.
                         Major changes will require amendment to MUSIC model to assess whether
                         changes have affected treatment train effectiveness.
                         Amend treatment train characteristics to ensure that water quality objectives are
                         achieved.




                                                                                                    B
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                                  SWQMP_REV_3
SEPTEMBER 2013

Page 37

                                                                                        Callaghan & Toth

                                             Construction Phase

Objective                The Contractor will install the Bioretention System in accordance with the
                         Operational Works drawings.

Actions                  Bioretention systems to be constructed at the end of civil works for the
                         development.
                         Bioretention systems used for sediment basins during civil works construction
                         shall have sediments removed prior to layout of bioretention zone.
                         Construct Bioretention systems in accordance with steps as detailed in “Water by
                         Design – Construction and Establishment Guidelines: Swales, Bioretention
                         Systems and Wetlands” Version 1 dated February 2009.
                         Contractor to conduct regular watering of all planted bioretention systems until
                         such time as plants are established.
                         Contractor to ensure bioretention systems are protected from sediment laden
                         stormwater runoff during construction period or only install once upstream
                         catchment is stabilised.

Monitoring               The Contractor will carry out weekly inspections of the Bioretention system
                         (Including three monthly during the defects liability period). The following will be
                         examined at each inspection:
                         ¾    Sediment build up on the surface
                         ¾    Health of vegetation
                         ¾    Pondage during major storms not infiltrating into the sand
                         ¾    Erosion at the outlet
                         ¾    Pondage during minor storms

Reporting                Contractor to maintain a log of inspections, watering and other actions.
                         Records are to be logged and kept for verification of compliance on a need basis.
                         Bio-retention designer / Engineer shall perform inspections during construction
                         stage and fill out Water by Design forms for compliance.

Incidents                ¾    Bioretention systems not installed correctly
                         ¾    Sediment builds up on the surface of systems.
                         ¾    The vegetation dies off.
                         ¾    Pondage of water is in excess of one hour.
                         ¾ E rosion occurs.
                         ¾    Pondage of water occurs at every minor rainfall event.
                         ¾    Weed growth occurs.

Corrective Action        Contractor to amend installation to ensure it complies with Operational Works
                         drawings.
                         The Contractor will check up stream sediment control and fix failures. The
                         sediment build up will be shovelled off the non-woven geotextile of the
                         Bioretention systems. The geotextile will be replaced at the beginning of the
                         defects liability period
                         Unsuccessful plantings will be replaced as required. A normal allowance of 10%

                                                                                                       C
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                                    SWQMP_REV_3
SEPTEMBER 2013

Page 38

                                                                                      Callaghan & Toth

                         should be made for unsuccessful plantings. Ensure watering rates are adequate
                         and increase if necessary.
                         Replace geotextile where used, check and if necessary replace sand media with
                         coarser sand. Check that slotted pipe is not blocked and outlet free draining.
                         Replace and repair where necessary.
                         Erosion should be repaired and investigate measures to reduce erosion e.g.
                         install rock spalls upstream of the erosion so as to dissipate the flow across a
                         broad area.
                         Dominating weeds should be removed by hand and taken to the Council’s Refuse
                         Centre.

                                              Operational Phase

Objective                The Owner is to include the Bioretention systems into their maintenance
                         program.



Actions                  Inspect Bioretention systems every six months to determine maintenance
                         requirements.
                         Undertake general maintenance such as:
                              ¾   Remove accumulated litter / debris
                              ¾   Remove accumulated sediments
                              ¾   Remove weeds and dead plants
                              ¾   Replace plants where necessary
                              ¾   Water plants if necessary
                              ¾   Control erosion and sediment loss upstream or within system where
                                  necessary.
                         Routine clean outs of Bioretention Systems should be planned on a ten-yearly
                         basis.

Monitoring               The Owners Landscape Gardener will carry out six monthly inspections of the
                         Bioretention Systems. The following will be examined at each inspection:
                              ¾   Sediment build up on the surface under the river stones
                              ¾   Health of vegetation
                              ¾   Pondage during major storms not infiltrating into the sand
                              ¾   Erosion at the outlet
                              ¾   Pondage during minor storms

Reporting                Inspection Records are to be logged and kept for verification of compliance on a
                         need basis.
                         Records of any maintenance are to be logged and kept on site.
                         Records of environmental incidents and corrective actions should be kept on site
                         and Council notified of any problems.

Incidents                Sediment builds up on the surface.
                         The vegetation dies off.



                                                                                                     D
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                                   SWQMP_REV_3
SEPTEMBER 2013

Page 39

                                                                                       Callaghan & Toth

                         Pondage of water is in excess of one hour.
                         Excessive erosion occurs within the system.
                         Pondage of water occurs at every minor rainfall event.
                         Weed growth occurs.

Corrective Action        The Owners Landscape Gardener will check up stream sediment control and fix
                         failures. The sediment build up will be removed without damage to existing
                         vegetation.
                         Unsuccessful plantings will be placed as required. A normal allowance of 10%
                         should be made for unsuccessful plantings.
                         Ensure watering rates are adequate and investigate plants with higher drought
                         tolerances if significant numbers of plants die during dry periods.
                         Replace geotextile, check and if necessary replace sand media with coarser
                         sand. Check that slotted pipe is not blocked and outlet free draining. Replace and
                         repair where necessary.
                         Erosion should be repaired and investigate ways to reduce erosion occurrence
                         e.g. place rock spalls upstream of the erosion so as to dissipate the flow across a
                         broad area.
                         Dominating weeds should be removed by hand and taken to the Council’s Refuse
                         Centre.



                                       RAINWATER TANKS
ISSUES                   PROCEDURES

                                                Design Phase

Objective                Ensure that rainwater tanks have sufficient water capacity to supply the
                         designed potable needs.


Actions                  The Consulting Engineer is to ensure that:
                              •   Tanks are sized in accordance with this Integrated Water Management
                                  Plan.
                              •   Appropriate first flush diversion systems are installed on tanks
                              •   Rainwater tanks are installed with stainless steel mesh guards on any
                                  inlet and exit points
                              •   Tank overflows are to a stabilised point to prevent erosion
                              •   Tanks are fitted with an appropriate top up system, to allow
                                  supplementary dam water supply once tanks reach 10% capacity.
                                  There should be a suitable ‘air-gap’ provided between the top water
                                  supply level in the tank and the supplementary supply to prevent
                                  backflow.

Monitoring               Developer is to review the Works Plans and Building Plans.

Reporting                Works Plans and Building Plans are to be provided to consultants, developer
                         and contractor.


                                                                                                     E
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                                   SWQMP_REV_3
SEPTEMBER 2013

Page 40

                                                                                       Callaghan & Toth

Incidents                The Rainwater Tanks are not approved according to submitted plans.

Corrective Actions       The Consultant will redesign the Rainwater Tank system to address any
                         concerns.
                         Major changes will require further Stormwater Quality Management Modelling.

                                            Construction Phase

Objective                The Contractor will install the Rainwater Tank system to ensure non potable
                         supply.



Actions                  Builder to install tanks as part of construction and connect to the roof or
                         stormwater drainage system when the building and access roads / carparks
                         are complete.
                              •   Builder to install tanks in accordance with manufacturer’s
                                  specifications.
                              •   Plumber to connect tank in accordance with applicable
                                  Plumbing/Building Codes.
                              •   Plumber to connect tank overflow to the Bioretention system or to a
                                  location that that will not cause excessive erosion.



Monitoring               Council to review Plumbing application for tank installation from a certified
                         plumber.
                         Builder to review Plumbing application to ensure with requirements of this
                         IWMP.
                         Builder to assess that rainwater / stormwater tank systems are correctly
                         installed as per requirements.

Reporting                Plumbing approval to be logged and kept for verification of compliance on a
                         need basis

Incidents                Approval is not granted for plumbing application.
                         Rainwater /Stormwater tanks are not installed correctly.
                         Overflows are not installed correctly.
                         Float switch alarm is not installed correctly.

Corrective Action        Builder / plumber to review application and change to address issues raised.
                         Builder / plumber to re-install parts of rainwater / stormwater tank system that
                         are faulty and ensure they are installed as per manufacturer’s specifications
                         and requirements of this IWMP.

                                              Operational Phase

Objective                Ensure that rainwater / stormwater dam system is operating effectively and
                         providing non-potable water supply to the centre.
                         Ensure that rainwater / stormwater dam system is not providing a breeding
                         habitat for mosquitos.


                                                                                                         F
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                                   SWQMP_REV_3
SEPTEMBER 2013

Page 41

                                                                                           Callaghan & Toth

Actions                  Owner to maintain rainwater / stormwater dam systems as follows and conduct
                         six monthly inspections:
                              •   Check gutters for leaf litter
                              •   Check stainless steel mesh guards are in place
                              •   Check first flush system is functioning
                              •   Check overflow is not causing any scour
                              •   Check float switch is functioning
                         Owner to also conduct periodic assessments (approx. 5 to 10 years) to
                         determine whether sediments deposits require removal from within the tank.

Monitoring               Owner to monitor rainwater tank systems as detailed above.



Reporting                Records are to be logged and kept for verification of compliance on a need
                         basis.

Incidents                     •   Rainwater tanks has been removed or disconnected
                              •   Rainwater tank system is faulty e.g. roof, guttering, first flush system or
                                  tank is damaged.
                              •   Overflow has been disconnected from absorption trench
                              •   Overflow is causing scour.
                              •   Rainwater tank capacity is insufficient for demand.

Corrective Action        Owner will be required to :
                              •   Reinstall or connect rainwater tank
                              • Main    tain rainwater tank system
                              •   Reconnect overflow to absorption pit (if exist on lot)
                              •   Stabilise overflow discharge area or move to more appropriate
                                  location.
                         Owner to investigate providing extra roof area for rainwater collection to allow
                         installation of extra rainwater tanks.
                         Owner to investigate treating excess stormwater from access roads and
                         carparks to potable water quality to meet demands.



                                     VEGETATED BUFFERS
ISSUES                   PROCEDURES

                                                Design Phase

Objective                Ensure that vegetated buffers are maintained with vegetated cover and
                         overland flowpaths are maintained as sheet flow.




                                                                                                       G
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                                    SWQMP_REV_3
SEPTEMBER 2013

Page 42

                                                                                       Callaghan & Toth

Actions                  The Consulting Engineer is to ensure that:
                              •   Buffers are sized in accordance with this Integrated Water
                                  Management Plan.
                              •   Buffers drain evenly and do not concentrate flows.

Monitoring               Developer is to review the Works Plans and Building Plans.

Reporting                Works Plans and Building Plans are to be provided to consultants, developer
                         and contractor.

Incidents                The Buffers are not approved according to submitted plans.

Corrective Actions       The Consultant will redesign the Buffer system to address any concerns.
                         Major changes will require further Stormwater Quality Management Modelling.

                                            Construction Phase

Objective                The Contractor will install the Buffers to ensure overland flow is evenly
                         distributed.

Actions                  Contractor to construct buffers as per the plans and ensure:
                              •   Buffers are well vegetated with no bare earth.

Monitoring               Design Engineer to review buffer construction to ensure in accordance with
                         design plans.

Reporting                Operational Works approval to be logged and kept for verification of
                         compliance on a need basis

Incidents                Approval is not granted for Operational Works application.
                         Buffers not adequately stabilised with vegetated cover.

Corrective Action        Contractor to review application and change to address issues raised.
                         Contractor to grass-seed or turf buffer to achieve required vegetation cover.

                                              Operational Phase

Objective                Ensure that vegetated buffer system is operating effectively and providing
                         treatment of overland sheet flow from catchments around Poultry farm.

Actions                  Owner to maintain vegetated buffers as follows and conduct six monthly
                         inspections:
                              •   Check for areas of erosion
                              •   Check for areas of concentrated flow
                              •   Check for vegetation cover over buffer area

Monitoring               Owner to monitor vegetated buffer systems as detailed above.



Reporting                Records are to be logged and kept for verification of compliance on a need

                                                                                                      H
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                                    SWQMP_REV_3
SEPTEMBER 2013

Page 43

                                                                                     Callaghan & Toth

                         basis.

Incidents                     •   Areas of erosion indicate concentrated flow or lack of vegetation cover



Corrective Action        Owner will be required to :
                              • Re    instate vegetation
                              •   Address areas of erosion including altering surface levels to improve
                                  drainage of buffer and ensure sheet flow is maintained.




                                                                                                     I
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                                  SWQMP_REV_3
SEPTEMBER 2013

Page 44

                                                              Callaghan & Toth


APPENDIX 3                          -        MUSIC RESULTS




                                                                           C
1209 Animal Husbandry – Top Forestry Rd, Ridgewood           SWQMP_REV_3
SEPTEMBER 2013

Page 45

12/04/2013 10:18:13 AM

Receiving Node

Treatment Train Effectiveness
Flow (ML/yr) Peak Flow (m3/yr) TSS (kg/yr) TP (kg/yr) TN (kg/yr) Gross Pollutants (kg/y
Sources 45.3 0.614 10.953 21.5 145 981
Residual Load 29.7 1.61 2.38E3 8.82 67.3 454
-162.0 78.1 58.9 53.7 53.8

% Reduction 34.4

Page 46

Source nodes
Location                                                         Roof Areas of Sheds 1-8
                                                                                       Catchment A            B                       D & E - Gravel Carpark/Road       Catchment C - Grass adj Shed 1      Catchment F - Gravel Road/Parking         Catchment G & GA - Grass adj Shed 3      Catchment H - Grass adj Shed 4      Catchment I                     O
ID                                                                                   1                      5                       6                                 7                                   8                                         9                                       10                                 12                              14                           17
Node Type                                                        UrbanSourceNode       UrbanSourceNode        UrbanSourceNode         UrbanSourceNode                   UrbanSourceNode                     UrbanSourceNode                           UrbanSourceNode                          UrbanSourceNode                     UrbanSourceNode                 UrbanSourceNode
Total Area (ha)                                                                  1.39                 0.465                   0.077                             0.162                               0.069                                       0.07                                    0.524                              0.688                           0.142                       0.047
Area Impervious (ha)                                                             1.39         0.371580901             0.004120987                       0.129453991                         0.003692833                               0.003442918                               0.420999142                        0.543815279                     0.111625408                 0.037761373
Area Pervious (ha)                                                                   0        0.093419099             0.072879013                       0.032546009                         0.065307167                               0.066557082                               0.103000858                        0.144184721                     0.030374592                 0.009238627
Field Capacity (mm)                                                                 80                    80                       80                               80                                   80                                        80                                       80                                 80                              80                           80
Pervious Area Infiltration Capacity coefficient - a                               243                   243                      243                              243                                  243                                       243                                      243                                243                             243                          243
Pervious Area Infiltration Capacity exponent - b                                   0.6                   0.6                      0.6                              0.6                                  0.6                                       0.6                                      0.6                                0.6                             0.6                          0.6
Impervious Area Rainfall Threshold (mm/day)                                          1                      1                       1                                 1                                   1                                         1                                        1                                   1                               1                           1
Pervious Area Soil Storage Capacity (mm)                                            18                    18                       18                               18                                   18                                        18                                       18                                 18                              18                           18
Pervious Area Soil Initial Storage (% of Capacity)                                  10                    10                       10                               10                                   10                                        10                                       10                                 10                              10                           10
Groundwater Initial Depth (mm)                                                      50                    50                       50                               50                                   50                                        50                                       50                                 50                              50                           50
Groundwater Daily Recharge Rate (%)                                                  0                      0                       0                                 0                                   0                                         0                                        0                                   0                               0                           0
Groundwater Daily Baseflow Rate (%)                                                 31                    31                       31                               31                                   31                                        31                                       31                                 31                              31                           31
Groundwater Daily Deep Seepage Rate (%)                                              0                      0                       0                                 0                                   0                                         0                                        0                                   0                               0                           0
Stormflow Total Suspended Solids Mean (log mg/L)                                   1.3                 2.43                     2.16                             2.43                                 2.16                                      2.16                                     2.43                               2.43                            2.43                         2.43
Stormflow Total Suspended Solids Standard Deviation (log mg/L)                   0.38                  0.38                     0.38                             0.38                                 0.38                                      0.38                                     0.38                               0.38                            0.38                         0.38
Stormflow Total Suspended Solids Estimation Method               Stochastic            Stochastic             Stochastic              Stochastic                        Stochastic                          Stochastic                                Stochastic                               Stochastic                          Stochastic                      Stochastic
Stormflow Total Suspended Solids Serial Correlation                                  0                      0                       0                                 0                                   0                                         0                                        0                                   0                               0                           0
Stormflow Total Phosphorus Mean (log mg/L)                                      -0.89                   -0.3                   -0.39                              -0.3                               -0.39                                     -0.39                                      -0.3                               -0.3                            -0.3                         -0.3
Stormflow Total Phosphorus Standard Deviation (log mg/L)                         0.34                  0.34                     0.34                             0.34                                 0.34                                      0.34                                     0.34                               0.34                            0.34                         0.34
Stormflow Total Phosphorus Estimation Method                     Stochastic            Stochastic             Stochastic              Stochastic                        Stochastic                          Stochastic                                Stochastic                               Stochastic                          Stochastic                      Stochastic
Stormflow Total Phosphorus Serial Correlation                                        0                      0                       0                                 0                                   0                                         0                                        0                                   0                               0                           0
Stormflow Total Nitrogen Mean (log mg/L)                                         0.37                  0.37                     0.37                             0.37                                 0.37                                      0.37                                     0.37                               0.37                            0.37                         0.37
Stormflow Total Nitrogen Standard Deviation (log mg/L)                           0.34                  0.34                     0.34                             0.34                                 0.34                                      0.34                                     0.34                               0.34                            0.34                         0.34
Stormflow Total Nitrogen Estimation Method                       Stochastic            Stochastic             Stochastic              Stochastic                        Stochastic                          Stochastic                                Stochastic                               Stochastic                          Stochastic                      Stochastic
Stormflow Total Nitrogen Serial Correlation                                          0                      0                       0                                 0                                   0                                         0                                        0                                   0                               0                           0
Baseflow Total Suspended Solids Mean (log mg/L)                                      0                  0.78                    0.78                              0.78                                0.78                                      0.78                                     0.78                                0.78                            0.78                        0.78
Baseflow Total Suspended Solids Standard Deviation (log mg/L)                        0                  0.39                    0.39                              0.39                                0.39                                      0.39                                     0.39                                0.39                            0.39                        0.39
Baseflow Total Suspended Solids Estimation Method                Stochastic            Stochastic             Stochastic              Stochastic                        Stochastic                          Stochastic                                Stochastic                               Stochastic                          Stochastic                      Stochastic
Baseflow Total Suspended Solids Serial Correlation                                   0                      0                       0                                 0                                   0                                         0                                        0                                   0                               0                           0
Baseflow Total Phosphorus Mean (log mg/L)                                            0                  -0.6                     -0.6                             -0.6                                 -0.6                                      -0.6                                     -0.6                               -0.6                            -0.6                         -0.6
Baseflow Total Phosphorus Standard Deviation (log mg/L)                              0                   0.5                      0.5                              0.5                                  0.5                                       0.5                                      0.5                                0.5                             0.5                          0.5
Baseflow Total Phosphorus Estimation Method                      Stochastic            Stochastic             Stochastic              Stochastic                        Stochastic                          Stochastic                                Stochastic                               Stochastic                          Stochastic                      Stochastic
Baseflow Total Phosphorus Serial Correlation                                         0                      0                       0                                 0                                   0                                         0                                        0                                   0                               0                           0
Baseflow Total Nitrogen Mean (log mg/L)                                              0                  0.32                    0.32                              0.32                                0.32                                      0.32                                     0.32                                0.32                            0.32                        0.32
Baseflow Total Nitrogen Standard Deviation (log mg/L)                                0                    0.3                     0.3                               0.3                                 0.3                                       0.3                                      0.3                                 0.3                             0.3                         0.3
Baseflow Total Nitrogen Estimation Method                        Stochastic            Stochastic             Stochastic              Stochastic                        Stochastic                          Stochastic                                Stochastic                               Stochastic                          Stochastic                      Stochastic
Baseflow Total Nitrogen Serial Correlation                                           0                      0                       0                                 0                                   0                                         0                                        0                                   0                               0                           0
OUT - Mean Annual Flow (ML/yr)                                                   17.7                   5.42                   0.578                              1.89                               0.518                                     0.526                                     6.11                                7.98                            1.65                       0.548
OUT - TSS Mean Annual Load (kg/yr)                                                519             2.14E+03                       119                               746                                 108                                       114                                2.40E+03                           3.13E+03                               646                         216
OUT - TP Mean Annual Load (kg/yr)                                                3.06                   3.72                   0.318                              1.28                               0.285                                     0.287                                       4.2                               5.36                              1.1                      0.374
OUT - TN Mean Annual Load (kg/yr)                                                56.5                   17.7                    1.85                              5.99                                1.65                                      1.64                                     19.3                                25.9                            5.27                        1.72
OUT - Gross Pollutant Mean Annual Load (kg/yr)                                    418                    126                    2.12                                 44                                 1.9                                     1.92                                      142                                 186                            38.3                        12.8
Rain In (ML/yr)                                                              19.3805                6.48342                  1.0736                           2.25874                           0.962055                                       0.976                                 7.30604                             9.59267                         1.97988                   0.655314
ET Loss (ML/yr)                                                              1.63448                1.06074               0.494796                            0.36955                           0.443388                                  0.449814                                   1.19533                             1.60745                       0.331771                    0.107214
Deep Seepage Loss (ML/yr)                                                            0                      0                       0                                 0                                   0                                         0                                        0                                   0                               0                           0
Baseflow Out (ML/yr)                                                                 0                      0                       0                                 0                                   0                                         0                                        0                                   0                               0                           0
Imp. Stormflow Out (ML/yr)                                                   17.7461                 4.7493              0.0491528                             1.6546                           0.044046                                 0.0446843                                   5.35191                              6.9391                          1.4322                   0.480037
Perv. Stormflow Out (ML/yr)                                                          0            0.672949                0.529314                          0.234447                            0.474321                                  0.481195                                  0.758334                             1.04546                       0.215778                   0.0680185
Total Stormflow Out (ML/yr)                                                  17.7461                5.42225               0.578467                            1.88904                           0.518367                                  0.525879                                   6.11024                             7.98456                         1.64798                   0.548056
Total Outflow (ML/yr)                                                        17.7461                5.42225               0.578467                            1.88904                           0.518367                                  0.525879                                   6.11024                             7.98456                         1.64798                   0.548056
Change in Soil Storage (ML/yr)                                                       0           0.0004259                0.000335                         0.0001484                           0.0003002                                 0.0003046                                   0.00048                          0.0006617                       0.0001366                    4.31E-05
TSS Baseflow Out (ML/yr)                                                             0                      0                       0                                 0                                   0                                         0                                        0                                   0                               0                           0
TSS Total Stormflow Out (ML/yr)                                              519.493                2139.69                  119.35                           746.366                             107.878                                   113.643                                  2398.92                             3129.87                         646.059                     215.777
TSS Total Outflow (ML/yr)                                                    519.493                2139.69                  119.35                           746.366                             107.878                                   113.643                                  2398.92                             3129.87                         646.059                     215.777
TP Baseflow Out (ML/yr)                                                              0                      0                       0                                 0                                   0                                         0                                        0                                   0                               0                           0
TP Total Stormflow Out (ML/yr)                                               3.06025                3.71868               0.317937                             1.2792                           0.285374                                  0.287323                                   4.19683                             5.35557                         1.10496                   0.374267
TP Total Outflow (ML/yr)                                                     3.06025                3.71868               0.317937                             1.2792                           0.285374                                  0.287323                                   4.19683                             5.35557                         1.10496                   0.374267
TN Baseflow Out (ML/yr)                                                              0                      0                       0                                 0                                   0                                         0                                        0                                   0                               0                           0
TN Total Stormflow Out (ML/yr)                                               56.5077                17.6745                 1.84527                           5.99225                              1.6514                                   1.64106                                  19.3308                             25.9208                         5.27412                     1.72399
TN Total Outflow (ML/yr)                                                     56.5077                17.6745                 1.84527                           5.99225                              1.6514                                   1.64106                                  19.3308                             25.9208                         5.27412                     1.72399
GP Total Outflow (ML/yr)                                                     417.975                126.172                 2.11676                           43.9569                             1.89683                                   1.92432                                  142.181                             185.563                         38.2993                     12.7529

No Imported Data Source nodes

USTM treatment nodes
Location                                                         RWT (32 x 50         000)              Bioretention Swale 1 Buffer - Catch I                         O                                   P                                        Q                                           Buffer - Catch L                    M                                 R
ID                                                                                  2                 4                    11                                    13                                 15                                        16                                         19                                  21                                22                           23
Node Type                                                        RainWaterTankNode BioRetentionNodeV4 BufferNode              BufferNode                              BioRetentionNodeV4                  BufferNode                               SwaleNode                                   SwaleNode                           SwaleNode                         SwaleNode
Lo-flow bypass rate (cum/sec)                                                       0                 0                                                                                              0                                                                                    0                                   0                                 0                            0
Hi-flow bypass rate (cum/sec)                                                   100               100                                                                                              100
Inlet pond volume                                                                   0
Area (sqm)                                                                       760                 55          1178.797597                          2229.642644                                69.44                              1857.904506
Extended detention depth (m)                                                      0.2                 0                                                                                            0.3                                                                                  0.5                                 0.5                               0.5                          0.5
Permanent Pool Volume (cubic metres)                                           1600
Proportion vegetated                                                                0
Equivalent Pipe Diameter (mm)                                                    849
Overflow weir width (m)                                                            10               2.8                                                                                              2                                                                                                                                                         40                           40
Notional Detention Time (hrs)                                              5.62E-02
Orifice Discharge Coefficient                                                     0.6
Weir Coefficient                                                                  1.7               1.7                                                                                            1.7
Number of CSTR Cells                                                                2                 3                                                                                              3                                                                                    10                                  10                                10                           10
Total Suspended Solids - k (m/yr)                                                400             8000                                                                                            8000                                                                                 8000                                8000                              8000                         8000
Total Suspended Solids - C* (mg/L)                                                 12                20                                                                                             20                                                                                    20                                  20                                20                           20
Total Suspended Solids - C** (mg/L)                                                12                                                                                                                                                                                                     14                                  14                                14                           14
Total Phosphorus - k (m/yr)                                                      300             6000                                                                                            6000                                                                                 6000                                6000                              6000                         6000
Total Phosphorus - C* (mg/L)                                                    0.13              0.13                                                                                            0.13                                                                                 0.13                                0.13                              0.13                         0.13
Total Phosphorus - C** (mg/L)                                                   0.13                                                                                                                                                                                                   0.13                                0.13                              0.13                         0.13
Total Nitrogen - k (m/yr)                                                          40              500                                                                                             500                                                                                  500                                 500                               500                          500
Total Nitrogen - C* (mg/L)                                                        1.4               1.4                                                                                             1.4                                                                                  1.4                                 1.4                               1.4                          1.4

Page 47

Total Nitrogen - C** (mg/L)                                            1.4                                                                                                                                                  1.4                 1.4                  1.4                 1.4
Threshold Hydraulic Loading for C** (m/yr)                           3500                                                                                                                                                 3500                3500                 3500                3500
Horizontal Flow Coefficient                                                                     3                                                                              3
Extraction for Re-use                                    On                  Off                     Off                    Off               Off                                   Off                      Off                   Off                 Off                  Off
Annual Re-use Demand - scaled by daily PET (ML)                         0
Annual Re-use Demand - scaled by daily PET - Rain (ML)                  0
Constant Daily Re-use Demand (kL)                                     130
User-defined Annual Re-use Demand (ML)                                  0
Percentage of User-defined Annual Re-use Demand Jan           8.333333333
Percentage of User-defined Annual Re-use Demand Feb           8.333333333
Percentage of User-defined Annual Re-use Demand Mar           8.333333333
Percentage of User-defined Annual Re-use Demand Apr           8.333333333
Percentage of User-defined Annual Re-use Demand May           8.333333333
Percentage of User-defined Annual Re-use Demand Jun           8.333333333
Percentage of User-defined Annual Re-use Demand Jul           8.333333333
Percentage of User-defined Annual Re-use Demand Aug           8.333333333
Percentage of User-defined Annual Re-use Demand Sep           8.333333333
Percentage of User-defined Annual Re-use Demand Oct           8.333333333
Percentage of User-defined Annual Re-use Demand Nov           8.333333333
Percentage of User-defined Annual Re-use Demand Dec           8.333333333
User-defined Re-use File
Filter area (sqm)                                                                              55                                                                             64
Filter perimeter (m)                                                                         0.01                                                                           0.01
Filter depth (m)                                                                              0.5                                                                            0.5
Filter Median Particle Diameter (mm)
Saturated Hydraulic Conductivity (mm/hr)                                                      200                                                                            200
Infiltration Media Porosity                                                                  0.35                                                                           0.35
Length (m)                                                                                                                                                                                                                  100                 100                  100                 110
Bed slope                                                                                                                                                                                                                  0.03                0.03                 0.01                0.01
Base Width (m)                                                                                                                                                                                                                0                   0                    0                   0
Top width (m)                                                                                                                                                                                                                 4                   4                    4                   4
Vegetation height (m)                                                                                                                                                                                                      0.25                0.25                 0.25                0.25
Vegetation Type                                                              Vegetated with Effective Nutrient Removal Plants                 Vegetated with Effective Nutrient Removal Plants
Total Nitrogen Content in Filter (mg/kg)                                                     800                                                                             800
Orthophosphate Content in Filter (mg/kg)                                                       50                                                                             80
Is Base Lined?                                                               No                                                               No
Is Underdrain Present?                                                       Yes                                                              Yes
Is Submerged Zone Present?                                                   No                                                               No
Submerged Zone Depth (m)
B for Media Soil Texture                                            -9999                      13                 -9999              -9999                                    13                    -9999                 -9999               -9999               -9999               -9999
Proportion of upstream impervious area treated                                                                        1                  1                                                              1
Exfiltration Rate (mm/hr)                                               0                       0                     0                  0                                     0                        0                     0                   0                    0                   0
Evap Loss as proportion of PET                                          0
Depth in metres below the drain pipe
TSS A Coefficient
TSS B Coefficient
TP A Coefficient
TP B Coefficient
TN A Coefficient
TN B Coefficient
Sfc                                                                                          0.37                                                                           0.61
S*                                                                                           0.22                                                                           0.37
Sw                                                                                           0.11                                                                           0.11
Sh                                                                                           0.05                                                                           0.05
Emax (m/day)                                                                                0.008                                                                          0.008
Ew (m/day)                                                                                  0.001                                                                          0.001
IN - Mean Annual Flow (ML/yr)                                         17.7                   1.89                   6.11               7.98                                 1.65                      5.42                  1.67                1.25                0.578              0.518
IN - TSS Mean Annual Load (kg/yr)                                      519                    746             2.40E+03            3.13E+03                                   646                 2.14E+03                    449                 517                  119                108
IN - TP Mean Annual Load (kg/yr)                                      3.06                   1.28                     4.2              5.36                                   1.1                     3.72                 0.993               0.854               0.318               0.285
IN - TN Mean Annual Load (kg/yr)                                      56.5                   5.99                   19.3               25.9                                 5.27                      17.7                  5.39                4.07                 1.85               1.65
IN - Gross Pollutant Mean Annual Load (kg/yr)                          418                      44                   142                186                                 38.3                       126                  16.8                4.56                 2.12                 1.9
OUT - Mean Annual Flow (ML/yr)                                        2.43                   1.76                   6.11               7.98                                   1.5                     5.42                  1.67                1.25               0.579               0.519
OUT - TSS Mean Annual Load (kg/yr)                                    55.9                   75.6                    676                873                                 19.2                       593                  35.4                  31                 8.68                 7.6
OUT - TP Mean Annual Load (kg/yr)                                    0.376                  0.301                   2.25               2.87                                0.361                      1.99                 0.256               0.191           7.77E-02            6.91E-02
OUT - TN Mean Annual Load (kg/yr)                                     7.21                     2.7                  14.1               18.8                                 1.34                      12.8                  3.95                   3                 1.17               1.01
OUT - Gross Pollutant Mean Annual Load (kg/yr)                           0                       0                   142                186                                     0                      126                     0                   0                    0                   0
Flow In (ML/yr)                                                   17.7417                1.88954                 6.1108            7.98163                              1.64846                   5.42454               1.66743             1.24723            0.578596            0.518355
ET Loss (ML/yr)                                                          0              0.129111                        0                 0                           0.149029                           0                     0                   0                    0                   0
Infiltration Loss (ML/yr)                                                0                       0                      0                 0                                     0                        0                     0                   0                    0                   0
Low Flow Bypass Out (ML/yr)                                              0                       0                      0                 0                                     0                        0                     0                   0                    0                   0
High Flow Bypass Out (ML/yr)                                             0                       0                      0                 0                                     0                        0                     0                   0                    0                   0
Orifice / Filter Out (ML/yr)                                      2.43428                1.20724                 6.1108            7.98163                              1.41258                   5.42454               1.66751             1.24706            0.579079            0.518966
Weir Out (ML/yr)                                                         0              0.551054                        0                 0                          0.0853999                           0                     0                   0                    0                   0
Transfer Function Out (ML/yr)                                            0                       0                      0                 0                                     0                        0                     0                   0                    0                   0
Reuse Supplied (ML/yr)                                            15.3547                        0                      0                 0                                     0                        0                     0                   0                    0                   0
Reuse Requested (ML/yr)                                           47.6137                        0                      0                 0                                     0                        0                     0                   0                    0                   0
% Reuse Demand Met                                                32.2486                        0                      0                 0                                     0                        0                     0                   0                    0                   0
% Load Reduction                                                  86.2793                6.94562                        0                 0                             9.12867                          0         -0.00507967           0.0133496           -0.0835817           -0.117757
TSS Flow In (kg/yr)                                               519.493                  746.37              2398.95             3129.85                              646.065                   2139.68               448.797             516.948              119.347            107.871
TSS ET Loss (kg/yr)                                                      0                       0                      0                 0                                     0                        0                     0                   0                    0                   0
TSS Infiltration Loss (kg/yr)                                            0                       0                      0                 0                                     0                        0                     0                   0                    0                   0
TSS Low Flow Bypass Out (kg/yr)                                          0                       0                      0                 0                                     0                        0                     0                   0                    0                   0
TSS High Flow Bypass Out (kg/yr)                                         0                       0                      0                 0                                     0                        0                     0                   0                    0                   0
TSS Orifice / Filter Out (kg/yr)                                  55.9119                2.94212               676.338             872.883                              3.67167                   593.326               35.4375             31.0342              8.67153            7.60152
TSS Weir Out (kg/yr)                                                     0               72.6246                        0                 0                             15.4864                          0                     0                   0                    0                   0
TSS Transfer Function Out (kg/yr)                                        0                       0                      0                 0                                     0                        0                     0                   0                    0                   0
TSS Reuse Supplied (kg/yr)                                        210.517                        0                      0                 0                                     0                        0                     0                   0                    0                   0
TSS Reuse Requested (kg/yr)                                              0                       0                      0                 0                                     0                        0                     0                   0                    0                   0
TSS % Reuse Demand Met                                                   0                       0                      0                 0                                     0                        0                     0                   0                    0                   0
TSS % Load Reduction                                              89.2372                89.8754               71.8069               72.111                             97.0347                   72.2704               92.1039             93.9966              92.7342            92.9532
TP Flow In (kg/yr)                                                3.06026                  1.2792              4.19683             5.35562                              1.10497                   3.71869              0.993327           0.853747             0.317934            0.285359
TP ET Loss (kg/yr)                                                       0                       0                      0                 0                                     0                        0                     0                   0                    0                   0
TP Infiltration Loss (kg/yr)                                             0                       0                      0                 0                                     0                        0                     0                   0                    0                   0

Page 48

TP Low Flow Bypass Out (kg/yr) 0

TP High Flow Bypass Out (kg/yr) 0
TP Orifice / Filter Out (kg/yr) 0.376324
TP Weir Out (kg/yr) 0
TP Transfer Function Out (kg/yr) 0
TP Reuse Supplied (kg/yr) 2.08945
TP Reuse Requested (kg/yr) 0
TP % Reuse Demand Met 0
TP % Load Reduction 87.7029
TN Flow In (kglyr) 56.5074
TN ET Loss (kg/yr) 0
TN Infiltration Loss (kg/yr) 0
TN Low Flow Bypass Out (kg/yr) 0
TN High Flow Bypass Out (kg/yr) 0
TN Orifice / Filter Out (kg/yr) 7.21265
TN Weir Out (kg/yr) 0
TN Transfer Function Out (kg/yr) 0
TN Reuse Supplied (kg/yr) 37.6411
TN Reuse Requested (kg/yr) 0
TN % Reuse Demand Met 0
TN % Load Reduction 87.2359
GP Flow In (kg/yr) 417.979
GP ET Loss (kglyr) 0
GP Infiltration Loss (kg/yr) 0
GP Low Flow Bypass Out (kg/yr) 0
GP High Flow Bypass Out (kg/yr) 0
GP Orifice / Filter Out (kg/yr) 0
GP Weir Out (kg/yr) 0
GP Transfer Function Out (kg/yr) 0
GP Reuse Supplied (kg/yr) 0
GP Reuse Requested (kg/yr) 0
GP % Reuse Demand Met 0
GP % Load Reduction 100
No Generic treatment nodes

Other nodes

Location Receiving Node

ID 3
Node Type ReceivingNode

IN - Mean Annual Flow (ML/yr) 29.7
IN - TSS Mean Annual Load (kg/yr) 2.38E+03
IN - TP Mean Annual Load (kg/yr) 8.82
IN - TN Mean Annual Load (kg/yr) 67.3
IN - Gross Pollutant Mean Annual Load (kg/yr) 454
OUT - Mean Annual Flow (ML/yr) 0
OUT - TSS Mean Annual Load (kg/yr) 0
OUT - TP Mean Annual Load (kg/yr) 0
OUT - TN Mean Annual Load (kg/yr) 0
OUT - Gross Pollutant Mean Annual Load (kg/yr) 0
Links

Location Drainage Link
Source node ID 1
Target node ID 2
Muskingum-Cunge Routing Not Routed
Muskingum K

Muskingum theta

IN - Mean Annual Flow (ML/yr) 177
IN - TSS Mean Annual Load (kg/yr) 519
IN - TP Mean Annual Load (kg/yr) 3.06
IN - TN Mean Annual Load (kg/yr) 56.5
IN - Gross Pollutant Mean Annual Load (kg/yr) 418
OUT - Mean Annual Flow (ML/yr) 177
OUT - TSS Mean Annual Load (kg/yr) 519
OUT - TP Mean Annual Load (kg/yr) 3.06
OUT - TN Mean Annual Load (kg/yr) 56.5

OUT - Gross Pollutant Mean Annual Load (kg/yr) 418

0

0
0.124405
0.176453
0

0

0

0
76.4808
5.99228
0

0

0

0
1.08939
1.61237

Drainage Link

Not Routed

4
3

1.76
75.6
0.301
27

1.76
75.6
0.301
27

2.25405

Drainage Link

Not Routed

2
3

2.43
55.9
0.376
7.21

2.43
55.9
0.376
7.21

Drainage Link

Not Routed

7
4

1.89
746
1.28
5.99

1.89
746
1.28
5.99

Drainage Link

Not Routed

0

0
0.330948
0.0294126
0

0

0

0
67.3873
5.27416
0

0

0

0
1.09846
0.235767

10
11

6.11
2.40E+03
42

19.3

142

6.11
2.40E+03
42

19.3

142

Drainage Link

Not Routed

6.11
676
2.25
14.1
142
6.11
676
2.25
14.1
142

Drainage Link

Not Routed

0.255516

26.751

ecooococOo0e

100

12
13,

7.98
3.13E+03
5.36

25.9

186

7.98
3.13E+03
5.36

25.9

186

Drainage Link

Not Routed

13,
3

7.98
873
2.87
18.8
186
7.98
873
2.87
18.8
186

Drainage Link

Not Routed

0
0
0.0776453,

1.65
646

5.27
38.3
1.65
646
14
5.27
38.3

Drainage Link

Not Routed

0
0
0.069049

1.5
19.2
0.361
1.34

1.5
19.2
0.361
1.34

Page 49

P & Q- gravel roads
18
UrbanSourceNode

0.149
0.007974378
0.141025622
80
243
06
1
18
10
50
0
31
0
2.16
0.38

Stochastic
0
-0.39
0.34

Stochastic
0
0.37
0.34

Stochastic

0.78
0.39
Stochastic

Stochastic
Stochastic

0.619
3.66

44
2.07748
0.957465
0

0
0.0951138
1.02426
1.11937
1.11937
0.0006483
0

233.017
233.017

0
0.619052
0.619052
0

3.66107
3.66107
4.09606

s
24
SwaleNode

0.5
40

10
8000
20
14
6000
0.13
0.13
500
14

Catchment L
20
UrbanSourceNode
0.166
0.008164635
0.157835365,
80
243
06
1
18
10
50
0
31
0
2.43
0.38
Stochastic
0
-0.3
0.34
Stochastic
0
0.37
0.34
Stochastic

0.78
0.39
Stochastic
0
-0.6
0.5
Stochastic
0
0.32
0.3
Stochastic
0
1.25
517
0.854
4.07
4.56
2.31451
1.0667
0

0
0.105966
1.14112
1.24708
1.24708
0.0007223
0
516.976
516.976
0
0.853766
0.853766
0
4.06654
4.06654
4.5634

wi

Bioretention Basin Buffer-CatchA B

X - gravel roads

Catchment K & N - gravel road

Catchment T - gravel road Catchment U- Grass adj Shed 6 Catchment W - Grass adj Shed 7

Swale - Shed 6

Swale - Shed 7

Swale - Shed 1

Swale - Shed 3

Swale - Shed 4

Page 50

Off

14
3500

100
0.03

0.25

-9999

0.526
114
0.287
1.64
1.92
0.526
8.33
7.16E-02
1.09

0
0.525849
0
0
0
0
0.525976

0
0
0
0
0

-0.0240944
113.639

92.676
0.287313
0

0

Page 51

0
0
0.0716253

Drainage Link
5
16

Not Routed

5.42
2.14E+03
3.72

17.7

126

5.42
2.14E+03
3.72

17.7

126

Drainage Link

Not Routed

5.42
593
1.99
12.8
126
5.42
593
1.99
12.8
126

Drainage Link
18
19
Not Routed

1.12
233
0.619
3.66

1.12
233
0.619
3.66
41

Drainage Link
17
19
Not Routed

0.548
216
0.374
1.72
12.8
0.548
216
0.374
1.72
12.8

Drainage Link
19
3

Not Routed

1.67
35.4
0.256
3.95

1.67
35.4
0.256
3.95

Drainage Link
20
21
Not Routed

1.25
517
0.854
4.07
4.56
1.25
517
0.854
4.07
4.56

Drainage Link
21
3

Not Routed

1.25
0.191
1.25

31
0.191
3

Drainage Link
6
22
Not Routed

0.578
119
0.318
1.85
212
0.578
119
0.318
1.85
2.12

Drainage Link

Not Routed

22
3

0.579
8.68
7.77E-02
1.17

0.579
8.68
7.77E-02
1.17

Drainage Link

Not Routed

8
23

0.518
108
0.285
1.65

0.518
108
0.285
1.65
1.9

Drainage Link

Not Routed

23

0.519

6.91E-02
1.01

0.519

6.91E-02
1.01

Drainage Link

Not Routed

9
24

0.526
114
0.287
1.64
1.92
0.526
114
0.287
1.64
1.92

Drainage Link
24
3

Not Routed

0.526
8.33
7.16E-02
1.09

0

0.526
8.33
7.16E-02
1.09

0

Page 52

Source nodes
Location                                                         Agricultural - compost area 1   Agricultural - compost area 2
ID                                                                               1                              2
Node Type                                                          AgriculturalSourceNode          AgriculturalSourceNode
Total Area (ha)                                                               0.14                             0.3
Area Impervious (ha)                                                          0.14                             0.3
Area Pervious (ha)                                                               0                              0
Field Capacity (mm)                                                             80                              80
Pervious Area Infiltration Capacity coefficient - a                            200                             200
Pervious Area Infiltration Capacity exponent - b                                 1                              1
Impervious Area Rainfall Threshold (mm/day)                                      1                              1
Pervious Area Soil Storage Capacity (mm)                                       120                             120
Pervious Area Soil Initial Storage (% of Capacity)                              10                              10
Groundwater Initial Depth (mm)                                                  10                              10
Groundwater Daily Recharge Rate (%)                                             25                              25
Groundwater Daily Baseflow Rate (%)                                              5                              5
Groundwater Daily Deep Seepage Rate (%)                                          0                              0
Stormflow Total Suspended Solids Mean (log mg/L)                              2.477                          2.477
Stormflow Total Suspended Solids Standard Deviation (log mg/L)                0.31                            0.31
Stormflow Total Suspended Solids Estimation Method                        Stochastic                      Stochastic
Stormflow Total Suspended Solids Serial Correlation                              0                              0
Stormflow Total Phosphorus Mean (log mg/L)                                   -0.495                         -0.495
Stormflow Total Phosphorus Standard Deviation (log mg/L)                       0.3                             0.3
Stormflow Total Phosphorus Estimation Method                              Stochastic                      Stochastic
Stormflow Total Phosphorus Serial Correlation                                    0                              0
Stormflow Total Nitrogen Mean (log mg/L)                                      0.29                            0.29
Stormflow Total Nitrogen Standard Deviation (log mg/L)                        0.26                            0.26
Stormflow Total Nitrogen Estimation Method                                Stochastic                      Stochastic
Stormflow Total Nitrogen Serial Correlation                                      0                              0
Baseflow Total Suspended Solids Mean (log mg/L)                                  1                              1
Baseflow Total Suspended Solids Standard Deviation (log mg/L)                 0.13                            0.13
Baseflow Total Suspended Solids Estimation Method                         Stochastic                      Stochastic
Baseflow Total Suspended Solids Serial Correlation                               0                              0
Baseflow Total Phosphorus Mean (log mg/L)                                    -1.155                         -1.155
Baseflow Total Phosphorus Standard Deviation (log mg/L)                       0.13                            0.13
Baseflow Total Phosphorus Estimation Method                               Stochastic                      Stochastic
Baseflow Total Phosphorus Serial Correlation                                     0                              0
Baseflow Total Nitrogen Mean (log mg/L)                                      -0.155                         -0.155
Baseflow Total Nitrogen Standard Deviation (log mg/L)                         0.13                            0.13
Baseflow Total Nitrogen Estimation Method                                 Stochastic                      Stochastic
Baseflow Total Nitrogen Serial Correlation                                       0                              0
OUT - Mean Annual Flow (ML/yr)                                                1.79                            3.83
OUT - TSS Mean Annual Load (kg/yr)                                             681                         1.50E+03
OUT - TP Mean Annual Load (kg/yr)                                             0.73                            1.57
OUT - TN Mean Annual Load (kg/yr)                                             4.13                            8.98
OUT - Gross Pollutant Mean Annual Load (kg/yr)                                42.1                            90.2
Rain In (ML/yr)                                                               1.952                        4.18285
ET Loss (ML/yr)                                                            0.164624                        0.352769
Deep Seepage Loss (ML/yr)                                                        0                              0
Baseflow Out (ML/yr)                                                             0                              0
Imp. Stormflow Out (ML/yr)                                                  1.78737                        3.83008
Perv. Stormflow Out (ML/yr)                                                      0                              0
Total Stormflow Out (ML/yr)                                                 1.78737                        3.83008
Total Outflow (ML/yr)                                                       1.78737                        3.83008
Change in Soil Storage (ML/yr)                                                   0                              0
TSS Baseflow Out (ML/yr)                                                         0                              0
TSS Total Stormflow Out (ML/yr)                                             681.287                        1500.42
TSS Total Outflow (ML/yr)                                                   681.287                        1500.42
TP Baseflow Out (ML/yr)                                                          0                              0
TP Total Stormflow Out (ML/yr)                                             0.729926                        1.56575
TP Total Outflow (ML/yr)                                                   0.729926                        1.56575
TN Baseflow Out (ML/yr)                                                          0                              0
TN Total Stormflow Out (ML/yr)                                              4.12656                        8.97688
TN Total Outflow (ML/yr)                                                    4.12656                        8.97688
GP Total Outflow (ML/yr)                                                    42.0982                        90.2106

No Imported Data Source nodes

USTM treatment nodes
Location                                                               Bioretention - 1                Bioretention - 2
ID                                                                            3                               4
Node Type                                                           BioRetentionNodeV4              BioRetentionNodeV4
Lo-flow bypass rate (cum/sec)                                                 0                               0
Hi-flow bypass rate (cum/sec)                                                100                             100
Inlet pond volume
Area (sqm)                                                                   20                              40
Extended detention depth (m)                                                 0.2                             0.2
Permanent Pool Volume (cubic metres)
Proportion vegetated
Equivalent Pipe Diameter (mm)
Overflow weir width (m)                                                       2                               2
Notional Detention Time (hrs)
Orifice Discharge Coefficient
Weir Coefficient                                                              1.7                             1.7
Number of CSTR Cells                                                           3                               3
Total Suspended Solids - k (m/yr)                                            8000                            8000
Total Suspended Solids - C* (mg/L)                                            20                              20
Total Suspended Solids - C** (mg/L)
Total Phosphorus - k (m/yr)                                                  6000                            6000
Total Phosphorus - C* (mg/L)                                                 0.13                            0.13
Total Phosphorus - C** (mg/L)
Total Nitrogen - k (m/yr)                                                    500                             500

Page 53

Total Nitrogen - C* (mg/L)                                                     1.4                                   1.4
Total Nitrogen - C** (mg/L)
Threshold Hydraulic Loading for C** (m/yr)
Horizontal Flow Coefficient                                                     3                                     3
Extraction for Re-use                                                          Off                                   Off
Annual Re-use Demand - scaled by daily PET (ML)
Annual Re-use Demand - scaled by daily PET - Rain (ML)
Constant Daily Re-use Demand (kL)
User-defined Annual Re-use Demand (ML)
User-defined Re-use File
Filter area (sqm)                                                              20                                    40
Filter perimeter (m)                                                           14                                    14
Filter depth (m)                                                               0.5                                   0.5
Filter Median Particle Diameter (mm)
Saturated Hydraulic Conductivity (mm/hr)                                        200                                   200
Infiltration Media Porosity                                                    0.35                                  0.35
Vegetation Type                                          Vegetated with Effective Nutrient Removal
                                                                                             Vegetated
                                                                                                   Plantswith Effective Nutrient Removal Plants
Total Nitrogen Content in Filter (mg/kg)                                        800                                   800
Orthophosphate Content in Filter (mg/kg)                                        55                                     55
Is Base Lined?                                                                  Yes                                   Yes
Is Underdrain Present?                                                          Yes                                   Yes
Is Submerged Zone Present?                                                      No                                    No
Submerged Zone Depth (m)
B for Media Soil Texture                                                        13                                   13
Proportion of upstream impervious area treated
Exfiltration Rate (mm/hr)                                                       0                                    0
Evap Loss as proportion of PET
Depth in metres below the drain pipe                                            0                                    0
IN - Mean Annual Flow (ML/yr)                                                 1.79                                 3.83
IN - TSS Mean Annual Load (kg/yr)                                              681                               1.50E+03
IN - TP Mean Annual Load (kg/yr)                                              0.73                                 1.57
IN - TN Mean Annual Load (kg/yr)                                              4.13                                 8.98
IN - Gross Pollutant Mean Annual Load (kg/yr)                                 42.1                                 90.2
OUT - Mean Annual Flow (ML/yr)                                                1.74                                 3.73
OUT - TSS Mean Annual Load (kg/yr)                                            98.1                                  242
OUT - TP Mean Annual Load (kg/yr)                                             0.299                                0.66
OUT - TN Mean Annual Load (kg/yr)                                               2                                  4.48
OUT - Gross Pollutant Mean Annual Load (kg/yr)                                  0                                    0

No Generic treatment nodes

Other nodes
Location                                                                     Junction                            Junction                         Receiving Node
ID                                                                               5                                   6                                   7
Node Type                                                                 JunctionNode                         JunctionNode                       ReceivingNode
IN - Mean Annual Flow (ML/yr)                                                  1.74                                3.73                                5.47
IN - TSS Mean Annual Load (kg/yr)                                              98.1                                 242                                340
IN - TP Mean Annual Load (kg/yr)                                              0.299                                0.66                               0.959
IN - TN Mean Annual Load (kg/yr)                                                 2                                 4.48                                6.48
IN - Gross Pollutant Mean Annual Load (kg/yr)                                    0                                   0                                   0
OUT - Mean Annual Flow (ML/yr)                                                 1.74                                3.73                                  0
OUT - TSS Mean Annual Load (kg/yr)                                             98.1                                 242                                  0
OUT - TP Mean Annual Load (kg/yr)                                             0.299                                0.66                                  0
OUT - TN Mean Annual Load (kg/yr)                                                2                                 4.48                                  0
OUT - Gross Pollutant Mean Annual Load (kg/yr)                                   0                                   0                                   0

Links
Location                                                                  Drainage Link                        Drainage Link                      Drainage Link    Drainage Link   Drainage Link   Drainage Link
Source node ID                                                                  3                                    4                                  5                6               2               1
Target node ID                                                                  5                                    6                                  7                7               4               3
Muskingum-Cunge Routing                                                    Not Routed                           Not Routed                         Not Routed       Not Routed      Not Routed      Not Routed
Muskingum K
Muskingum theta
IN - Mean Annual Flow (ML/yr)                                                 1.74                                  3.73                              1.74             3.73            3.83            1.79
IN - TSS Mean Annual Load (kg/yr)                                             98.1                                  242                               98.1             242           1.50E+03          681
IN - TP Mean Annual Load (kg/yr)                                              0.299                                 0.66                              0.299            0.66            1.57            0.73
IN - TN Mean Annual Load (kg/yr)                                                2                                   4.48                                2              4.48            8.98            4.13
IN - Gross Pollutant Mean Annual Load (kg/yr)                                   0                                    0                                  0               0              90.2            42.1
OUT - Mean Annual Flow (ML/yr)                                                1.74                                  3.73                              1.74             3.73            3.83            1.79
OUT - TSS Mean Annual Load (kg/yr)                                            98.1                                  242                               98.1             242           1.50E+03          681
OUT - TP Mean Annual Load (kg/yr)                                             0.299                                 0.66                              0.299            0.66            1.57            0.73
OUT - TN Mean Annual Load (kg/yr)                                               2                                   4.48                                2              4.48            8.98            4.13
OUT - Gross Pollutant Mean Annual Load (kg/yr)                                  0                                    0                                  0               0              90.2            42.1

Page 54

                                                     Callaghan & Toth


APPENDIX 4                 -        SITE PHOTO




                                                                      D
1209 Animal Husbandry – Top Forestry Rd, Ridgewood      SWQMP_REV_3
SEPTEMBER 2013

Page 55

                                                                       Callaghan & Toth

APPENDIX 4                          -        SITE PHOTOS




                    Photo 1 – Pre Development Ridge Line Access Tracks




                               Photo 2 – Typical Poultry Farm Sheds
                                                                                    D
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                    SWQMP_REV_3
SEPTEMBER 2013

Page 56

                                                                   Callaghan & Toth




                                       Photo 3 – Compost Cover




                                      Photo 4 – Compost Turning
                                                                                E
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                SWQMP_REV_3
SEPTEMBER 2013

Page 57

                                                              Callaghan & Toth



APPENDIX 5                 -        DETENTION BASIN RESULTS




                                                                               E
1209 Animal Husbandry – Top Forestry Rd, Ridgewood               SWQMP_REV_3
SEPTEMBER 2013

Page 58

      2S

Half catchment A
                                                                                             4R

                                                                                       (new Reach)



          5S

 Half catchment A




 Subcat        Reach   Pond   Link   Routing Diagram for Catchment A No detention Q10 Cooroy chicken farm
                                        Prepared by {enter your company name here}, Printed 24/04/2013
                                         HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC

Page 59

Catchment A No detention Q10 Cooro noosa 10-Year Duration=20 min, Inten=127.9 mm/hr
Prepared by {enter your company name here}                                       Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC                             Page 2

                         Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
                         Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
                Reach routing by Stor-Ind method - Pond routing by Stor-Ind method

Subcatchment 2S: Half catchment A       Runoff Area=56,815.0 m² 0.00% Impervious Runoff Depth=37 mm
                                                     Tc=23.0 min C=0.74 Runoff=1.29046 m³/s 2.105 Ml

Subcatchment 5S: Half catchment A       Runoff Area=56,815.0 m² 0.00% Impervious Runoff Depth=37 mm
                                                     Tc=23.0 min C=0.74 Runoff=1.29046 m³/s 2.105 Ml

Reach 4R: (new Reach)                                                   Inflow=2.58092 m³/s 4.209 Ml
                                                                       Outflow=2.58092 m³/s 4.209 Ml

          Total Runoff Area = 11.3630 ha Runoff Volume = 4.209 Ml Average Runoff Depth = 37 mm
                                      100.00% Pervious = 11.3630 ha 0.00% Impervious = 0.0000 ha

Page 60

Catchment A No detention Q10 Cooro noosa 10-Year Duration=20 min, Inten=127.9 mm/hr
Prepared by {enter your company name here}                                                 Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC                                       Page 3

                                 Summary for Subcatchment 2S: Half catchment A

[48] Hint: Peak<CiA due to short duration

Runoff                 =     1.29046 [email protected] hrs, Volume=       2.105 Ml, Depth= 37 mm

Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
noosa 10-Year Duration=20 min, Inten=127.9 mm/hr

                 Area (m²)       C   Description
                  56,815.0    0.74   LIGHT GRASS ON clay
                  56,815.0           100.00% Pervious Area

    Tc   Length                 Slope Velocity    Capacity Description
  (min) (meters)                (m/m) (m/sec)       (m³/s)
   23.0                                                    Direct Entry, GRASS OVER clay

                                        Subcatchment 2S: Half catchment A
                                              Hydrograph

                       1.29046 m³/s                                                               Runoff
                                                                      noosa 10-Year
                                                                    Duration=20 min,
                                                                  Inten=127.9 mm/hr
                   1
                                                             Runoff Area=56,815.0 m²
   Flow (m³/s)




                                                             Runoff Volume=2.105 Ml
                                                               Runoff Depth=37 mm
                                                                        Tc=23.0 min
                                                                             C=0.74




                   0
                       0                      1                   2                    3
                                                  Time (hours)

Page 61

Catchment A No detention Q10 Cooro noosa 10-Year Duration=20 min, Inten=127.9 mm/hr
Prepared by {enter your company name here}                                                 Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC                                       Page 4

                                 Summary for Subcatchment 5S: Half catchment A

[48] Hint: Peak<CiA due to short duration

Runoff                 =     1.29046 [email protected] hrs, Volume=       2.105 Ml, Depth= 37 mm

Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
noosa 10-Year Duration=20 min, Inten=127.9 mm/hr

                 Area (m²)       C   Description
                  56,815.0    0.74   LIGHT GRASS ON clay
                  56,815.0           100.00% Pervious Area

    Tc   Length                 Slope Velocity    Capacity Description
  (min) (meters)                (m/m) (m/sec)       (m³/s)
   23.0                                                    Direct Entry, GRASS OVER clay

                                        Subcatchment 5S: Half catchment A
                                              Hydrograph

                       1.29046 m³/s                                                               Runoff
                                                                      noosa 10-Year
                                                                    Duration=20 min,
                                                                  Inten=127.9 mm/hr
                   1
                                                             Runoff Area=56,815.0 m²
   Flow (m³/s)




                                                             Runoff Volume=2.105 Ml
                                                               Runoff Depth=37 mm
                                                                        Tc=23.0 min
                                                                             C=0.74




                   0
                       0                      1                   2                    3
                                                  Time (hours)

Page 62

Catchment A No detention Q10 Cooro noosa 10-Year Duration=20 min, Inten=127.9 mm/hr
Prepared by {enter your company name here}                                            Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC                                  Page 5

                                      Summary for Reach 4R: (new Reach)

[40] Hint: Not Described (Outflow=Inflow)

Inflow Area =              11.3630 ha, 0.00% Impervious, Inflow Depth = 37 mm for 10-Year event
Inflow     =             2.58092 [email protected] hrs, Volume=          4.209 Ml
Outflow    =             2.58092 [email protected] hrs, Volume=          4.209 Ml, Atten= 0%, Lag= 0.0 min

Routing by Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs

                                             Reach 4R: (new Reach)
                                            Hydrograph

                       2.58092 m³/s                                                         Inflow
                     2.58092 m³/s                                                           Outflow
                                                            Inflow Area=11.3630 ha


                 2
   Flow (m³/s)




                 1




                 0
                     0                  1                     2                   3
                                             Time (hours)

Page 63

      2S                                         4P

Half catchment A                             (new Pond)
                                                                                                 4R

                                                                                           (new Reach)

                     6S
                                                  7P
               Half catchment A
                                              (new Pond)




 Subcat    Reach     Pond         Link   Routing Diagram for Catchment A +dam detention Q10 Cooroy chicken farm
                                            Prepared by {enter your company name here}, Printed 24/04/2013
                                             HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC

Page 64

Catchment A +dam detention Q10 Coo noosa 10-Year Duration=20 min, Inten=127.9 mm/hr
Prepared by {enter your company name here}                                       Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC                             Page 2

                         Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
                         Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
                Reach routing by Stor-Ind method - Pond routing by Stor-Ind method

Subcatchment 2S: Half catchment A       Runoff Area=56,815.0 m² 0.00% Impervious Runoff Depth=37 mm
                                                     Tc=23.0 min C=0.74 Runoff=1.29046 m³/s 2.105 Ml

Subcatchment 6S: Half catchment A       Runoff Area=56,815.0 m² 0.00% Impervious Runoff Depth=37 mm
                                                     Tc=23.0 min C=0.74 Runoff=1.29046 m³/s 2.105 Ml

Reach 4R: (new Reach)                                                    Inflow=1.90082 m³/s 4.176 Ml
                                                                        Outflow=1.90082 m³/s 4.176 Ml

Pond 4P: (new Pond)                 Peak Elev=125.255 m Storage=0.685 Ml Inflow=1.29046 m³/s 2.105 Ml
                                                                        Outflow=0.95041 m³/s 2.088 Ml

Pond 7P: (new Pond)                 Peak Elev=125.255 m Storage=0.685 Ml Inflow=1.29046 m³/s 2.105 Ml
                                                                        Outflow=0.95041 m³/s 2.088 Ml

          Total Runoff Area = 11.3630 ha Runoff Volume = 4.209 Ml Average Runoff Depth = 37 mm
                                      100.00% Pervious = 11.3630 ha 0.00% Impervious = 0.0000 ha

Page 65

Catchment A +dam detention Q10 Coo noosa 10-Year Duration=20 min, Inten=127.9 mm/hr
Prepared by {enter your company name here}                                                 Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC                                       Page 3

                                 Summary for Subcatchment 2S: Half catchment A

[48] Hint: Peak<CiA due to short duration

Runoff                 =     1.29046 [email protected] hrs, Volume=       2.105 Ml, Depth= 37 mm

Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
noosa 10-Year Duration=20 min, Inten=127.9 mm/hr

                 Area (m²)       C   Description
                  56,815.0    0.74   LIGHT GRASS ON clay
                  56,815.0           100.00% Pervious Area

    Tc   Length                 Slope Velocity    Capacity Description
  (min) (meters)                (m/m) (m/sec)       (m³/s)
   23.0                                                    Direct Entry, GRASS OVER clay

                                        Subcatchment 2S: Half catchment A
                                              Hydrograph

                       1.29046 m³/s                                                               Runoff
                                                                      noosa 10-Year
                                                                    Duration=20 min,
                                                                  Inten=127.9 mm/hr
                   1
                                                             Runoff Area=56,815.0 m²
   Flow (m³/s)




                                                             Runoff Volume=2.105 Ml
                                                               Runoff Depth=37 mm
                                                                        Tc=23.0 min
                                                                             C=0.74




                   0
                       0                      1                   2                    3
                                                  Time (hours)

Page 66

Catchment A +dam detention Q10 Coo noosa 10-Year Duration=20 min, Inten=127.9 mm/hr
Prepared by {enter your company name here}                                                 Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC                                       Page 4

                                 Summary for Subcatchment 6S: Half catchment A

[48] Hint: Peak<CiA due to short duration

Runoff                 =     1.29046 [email protected] hrs, Volume=       2.105 Ml, Depth= 37 mm

Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
noosa 10-Year Duration=20 min, Inten=127.9 mm/hr

                 Area (m²)       C   Description
                  56,815.0    0.74   LIGHT GRASS ON clay
                  56,815.0           100.00% Pervious Area

    Tc   Length                 Slope Velocity    Capacity Description
  (min) (meters)                (m/m) (m/sec)       (m³/s)
   23.0                                                    Direct Entry, GRASS OVER clay

                                        Subcatchment 6S: Half catchment A
                                              Hydrograph

                       1.29046 m³/s                                                               Runoff
                                                                      noosa 10-Year
                                                                    Duration=20 min,
                                                                  Inten=127.9 mm/hr
                   1
                                                             Runoff Area=56,815.0 m²
   Flow (m³/s)




                                                             Runoff Volume=2.105 Ml
                                                               Runoff Depth=37 mm
                                                                        Tc=23.0 min
                                                                             C=0.74




                   0
                       0                      1                   2                    3
                                                  Time (hours)

Page 67

Catchment A +dam detention Q10 Coo noosa 10-Year Duration=20 min, Inten=127.9 mm/hr
Prepared by {enter your company name here}                                             Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC                                   Page 5

                                      Summary for Reach 4R: (new Reach)

[40] Hint: Not Described (Outflow=Inflow)

Inflow Area =               11.3630 ha, 0.00% Impervious, Inflow Depth > 37 mm for 10-Year event
Inflow     =              1.90082 [email protected] hrs, Volume=          4.176 Ml
Outflow    =              1.90082 [email protected] hrs, Volume=          4.176 Ml, Atten= 0%, Lag= 0.0 min

Routing by Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs

                                               Reach 4R: (new Reach)
                                              Hydrograph

                           1.90082 m³/s                                                      Inflow
                         1.90082 m³/s                                                        Outflow
                 2                                            Inflow Area=11.3630 ha
   Flow (m³/s)




                 1




                 0
                     0                    1                     2                  3
                                               Time (hours)

Page 68

Catchment A +dam detention Q10 Coo noosa 10-Year Duration=20 min, Inten=127.9 mm/hr
Prepared by {enter your company name here}                                                    Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC                                          Page 6

                                         Summary for Pond 4P: (new Pond)

Inflow Area =                 5.6815 ha, 0.00% Impervious, Inflow Depth = 37 mm for 10-Year event
Inflow     =               1.29046 [email protected] hrs, Volume=          2.105 Ml
Outflow    =               0.95041 [email protected] hrs, Volume=          2.088 Ml, Atten= 26%, Lag= 9.1 min
Primary =                  0.95041 [email protected] hrs, Volume=          2.088 Ml

Routing by Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
Peak Elev= 125.255 [email protected] hrs Surf.Area= 0.2736 ha Storage= 0.685 Ml

Plug-Flow detention time= 14.7 min calculated for 2.081 Ml (99% of inflow)
Center-of-Mass det. time= 14.8 min ( 39.5 - 24.7 )

Volume     Invert               Avail.Storage     Storage Description
  #1   125.000 m                     1.367 Ml     58.00 mD x 0.50 mH Vertical Cone/Cylinder Z=2.0

Device           Routing           Invert   Outlet Devices
  #1             Primary       125.000 m    5.00 m long x 1.00 m breadth Broad-Crested Rectangular Weir
                                            Head (meters) 0. 061 0. 122 0. 183 0. 244 0. 305 0. 366 0. 427
                                            0.488 0. 549 0. 610 0. 762 0. 914 1. 067 1. 219 1. 372 1. 524 1. 676
                                            Coef. (Metric) 1. 34 1. 42 1. 48 1. 48 1. 47 1. 46 1. 46 1. 48 1. 48
                                            1.50 1. 54 1. 58 1. 61 1. 65 1. 76 1. 79 1. 83

Primary OutFlow Max=0.95021 [email protected] hrs HW=125.255 m (Free Discharge)
   1=Broad-Crested Rectangular Weir (Weir Controls 0.95021 [email protected] m/s)

                                                  Pond 4P: (new Pond)
                                                Hydrograph

                         1.29046 m³/s                                                                Inflow
                                                                                                     Primary
                                                              Inflow Area=5.6815 ha
                                                               Peak Elev=125.255 m
                          0.95041 m³/s                             Storage=0.685 Ml
                 1
   Flow (m³/s)




                 0
                     0                      1                     2                      3
                                                 Time (hours)

Page 69

Catchment A +dam detention Q10 Coo noosa 10-Year Duration=20 min, Inten=127.9 mm/hr
Prepared by {enter your company name here}                                                    Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC                                          Page 7

                                         Summary for Pond 7P: (new Pond)

Inflow Area =                 5.6815 ha, 0.00% Impervious, Inflow Depth = 37 mm for 10-Year event
Inflow     =               1.29046 [email protected] hrs, Volume=          2.105 Ml
Outflow    =               0.95041 [email protected] hrs, Volume=          2.088 Ml, Atten= 26%, Lag= 9.1 min
Primary =                  0.95041 [email protected] hrs, Volume=          2.088 Ml

Routing by Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
Peak Elev= 125.255 [email protected] hrs Surf.Area= 0.2736 ha Storage= 0.685 Ml

Plug-Flow detention time= 14.7 min calculated for 2.081 Ml (99% of inflow)
Center-of-Mass det. time= 14.8 min ( 39.5 - 24.7 )

Volume     Invert               Avail.Storage     Storage Description
  #1   125.000 m                     1.367 Ml     58.00 mD x 0.50 mH Vertical Cone/Cylinder Z=2.0

Device           Routing           Invert   Outlet Devices
  #1             Primary       125.000 m    5.00 m long x 1.00 m breadth Broad-Crested Rectangular Weir
                                            Head (meters) 0. 061 0. 122 0. 183 0. 244 0. 305 0. 366 0. 427
                                            0.488 0. 549 0. 610 0. 762 0. 914 1. 067 1. 219 1. 372 1. 524 1. 676
                                            Coef. (Metric) 1. 34 1. 42 1. 48 1. 48 1. 47 1. 46 1. 46 1. 48 1. 48
                                            1.50 1. 54 1. 58 1. 61 1. 65 1. 76 1. 79 1. 83

Primary OutFlow Max=0.95021 [email protected] hrs HW=125.255 m (Free Discharge)
   1=Broad-Crested Rectangular Weir (Weir Controls 0.95021 [email protected] m/s)

                                                  Pond 7P: (new Pond)
                                                Hydrograph

                         1.29046 m³/s                                                                Inflow
                                                                                                     Primary
                                                              Inflow Area=5.6815 ha
                                                               Peak Elev=125.255 m
                          0.95041 m³/s                             Storage=0.685 Ml
                 1
   Flow (m³/s)




                 0
                     0                      1                     2                      3
                                                 Time (hours)

Page 70

     2S

total roof area
                                                                                           4R

                                                                                     (new Reach)




Subcat      Reach   Pond   Link   Routing Diagram for roof catchment Pre development Q10 Cooroy chicken farm
                                     Prepared by {enter your company name here}, Printed 24/04/2013
                                      HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC

Page 71

roof catchment Pre development Q10 noosa 10-Year Duration=6 min, Inten=208.9 mm/hr
Prepared by {enter your company name here}                                       Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC                             Page 2

                         Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
                         Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
                Reach routing by Stor-Ind method - Pond routing by Stor-Ind method

Subcatchment 2S: total roof area        Runoff Area=14,653.0 m² 0.00% Impervious Runoff Depth=21 mm
                                                      Tc=6.0 min C=0.74 Runoff=0.63011 m³/s 0.306 Ml

Reach 4R: (new Reach)                                                   Inflow=0.63011 m³/s 0.306 Ml
                                                                       Outflow=0.63011 m³/s 0.306 Ml

           Total Runoff Area = 1.4653 ha Runoff Volume = 0.306 Ml Average Runoff Depth = 21 mm
                                       100.00% Pervious = 1.4653 ha 0.00% Impervious = 0.0000 ha

Page 72

roof catchment Pre development Q10 noosa 10-Year Duration=6 min, Inten=208.9 mm/hr
Prepared by {enter your company name here}                                                 Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC                                       Page 3

                                     Summary for Subcatchment 2S: total roof area

Runoff               =       0.63011 [email protected] hrs, Volume=        0.306 Ml, Depth= 21 mm

Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
noosa 10-Year Duration=6 min, Inten=208.9 mm/hr

                 Area (m²)       C    Description
                  14,653.0    0.74    LIGHT GRASS ON clay
                  14,653.0            100.00% Pervious Area

    Tc   Length                 Slope Velocity    Capacity Description
  (min) (meters)                (m/m) (m/sec)       (m³/s)
    6.0                                                    Direct Entry, GRASS OVER clay

                                           Subcatchment 2S: total roof area
                                               Hydrograph
                  0.7
                  0.63011 m³/s                                                                    Runoff
                                                                       noosa 10-Year
                  0.6
                                                                      Duration=6 min,
                  0.5                                              Inten=208.9 mm/hr
                                                              Runoff Area=14,653.0 m²
   Flow (m³/s)




                  0.4                                         Runoff Volume=0.306 Ml
                                                                Runoff Depth=21 mm
                  0.3                                                     Tc=6.0 min
                                                                              C=0.74
                  0.2

                  0.1

                    0
                        0                     1                    2                   3
                                                   Time (hours)

Page 73

roof catchment Pre development Q10 noosa 10-Year Duration=6 min, Inten=208.9 mm/hr
Prepared by {enter your company name here}                                              Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC                                    Page 4

                                       Summary for Reach 4R: (new Reach)

[40] Hint: Not Described (Outflow=Inflow)

Inflow Area =                 1.4653 ha, 0.00% Impervious, Inflow Depth = 21 mm for 10-Year event
Inflow     =               0.63011 [email protected] hrs, Volume=          0.306 Ml
Outflow    =               0.63011 [email protected] hrs, Volume=          0.306 Ml, Atten= 0%, Lag= 0.0 min

Routing by Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs

                                               Reach 4R: (new Reach)
                                            Hydrograph

                   0.63011 m³/s                                                               Inflow
                 0.7
                 0.63011 m³/s                                                                 Outflow
                                                           Inflow Area=1.4653 ha
                 0.6

                 0.5
   Flow (m³/s)




                 0.4

                 0.3

                 0.2

                 0.1

                  0
                       0                   1                   2                    3
                                                Time (hours)

Page 74

     2S

total roof area
                                                                                              4R

                                                                                        (new Reach)




Subcat      Reach   Pond   Link   Routing Diagram for roof catchment Post development Q10 Cooroy chicken farm
                                     Prepared by {enter your company name here}, Printed 24/04/2013
                                      HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC

Page 75

roof catchment Post development Q10 noosa 10-Year Duration=6 min, Inten=208.9 mm/hr
Prepared by {enter your company name here}                                       Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC                             Page 2

                         Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
                         Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
                Reach routing by Stor-Ind method - Pond routing by Stor-Ind method

Subcatchment 2S: total roof area      Runoff Area=14,653.0 m² 100.00% Impervious Runoff Depth=28 mm
                                                      Tc=6.0 min C=1.00 Runoff=0.85149 m³/s 0.413 Ml

Reach 4R: (new Reach)                                                    Inflow=0.85149 m³/s 0.413 Ml
                                                                        Outflow=0.85149 m³/s 0.413 Ml

           Total Runoff Area = 1.4653 ha Runoff Volume = 0.413 Ml Average Runoff Depth = 28 mm
                                       0.00% Pervious = 0.0000 ha 100.00% Impervious = 1.4653 ha

Page 76

roof catchment Post development Q10 noosa 10-Year Duration=6 min, Inten=208.9 mm/hr
Prepared by {enter your company name here}                                                Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC                                      Page 3

                                     Summary for Subcatchment 2S: total roof area

Runoff               =       0.85149 [email protected] hrs, Volume=         0.413 Ml, Depth= 28 mm

Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
noosa 10-Year Duration=6 min, Inten=208.9 mm/hr

                 Area (m²)       C    Description
                  14,653.0    1.00    LIGHT GRASS ON clay
                  14,653.0            100.00% Impervious Area

    Tc   Length Slope Velocity Capacity Description
  (min) (meters) (m/m) (m/sec)         (m³/s)
    5.0                                       Direct Entry, metal
    5.0      0.0 Total, Increased to minimum Tc = 6.0 min

                                           Subcatchment 2S: total roof area
                                               Hydrograph

                  0.85149 m³/s                                                                   Runoff
                  0.9
                                                                         noosa 10-Year
                  0.8                                                   Duration=6 min,
                  0.7                                                Inten=208.9 mm/hr
                  0.6                                           Runoff Area=14,653.0 m²
   Flow (m³/s)




                                                                Runoff Volume=0.413 Ml
                  0.5                                             Runoff Depth=28 mm
                  0.4                                                       Tc=6.0 min
                  0.3                                                           C=1.00
                  0.2
                  0.1
                    0
                        0                     1                     2                   3
                                                   Time (hours)

Page 77

roof catchment Post development Q10 noosa 10-Year Duration=6 min, Inten=208.9 mm/hr
Prepared by {enter your company name here}                                               Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC                                     Page 4

                                       Summary for Reach 4R: (new Reach)

[40] Hint: Not Described (Outflow=Inflow)

Inflow Area =                 1.4653 ha,100.00% Impervious, Inflow Depth = 28 mm for 10-Year event
Inflow     =               0.85149 [email protected] hrs, Volume=           0.413 Ml
Outflow    =               0.85149 [email protected] hrs, Volume=           0.413 Ml, Atten= 0%, Lag= 0.0 min

Routing by Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs

                                               Reach 4R: (new Reach)
                                            Hydrograph

                   0.85149 m³/s                                                                Inflow
                 0.85149
                 0.9     m³/s                                                                  Outflow
                                                            Inflow Area=1.4653 ha
                 0.8
                 0.7
                 0.6
   Flow (m³/s)




                 0.5
                 0.4
                 0.3
                 0.2
                 0.1
                  0
                       0                   1                    2                    3
                                                Time (hours)

Page 78

                                                            Callaghan & Toth


APPENDIX 6                 -        SECURITY OF ROOFWATER SUPPLY

                                    CALCULATIONS




                                                                             F
1209 Animal Husbandry – Top Forestry Rd, Ridgewood             SWQMP_REV_3
SEPTEMBER 2013

Page 79

1209 Millighan Farms

Q.= 6398.672 monthly runoff (m3) in month t

= coefficient of run-off

B= initial loss (mm)
= roof area connected to tank (m’)
P= 487.2 monthly rainfall (mm) in month t
Vy= 55 volume of water in tank at the end of month t (m3)
Ver = volume of water in tank at start of month t (m*)

Q.= 6398.672 monthly inflow (m3) during month t

D=
T=

  
 

month demand (m?)

tank volume (m’)

0.878

Palmwoods Rainfall Data 1930-2007 P| 12.164 %

Year

1930
1930
1930
1930
1930
1930
1930
1930
1930
1930
1930
1930
1931
1931
1931
1931
1931
1931
1931
1931
1931
1931
1931
1931
1932
1932
1932
1932

Month PL Q Ver

487.2 6398.672 0
141.2 1835.728 1600
196.1 2559.733 0
91.7 1182.937 0
225.3 2944.813 0
472.2 6200.857 0
40.6 509.0452 1600
52.1 660.7038 0
32 395.631 0
49.3 623.7782 0
56.1 713.4546 0
0

0

0

ODMNDUNRWNPR

PPR
NRO

77.5 995.6714
291.6 3819.158
586.2 7704.254

352 4615.695 1600

85.3 1098.535 1600
107.2 1387.346

38.1 476.076

38.1 476.076

41.9 526.1892

51.6 654.1099

25.1 304.6359
180.1 2348.729
260.6 3410.339

20.3 241.3349
133.4 1732.864

76.2 978.5273
201.2 2626.99

CODNDUNEBRWNHR

PPR
NRO

 

ec00C0DCDOOCOOoOD

BWNR

Page 80

1932
1932
1932
1932
1932
1932
1932
1932
1933
1933
1933
1933
1933
1933
1933
1933
1933
1933
1933
1933
1934
1934
1934
1934
1934
1934
1934
1934
1934
1934
1934
1934
1935
1935
1935
1935
1935
1935
1935
1935
1935
1935
1935
1935
1936
1936
1936
1936
1936
1936
1936
1936
1936
1936
1936
1936
1937

on ran

PPR
NRO

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

RPR
RNRO

59.4
48.8
10.2
22.9
76.2
81.8
67.1
95
145.3
118.1
69.9
304.3
25.1
62
129.5
34.8
115.6
160.8
377.7
348.2
126.5
396.7
100.8
269.7
193.8
34.3
102.9
40.4
24.4
116.3
188.5
194.3
166.9
397.3
118.1
155.4
72.6
0.8
109.2
117.9
103.6
143.3
24.1
126.2
162.8
83.8
364.2
67.6
131.1
128
23.1
9.1
16.3
26.7
63
35.1
56.1

756.974
617.1844
108.1391
275.6229
978.5273
1052.378
858.5193
1226.456
1889.797
1531.092
895.4448
3986.642
304.6359

791.262
1681.432
432.5566
1498.123
2094.207
4954.619
4565.582
1641.869
5205.185
1302.945
3530.347
2529.401
425.9627
1330.639
506.4077
295.4045
1507.354
2459.506
2535.995
2174.652
5213.098
1531.092
2022.993
931.0516

-15.8252
1413.721
1528.454

1339.87
1863.422
291.4482
1637.912
2120.582
1078.754
4776.585
865.1131
1702.532

1661.65
278.2605
93.63267
188.5841
325.7362
804.4497
436.5129
713.4546

ooo ooo mo momo mo)

31.64171

ooo000

999.6189
1600

0
1250.185

ooo moomoo mo momo)

1258.098

e000 DOOACOOoOD

821.5849

oo0o0aCoOoOoOo

-3198.03
-3337.82
-3846.86
-3679.38
-2976.47
-2902.62
-3096.48
-2728.54
-2065.2
-2423.91
-3059.56
31.64171
-3618.72
-3163.74
-2273.57
-3522.44
-2456.88
-1860.79
999.6189
1600
-713.131
1250.185
-1401.87
-424.653
-1425.6
-3529.04
-2624.36
-3448.59
-3659.6
-2447.65
-1495.49
-1419.01
-1780.35
1258.098
-1165.81
-1932.01
-3023.95
-3970.83
-2541.28
-2426.55
-2615.13
-2091.58
-3663.55
-2317.09
-1834.42
-2876.25
821.5849
-2268.3
-2252.47
-2293.35
-3676.74
-3861.37
-3766.42
-3629.26
-3150.55
-3518.49
-3241.55

 

Page 81

1937
1937
1937
1937
1937
1937
1937
1937
1937
1937
1937
1938
1938
1938
1938
1938
1938
1938
1938
1938
1938
1938
1938
1939
1939
1939
1939
1939
1939
1939
1939
1939
1939
1939
1939
1940
1940
1940
1940
1940
1940
1940
1940
1940
1940
1940
1940
1941
1941
1941
1941
1941
1941
1941
1941
1941
1941

OMNDUNRWHN

PPR
NRO

R
COMNDAUARWNR

RR
NB

R
COMNDAUARWNR

RR
NB

b
COMNAURWNR

RR
NB

OMNDKHEWNRK

b
°

198.6
494.5
50
23.9
49.3
53.1
81.3
8.1
222.5
342.6
131.1
478.3
107.2
312.9
25.9
678.4
89.4
101.3
18.8
21.8
106.2
135.4
13.7
102.6
82
466.3
210.1
121.2
104.4
86.6
85.3
12.7
775
103.9
775
122.4
352.6
298.2
96
80.8
82.3
72.6
85.1
7.9
24.1
114
115.6
275.1
160.8
228.1
175.5
271.5
93
7.6
15.7
6.9
21.3

2592.702
6494.942
633.0096
288.8106
623.7782
673.8915
1045.785
80.44497
2907.888
4491.731
1702.532
6281.302
1387.346
4100.056

315.186

8920.16
1152.605
1309.539
221.5534
261.1165
1374.158
1759.239
154.2961
1326.683
1055.016
6123.049

2744.36
1571.974

1350.42
1115.679
1098.535
141.1084
995.6714
1343.827
995.6714
1587.799
4623.608
3906.197
1239.644
1039.191
1058.972
931.0516
1095.898
77.80743
291.4482
1477.022
1498.123
3601.561
2094.207
2981.739
2288.066
3554.085
1200.081
73.85112
180.6715
64.61973
254.5226

0
0
1600

ooo00 00

536.7306
0

1600

0
145.0559
0

1600

oo0o0aCoOoOoOo

1600
389.3604

oo0o0aCoOoOoOo

668.6076
619.8044

COCO 0ODDOO OOO OOO OOOO OD

-1362.3
1600
-1721.99
-3666.19
-3331.22
-3281.11
-2909.22
-3874.56
-1047.11
536.7306
-1715.74
1600
-967.654
145.0559
-3494.76
1600
-1202.4
-2645.46
-3733.45
-3693.88
-2580.84
-2195.76
-3800.7
-2628.32
-2899.98
1600
389.3604
-1993.67
-2604.58
-2839.32
-2856.46
-3813.89
-2959.33
-2611.17
-2959.33
-2367.2
668.6076
619.8044
-2095.55
-2915.81
-2896.03
-3023.95
-2859.1
-3877.19
-3663.55
-2477.98
-2456.88
-353.439
-1860.79
-973.261
-1666.93
-400.915
-2754.92
-3881.15
-3774.33
-3890.38
-3700.48

 

Page 82

1941
1941
1942
1942
1942
1942
1942
1942
1942
1942
1942
1942
1942
1942
1943
1943
1943
1943
1943
1943
1943
1943
1943
1943
1943
1943
1944
1944
1944
1944
1944
1944
1944
1944
1944
1944
1944
1944
1945
1945
1945
1945
1945
1945
1945
1945
1945
1945
1945
1945
1946
1946
1946
1946
1946
1946
1946

RR
NB

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

PPR
NRO

NOUBRWNR

49.3
64.8
130.8
379.2
58.7
182.9
32.3
67.8
74.9
24.4
8.4
205.7
89.9
456.7
177.3
122.2
74.9
95.5
30.5
45.5
0.8
52.1
161
252.5
59.7
152.9
423.4
80.3
136.4
4.6
59.2
83.8
162.6
45.7
72.6
50.5
80
125.7
120.4
237.2
131.6
162.3
69.9
230.1
122.2
15
72.1
98.8
105.7
186.4
236.2
212.3
553.5
175.8
28.2
41
15.2

623.7782
828.1876
1698.576
4974.4
747.7426
2385.655
399.5873
867.7507
961.3833
295.4045
84.40128
2686.334
1159.199
5996.447
2311.804
1585.162
961.3833
1233.05
375.8495
573.665
-15.8252
660.7038
2096.844
3303.519
760.9303
1990.024
5557.297
1032.597
1772.427
34.28802
754.3364
1078.754
2117.945
576.3025
931.0516
639.6035
1028.641
1631.318
1561.424
3101.747
1709.126
2113.988
895.4448
3008.114
1585.162
-6.59385
924.4578
1276.569
1367.564
2431.812
3088.559
2773.373
7273.017
2292.022
345.5177
27.69417
174.0776

1019.

RB
8
SCOCO OOO OOOO OKO OOO OO OOOO ROO OD

RB
aD
S
fo)

ScOCDOOOO OOO OOOO OOOO OOOO OOD

 

Page 83

1946
1946
1946
1946
1946
1947
1947
1947
1947
1947
1947
1947
1947
1947
1947
1947
1947
1948
1948
1948
1948
1948
1948
1948
1948
1948
1948
1948
1948
1949
1949
1949
1949
1949
1949
1949
1949
1949
1949
1949
1949
1950
1950
1950
1950
1950
1950
1950
1950
1950
1950
1950
1950
1951
1951
1951
1951

OMNDKHEWNRK

PPR
NRO

R
COMNDAUARWNR

RR
NB

b
COMNAURWNR

RR
NB

OMNDKHEWNRK

Pe
RO

12

82
87.9
38.1
89.2

160
644.9
537.7
157.7

94.5
79
22.1
36.3
128.8
49.3
196.3
167.9
140.7
135.4
359.9
211.3
199.6
148.8
6.1
37.6
66
15
73.4
211.1
146.6
278.9
417.1
78.2
96.8
42.2
52.8
17.3

140

372.1

94.2
150.9
219.5
856.5

270

151.4
43.7
170.7
371.9
66.3
17.8
133.6

237
153.2
859.8

137
217.3

16.3

-13.1877
1055.016
1132.823
476.076
1149.967
2083.657
8478.372
7064.651
2053.325
1219.862
77.80743
265.0728
452.3381
1672.2
623.7782
2562.37
2187.839
1829.134
1759.239
4719.878
2760.186
2605.89
1935.954
54.06957
469.4821
844.0128
-6.59385
941.6018
2757.548
1906.941
3651.674
5474.214
1004.903
1250.194
530.1455
669.9352
201.7718
1819.903
4880.768
1215.906
1963.649
2868.325
11268.89
3534.304
1970.242
549.9271
2224.765
4878.13
847.9691
208.3657
1735.501
3099.11
1993.98
11312.41
1780.34
2839.312
188.5841

ooo moomoo mo momo)

764.8778

eco0ooocCOOaCoO OO

1519.214

ooo000

925.7678

1600
1179.304

923.1302
0
0
0
0
0
1600

0
0

-3968.19
-2899.98
-2822.18
-3478.92
-2805.03
-1871.34
1600
1600
-301.675
-2735.14
-3877.19
-3689.93
-3502.66
-2282.8
-3331.22
-1392.63
-1767.16
-2125.87
-2195.76
764.8778
-429.937
-1349.11
-2019.05
-3900.93
-3485.52
-3110.99
-3961.59
-3013.4
-1197.45
-2048.06
-303.326
1519.214
-1430.88
-2704.81
-3424.85
-3285.06
-3753.23
-2135.1
925.7678
-1813.33
-1991.35
-1086.68
1600
1179.304
-805.454
-3405.07
-1730.24
923.1302
-2183.9
-3746.63
-2219.5
-855.891
-1961.02

 

1600
-574.661
-1115.69
-3766.42

Page 84

1951
1951
1951
1951
1951
1951
1951
1951
1952
1952
1952
1952
1952
1952
1952
1952
1952
1952
1952
1952
1953
1953
1953
1953
1953
1953
1953
1953
1953
1953
1953
1953
1954
1954
1954
1954
1954
1954
1954
1954
1954
1954
1954
1954
1955
1955
1955
1955
1955
1955
1955
1955
1955
1955
1955
1955
1956

on ran

PPR
NRO

OMNDKHEWNRK

PPR
NRO

OMNDUERWNR

PPR
NRO

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

RPR
RNRO

48.7
9.7
1.3

14.5

21.6

115.3
15
32.5
84.3
152.1
261.4
111.4
91.6
158.2

94.8

91.8

38.3

182.1
40.4
92.2

238.7

664.4

275.3

138.7
37.1

19.6
107.4
31.6
158.8
167.1
94.3
234.2
675.3
122.2
76.5
79
49.2
465.7
93.1
80
221.1
111.2
86.6
151.9
172.4
721.7
268
306.3
64.8
53.9
35.7
7.6
93.4
29.3
223.5
226.8

615.8656
101.5453
-9.23139
164.8463
258.4789
1494.166
-6.59385
402.2249
1085.348
1979.474
3420.889
1442.734
1181.618
2059.919
1223.819
1184.255
478.7135
2375.105
506.4077
1189.531
3121.529
8735.532
3604.198
1802.759
462.8883
-26.3754
232.1035
1389.984
390.3559
2067.831
2177.289
1217.225
3062.184
8879.278
1585.162
982.4837
1015.453
622.4594
6115.136
1201.399
1028.641
2889.425
1440.097
1115.679
1976.836
2247.184
9491.188
3507.928
4013.017
828.1876
684.4416
444.4255
73.85112
1205.356
360.0242
2921.076
2964.595

SOOO COO OOOO OOOO OO OOOO OD

RB
aD
S
S

1249.198

eco00DcCOOCO oO

1600
1152.928
1210.945

ooo00 00

-3339.13
-3853.45
-3964.23
-3790.15
-3696.52
-2460.83
-3961.59
-3552.78
-2869.65
-1975.53
-534,.111
-2512.27
-2773.38
-1895.08
-2731.18
-2770.74
-3476.29
-1579.9
-3448.59
-2765.47
-833.471
1600
1249.198
-903.043
-3492.11
-3981.38
-3722.9
-2565.02
-3564.64
-1887.17
-1777.71
-2737.78
-892.816
1600
-769.838
-2972.52
-2939.55
-3332.54
1600
-1153.6
-2926.36
-1065.57
-2514.9
-2839.32
-1978.16
-1707.82
1600
1152.928
1210.945
-1915.87
-3270.56
-3510.57
-3881.15
-2749.64
-3594.98
-1033.92
-990.405

 

Page 85

1956
1956
1956
1956
1956
1956
1956
1956
1956
1956
1956
1957
1957
1957
1957
1957
1957
1957
1957
1957
1957
1957
1957
1958
1958
1958
1958
1958
1958
1958
1958
1958
1958
1958
1958
1959
1959
1959
1959
1959
1959
1959
1959
1959
1959
1959
1959
1960
1960
1960
1960
1960
1960
1960
1960
1960
1960

OMNDUNRWHN

PPR
NRO

R
COMNDAUARWNR

RR
NB

R
COMNDAUARWNR

RR
NB

R
COMNDAUARWNR

RR
NB

OMNDKHEWNRK

R
°

321.5
933.1
181.3
113.1
159.8
58
22.3
44.3
43.4
84.3
287.3
181.8
151.6
95.9
25.7
3.3
43.1
96.6
68.9
6.9
36.4
32.3
19.3
199.1
274.4
181.5
438.1
44.5
521.7

46.1
58.4
28.7
100.1
308.7
329.1
304.7
313.7
59.6
58.4
46.8
111.4
30.3
136.1
267.7
289.2
237.3
163.7
208.6
124.1
101.6
140
23.9
34.8
8.6
5.8
64.5

4213.47
12279.07
2364.555
1465.153
2081.019
738.5112
267.7103
557.8397
545.9708
1085.348
3762.451
2371.148

1972.88
1238.325
312.5485
17.14401
542.0145
1247.556
882.2571
64.61973
453.6569
399.5873
228.1472
2599.296
3592.329
2367.192
5751.156
560.4773
6853.648

0
581.5776
743.7863
352.1116
1293.713
4044.668
4313.697
3991.917
4110.606
759.6115
743.7863

590.809
1442.734
373.2119
1768.471
3503.972
3787.507
3103.066
2132.451
2724.579
1610.218
1313.495
1819.903
288.8106
432.5566
87.03882
50.11326
824.2313

0
258.4702
1600
9.55461

SCOOODDO OOOO OOOO OO OOOO OOD

1600
0
1600

0
0
0
0
0
89.66759
448.3643

485.2811
640.8871

COCO 0ODDOO OOO OOO OOOO OD

258.4702
1600
9.55461
-2480.29
-1873.98
-3216.49
-3687.29
-3397.16
-3409.03
-2869.65
-192.549
-1583.85
-1982.12
-2716.67
-3642.45
-3937.86
-3412.99
-2707.44
-3072.74
-3890.38
-3501.34
-3555.41
-3726.85
-1355.7
-362.671
-1587.81
1600
-1794.52
1600
-2355
-3373.42
-3211.21
-3602.89
-2661.29
89.66759
448.3643
485.2811
640.8871
-2554.5
-3211.21
-3364.19
-2512.27
-3581.79
-2186.53
-451.028
-167.493
-851.934
-1822.55
-1230.42
-2344.78
-2641.51
-2135.1
-3666.19
-3522.44
-3867.96
-3904.89
-3130.77

 

Page 86

1960
1960
1961
1961
1961
1961
1961
1961
1961
1961
1961
1961
1961
1961
1962
1962
1962
1962
1962
1962
1962
1962
1962
1962
1962
1962
1963
1963
1963
1963
1963
1963
1963
1963
1963
1963
1963
1963
1964
1964
1964
1964
1964
1964
1964
1964
1964
1964
1964
1964
1965
1965
1965
1965
1965
1965
1965

RR
NB

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

PPR
NRO

NOUBRWNR

138
58.4
229.9
478.6
103
118.7
84.9
27.4
39.1
31.8
101.1
158.3
323.5
202.4
226.7
110
381.1
168.1
13.8
23.2
100.3
30.1
28.3
13.2
79.4
289.3
498.9
121.6
749.7
83.2
225.6
14
2.5
88.8
12.7
84.7
130.4
140.7
68.9
231.6
448.9
156.8
144.5
29.7
84
26.7
111.8
43.9
185.8
113.8
205.5
107.7
29.7
111.9
120.9
234.5
130.8

1793.527
743.7863
3005.477
6285.258
1331.958
1539.005

1093.26
334.9676
489.2637
392.9935
1306.901
2061.238
4239.846
2642.815
2963.276
1424.272
4999.457
2190.477
155.6149
279.5792
1296.351
370.5744
346.8365
147.7022
1020.728
3788.826
6552.968
1577.249
9860.443
1070.841

2948.77
158.2524

6.59385
1144.692
141.1084
1090.623
1693.301
1829.134
882.2571
3027.896
5893.583
2041.456
1879.247
365.2993
1081.391
325.7362
1448.009
552.5646
2423.899
1474.385
2683.697

1393.94
365.2993
1449.328
1568.018

3066.14
1698.576

ocoo0cCoOoOo

284.8456

1044.457

oo0o0aCoOoOoOo

1600

1600

ooo moomoo mo momo)

RB
aD
S
S

SCO COODCO OOO OOOO OD

   
 
 
 
 
 
 
  
  
 
 
  
  
  
 
  
 
  
 
  
  
  
 
 
  
 
 
 
 
 
  
  
  
  
  
 
 
  
  
 
 
 
 
 
  
 
  
 
 
 
 
 
 
  
 
 
  

-2161.47
-3211.21
-949.523
1600
-1023.04
-2416
-2861.74
-3620.03
-3465.74
-3562.01
-2648.1
-1893.76
284.8456
-1027.34
-991.724
-2530.73
1044.457
-720.066
-3799.39
-3675.42
-2658.65
-3584.43
-3608.16
-3807.3
-2934.27
-166.174
1600
-777.751
1600
-1284.16
-1006.23
-3796.75
-3948.41
-2810.31
-3813.89
-2864.38
-2261.7
-2125.87
-3072.74
-927.104
1600
-313.544
-2075.75
-3589.7
-2873.61
-3629.26
-2506.99
-3402.44
-1531.1
-2480.62
-1271.3
-2561.06
-3589.7
-2505.67
-2386.98
-888.86
-2256.42

Page 87

1965
1965
1965
1965
1965
1966
1966
1966
1966
1966
1966
1966
1966
1966
1966
1966
1966
1967
1967
1967
1967
1967
1967
1967
1967
1967
1967
1967
1967
1968
1968
1968
1968
1968
1968
1968
1968
1968
1968
1968
1968
1969
1969
1969
1969
1969
1969
1969
1969
1969
1969
1969
1969
1970
1970
1970
1970

PPR
NBO © 0

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

PPR
NRO

BWNR

127
$1
158.9
222
189.9
71.4
144.2
230.3
148.7
36.9
114
47.3
117.9
41.1
126.3
90.7
425.5
444.8
121.4
314.7
79.2
129.4
493.7
74.3
42.7
14.5
144.7
83.6
98.7
667.9
237.5
85.2
45.2
72.1
42.1
62.7
52.6

32.9
124
21.3
54.4
126.5
91.9
62.4
361.9
29.2
79.5
137.4
52.1
330.6
167.9
107.8
543.3
266.3
90.1
121.3

1648.463
646.1973

2069.15
2901.294
2477.969
915.2264
1875.291
3010.752
1934.636
460.2507
1477.022
597.4028
1528.454
515.6391
1639.231
1169.749
5584.991
5839.514
1574.611
4123.794

1018.09
1680.113
6484,392
953.4707
536.7394
164.8463
1881.885
1076.116
1275.251
8781.689
3105.703
1097.217
569.7086
924.4578
528.8268
800.4934
667.2976
-26.3754
407.4999
1608.899
254.5226
691.0355
1641.869
1185.574
796.5371
4746.253
358.7054
1022.047
1785.615
660.7038
4333.478
2187.839
1395.259
7138.502
3485.509
1161.836
1573.293

Sc000OCO OOOO OOOO OOD

1600
1600

0
168.7938

RB
aD
S
S

750.7034

ecoC0O0DoCoO OO Fa OOOO Oo

791.2532

378.4782
0

0

1600
1130.509
0

-2306.54
-3308.8
-1885.85
-1053.71
-1477.03
-3039.77
-2079.71
-944,248
-2020.36
-3494.75
-2477.98
-3357.6
-2426.55
-3439.36
-2315.77
-2785.25
1600
1600
-780.389
168.7938
-2768.12
-2274.89
1600
-1401.53
-3418.26
-3790.15
-2073.12
-2878.88
-2679.75
1600
750.7034
-2107.08
-3385.29
-3030.54
-3426.17
-3154.51
-3287.7
-3981.38
-3547.5
-2346.1
-3700.48
-3263.96
-2313.13
-2769.43
-3158.46
791.2532
-2805.04
-2932.95
-2169.39
-3294.3
378.4782
-1388.68
-2559.74
1600
1130.509
-1662.65
-2381.71

 

Page 88

1970
1970
1970
1970
1970
1970
1970
1970
1971
1971
1971
1971
1971
1971
1971
1971
1971
1971
1971
1971
1972
1972
1972
1972
1972
1972
1972
1972
1972
1972
1972
1972
1973
1973
1973
1973
1973
1973
1973
1973
1973
1973
1973
1973
1974
1974
1974
1974
1974
1974
1974
1974
1974
1974
1974
1974
1975

on ran

PPR
NRO

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

RPR
RNRO

24.1
20.1
37.3
33.6
89.5
221.6
686.1
407.8
581.9
167.5
72.2
13.2
16.8
49.2
96.8
29.6
83.6
59.5
325.8
215.6
811.1
189
214.1
205.8
61.9

2.8
5.3
266.6
298.8
58.9
246.5
357.4
104.7
75.4
68.6
41.2
736.3
41.4
56.1
206.2
71.9
206
811
313.2
395.7
226.5
174.1
46.5
22.6
75.5
37
105.1
351.1
25.2
165

-26.3754
291.4482
238.6974
465.5258
416.7313
1153.924
2896.019
9021.706
5351.569
7647.547
2182.564
925.7765
147.7022

195.178
622.4594

1250.194
363.9805
1076.116
758.2928
4270.177
2816.893
10670.17

2466.1

2797.111
2687.653
789.9432

-26.3754
10.55016
43.51941
3489.465
3914.109
750.3801
3224.393
4686.909
1354.377
967.9772
878.3008
516.9578
9683.728
519.5954
713.4546
2692.928
921.8202
2690.291
10668.85
4104.012
5191.997
2960.639
2269.603
586.8527
271.6666

969.296
461.5695

1359.652
4603.826
305.9546
2149.595

oo0o0cCooOo

1600
1600
1600

oo0o0aCoOoOoOo

315.1773
0

1600
111.0999

eco00cCOCOCOoO Oo

731.9086

1600
0
0
0
0
0
1600
1600

1600
605.6387

ooo000

648.8261
0

-3981.38
-3663.55
-3716.3
-3489.47
-3538.27
-2801.08
-1058.98
1600
1600
1600
-172.436
-3029.22
-3807.3
-3759.82
-3332.54
-2704.81
-3591.02
-2878.88
-3196.71
315.1773
-822.93
1600
111.0999
-1046.79
-1267.35
-3165.06
-3981.38
-3944.45
-3911.48
-465.535
-40.8906
-3204.62
-730.607
731.9086
-1868.71
-2987.02
-3076.7
-3438.04
1600
-1835.4
-3241.55
-1262.07
-3033.18
-1264.71
1600
1600
1600
605.6387
-1079.76
-3368.15
-3683.33
-2985.7
-3493.43
-2595.35
648.8261
-3000.22
-1805.4

 

Page 89

1975
1975
1975
1975
1975
1975
1975
1975
1975
1975
1975
1976
1976
1976
1976
1976
1976
1976
1976
1976
1976
1976
1976
1977
1977
1977
1977
1977
1977
1977
1977
1977
1977
1977
1977
1978
1978
1978
1978
1978
1978
1978
1978
1978
1978
1978
1978
1979
1979
1979
1979
1979
1979
1979
1979
1979
1979

OMNDUNRWHN

PPR
NRO

R
COMNDUNUEWNHRK

RR
NB

R
COMNDUNUEWNHRK

RR
NB

R
COMNDUNUEWNHRK

RR
NB

OMNDKHEWNRK

R
oO

155.5
108
156.5
38.5
111
31
65.5
93
76.5
160.5
218
327
346
435
196
234
23
61.5

72.5
105.5
119.5

55.5

147
149
174
42.5
58
40.5
58.5
15
28
96.5
178

50.5

124.5
198
404

48
137
52.5
59
54.5
103

40.5
211.5
182.5

382
129
88
70.5
23.5
78
28

22.5
113

2024.312
1397.896
2037.5
481.3511
1437.459
382.4433
837.419
1200.081
982.4837
2090.25
2848.543
4286.003
4536.569
5710.274
2558.414
3059.546
276.9417
784.6682
13.1877
929.7329
1364.927
1549.555
705.542
1912.217
1938.592
2268.284
534.1019
738.5112
507.7265
745.1051
171.4401
342.8802
1246.238
2321.035
639.6035
1615.493
2584.789
5301.455
606.6342
1780.34
665.9789
751.6989
692.3543
1331.958
507.7265
2762.823
2380.38
5011.326
1674.838
1134.142
903.3575
283.5356
1002.265
342.8802
13.1877
270.3479
1463.835

leo ooo momo mo}

331.0025
912.5713

1600
203.4138

ecOCOOOO OOOO OOO OOOO OOOO

1346.455

ooo0ao0acCoO0oo

1056.326

ooooao0000

-1930.69
-2557.1
-1917.5

-3473.65

-2517.54

-3572.56

-3117.58

-2754.92

-2972.52

-1864.75

-1106.46

331.0025

912.5713

1600

203.4138
-692.04

-3678.06

-3170.33

-3941.81

-3025.27

-2590.07

-2405.45

-3249.46

-2042.78

-2016.41

-1686.72
-3420.9

-3216.49

-3447.27

-3209.89

-3783.56

-3612.12

-2708.76

-1633.96
-3315.4

-2339.51

-1370.21

1346.455

-2001.91

-2174.66

-3289.02
-3203.3

-3262.65

-2623.04

-3447.27

-1192.18

-1574.62

1056.326

-1223.84

-2820.86

-3051.64

-3671.46

-2952.73

-3612.12

-3941.81

-3684.65

-2491.17

 

Page 90

1979
1979
1980
1980
1980
1980
1980
1980
1980
1980
1980
1980
1980
1980
1981
1981
1981
1981
1981
1981
1981
1981
1981
1981
1981
1981
1982
1982
1982
1982
1982
1982
1982
1982
1982
1982
1982
1982
1983
1983
1983
1983
1983
1983
1983
1983
1983
1983
1983
1983
1984
1984
1984
1984
1984
1984
1984

RR
NB

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

PPR
NRO

NOUBRWNR

169
70
185.5
215.5
16.5
56
355.5
15.5
64
41.5

118.5
24.8
172.3
129.5
241
64
209
195.5
64
43.3
36

12

27
257.5
332
409
124
177
98
126

13
112
26
47
13
91
173
65
128
220
358
451
102
105
104
81
403
185
144
55
39
111
32
133
206

2202.346
896.7636
2419.943
2815.574
191.2217
712.1358
4661.852

178.034
817.6374
520.9142
-26.3754
1536.367
300.6796
2245.865
1681.432

3151.86
817.6374
2729.854

2551.82
817.6374

544.652
448.3818

131.877
329.6925
3369.457
4351.941
5367.394
1608.899
2307.848
1266.019
1635.275

13.1877
145.0647
1450.647
316.5048
593.4465
145.0647
1173.705
2255.097
830.8251

1661.65
2874.919
4694.821
5921.277

1318.77
1358.333
1345.145
1041.828
5288.268
2413.349
1872.653
698.9481
487.9449
1437.459

395.631
1727.589
2690.291

ooo00 00

x
S
a
&
a
N

COCO 0ODDOO OOO OOO OOOO OD

   
  
 
  
  
 
 
  
  
  
 
  
  
  
 
 
 
  
  
 
  
  
  
 
  
  
  
 
  
  
 
 
 
  
  
 
 
 
  
 
 
 
  
 
  
  
 
  
  
  
  
 
  
 
  

-1752.65
-3058.24
-1535.06
-1139.43
-3763.78
-3242.86
706.852
-3070.11
-3137.36
-3434.09
-3981.38
-2418.63
-3654.32
-1709.13
-2273.57
-803.14
-3137.36
-1225.15
-1403.18
-3137.36
-3410.35
-3506.62
-3823.12
-3625.31
-585.543
396.941
1600
-746.101
-1647.15
-2688.98
-2319.73
-3941.81
-3809.94
-2504.35
-3638.5
-3361.55
-3809.94
-2781.29
-1699.9
-3124.17
-2293.35
-1080.08
739.8212
1600
-1036.23
-2596.67
-2609.85
-2913.17
1333.268
-208.383
-2082.35
-3256.05
-3467.06
-2517.54
-3559.37
-2227.41
-1264.71

Page 91

1984
1984
1984
1984
1984
1985
1985
1985
1985
1985
1985
1985
1985
1985
1985
1985
1985
1986
1986
1986
1986
1986
1986
1986
1986
1986
1986
1986
1986
1987
1987
1987
1987
1987
1987
1987
1987
1987
1987
1987
1987
1988
1988
1988
1988
1988
1988
1988
1988
1988
1988
1988
1988
1989
1989
1989
1989

PPR
NBO © 0

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

PPepB
NRO

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

PPR
NRO

BWNR

11
20
175
43
119
105
77
479
75
107
50
224
52
69
71
86
90

32
38
84
40
148
16.5
143
74
70
201.5
144
163.5
153
210
115
117.5
106.5
128
97

77

215
85
190
135
82
241
542.5
50
164
211
73
22
38
36
414
251
220
377
713

118.6893
237.3786
2281.472
540.6957
1542.961
1358.333
989.0775
6290.533
962.7021
1384.709
633.0096
2927.669
659.385
883.5759
909.9513
1107.767
1160.518
395.631
474.7572
1081.391
501.1326
1925.404
191.2217
1859.466
949.5144
896.7636
2630.946
1872.653
2129.814
1991.343
2743.042
1490.21
1523.179
1378.115
1661.65
1252.832
989.0775

0
2808.98
1094.579
2479.288
1753.964
1055.016
3151.86
7127.952
633.0096
2136.407
2756.229
936.3267
263.754
474.7572
448.3818
5433.332
3283.737 1478.332
2874.919 807.0697
4945.388 0
9376.455 990.3875

oooaoa0a0oo

RB
8
CODCOD OO OOOO OOO OOOO OOO OOOO OOOO OOO OOOO GS

RB
aD
S
fo)

oooo0o0do

-3836.31
-3717.62
-1673.53
-3414.3
-2412.04
-2596.67
-2965.92
1600
-1392.3
-2570.29
-3321.99
-1027.33
-3295.62
-3071.42
-3045.05
-2847.23
-2794.48
-3559.37
-3480.24
-2873.61
-3453.87
-2029.6
-3763.78
-2095.53
-3005.49
-3058.24
-1324.05
-2082.35
-1825.19
-1963.66
-1211.96
-2464.79
-2431.82
-2576.89
-2293.35
-2702.17
-2965.92
-3955
-1146.02
-2860.42
-1475.71
-2201.04
-2899.98
-803.14
1600
-1721.99
-1818.59
-1198.77
-3018.67
-3691.25
-3480.24
-3506.62
1478.332
807.0697
-273.012
990.3875
1600

 

Page 92

1989
1989
1989
1989
1989
1989
1989
1989
1990
1990
1990
1990
1990
1990
1990
1990
1990
1990
1990
1990
1991
1991
1991
1991
1991
1991
1991
1991
1991
1991
1991
1991
1992
1992
1992
1992
1992
1992
1992
1992
1992
1992
1992
1992
1993
1993
1993
1993
1993
1993
1993
1993
1993
1993
1993
1993
1994

on ran

PPR
NRO

OMNDKHEWNRK

PPR
NRO

OMNDNRWNR

PPR
NRO

OMNDKHEWNRK

PPR
NRO

OMNDKHEWNRK

bPeR
RNRO

223
$1
77

107
13
17

186

112
89

395

240

266

204

164
35

57
136
89
114
216
101
44
79
54
30

71
34
480
85
876
416
204
121
16
74
40.5
65

138
63
79

182

228
42
69
19

87.5

101
90
73

200

145

289

2914.482
646.1973
989.0775
1384.709
145.0647
197.8155
2426.537
1450.647
1147.33
5182.766
3138.673
3481.553
2663.915
2136.407
435.1941
92.3139
26.3754
725.3235
1767.152
1147.33
1477.022
2822.168
1305.582
553.8834
1015.453
685.7604
369.2556
-26.3754
39.5631
909.9513
422.0064
6303.721
1094.579
11526.05
5459.708
2663.915
1569.336
184.6278
949.5144
507.7265
830.8251
92.3139
1793.527
804.4497
1015.453
2373.786
2980.42
527.508
883.5759
224.1909
1127.548
1305.582
1160.518
936.3267
2611.165
1885.841
3784.87

1600
559.4817

ocoo0cCoOoOo

1227.766
411.4387

SCO ODCOO OOO OOOO OOOO OOD

1600

0

1600
1600
308.9154

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

559.4817
-2749.32
-2965.92
-2570.29
-3809.94

-3757.18
-1528.46
-2504.35
-2807.67
1227.766
411.4387
-62.0085
-1291.08
-1818.59
-3519.81
-3862.69
-3928.62
-3229.68
-2187.85
-2807.67
-2477.98
-1132.83
-2649.42
-3401.12
-2939.55
-3269.24
-3585.74
-3981.38
-3915.44
-3045.05
-3532.99
1600
-1260.42
1600
1600
308.9154
-2076.75
-3770.37
-3005.49
-3447.27
-3124.17
-3862.69
-2161.47
-3150.55
-2939.55
-1581.21
-974.58
-3427.49
-3071.42
-3730.81
-2827.45
-2649.42
-2794.48
-3018.67
-1343.84
-2069.16
-170.13

   

Page 93

1994
1994
1994
1994
1994
1994
1994
1994
1994
1994
1994
1995
1995
1995
1995
1995
1995
1995
1995
1995
1995
1995
1995
1996
1996
1996
1996
1996
1996
1996
1996
1996
1996
1996
1996
1997
1997
1997
1997
1997
1997
1997
1997
1997
1997
1997
1997
1998
1998
1998
1998
1998
1998
1998
1998
1998
1998

OMNDUNRWHN

PPR
NRO

R
COMNDUNUEWNHRK

RR
NB

R
COMNDUNUEWNHRK

RR
NB

R
COMNDUNUEWNHRK

RR
NB

OMNDNRWNR

R
oO

221
420
197
107
11
60
11
17
48
32
171
49
522
139
108
75
40

35
32
88
187
192
322
75
99
63
292
99
23
15
17
87.5
61
105
164
76
199
114
277
52
47
16
18
123
106
56
232
87
84
175
160
29
60
119
197
9

2888.106
5512.459
2571.602
1384.709
118.6893
764.8866
118.6893
197.8155
606.6342

395.631
2228.721
619.8219
6857.604
1806.715
1397.896
962.7021
501.1326

39.5631
435.1941

395.631
1134.142
2439.725
2505.663
4220.064
962.7021
1279.207
804.4497
3824.433
1279.207
276.9417
171.4401
197.8155
1127.548
778.0743
1358.333
2136.407
975.8898
2597.977
1477.022
3626.618

659.385
593.4465
184.6278
211.0032
1595.712
1371.521
712.1358
3033.171
1120.955
1081.391
2281.472
2083.657
356.0679
764.8866
1542.961
2571.602

92.3139

0
0
1557.459
174.0601

RB
8
ecOoOC0CoOOOO OOO FDO OOOO OOOO

N
D
a
oS
D
B

SeOoOCoO OOO OOOO OOO OOOO OOO OOOO OOOO OOD

  
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
  
 
 
  
 
  
  
  
  
  
 
  
  
  
  
 
  
 
  
  
  
 
 
  
  
  
 
  
 
  
 
  
  
 
 
  

-1066.89
1557.459
174.0601
-2396.23
-3836.31
-3190.11
-3836.31
-3757.18
-3348.37
-3559.37
-1726.28
-3335.18
1600
-548.285
-2557.1
-2992.3
-3453.87
-3915.44
-3519.81
-3559.37
-2820.86
-1515.28
-1449.34
265.064
-2727.23
-2675.79
-3150.55
-130.567
-2675.79
-3678.06
-3783.56
-3757.18
-2827.45
-3176.93
-2596.67
-1818.59
-2979.11
-1357.02
-2477.98
-328.383
-3295.62
-3361.55
-3770.37
-3744
-2359.29
-2583.48
-3242.86
-921.829
-2834.05
-2873.61
-1673.53
-1871.34
-3598.93
-3190.11
-2412.04
-1383.4
-3862.69

Page 94

1998
1998
1999
1999
1999
1999
1999
1999
1999
1999
1999
1999
1999
1999
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2001
2001
2001
2001
2001
2001
2001
2001
2001
2001
2001
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2003
2003
2003
2003
2003
2003
2003
2003
2003

RR
NB

OMNDKHEWNRK

PPR
NRO

ON DURWNPR

PPR
NRO

OMNDRWNPR

PPR
NRO

R
COMNDUNUEWNHRK

RR
NB

ODMNDKHEWNRK

115
96.5
215
672
348
160
440
223
149
91
103
136
83
262.3
70.5
132
105
195.5
150.5
80

239.5
162
130

44.4
200
220

58
49
69
14
21.5
35
189

115.5
114
105
113
107
134

86

142
14
77

102

185

560
143
164
167
11
62
124
4

1490.21
1246.238
2808.98
8835.759
4562.944
2083.657
5776.213
2914.482
1938.592
1173.705
1331.958
1767.152
1068.204
3432.758
903.3575
1714.401
1358.333
2551.82
1958.373
1028.641
39.5631
-26.3754
3132.079
2110.032
1688.026
559.1585
2611.165
2874.919
738.5112
619.8219
883.5759
158.2524
257.1602
435.1941
2466.1
1496.804
1477.022
1358.333
1463.835
1384.709
1740.776
1107.767
-26.3754
1846.278
158.2524
989.0775
1318.77
2413.349
39.5631
7358.737
1859.466
2136.407
2175.971
118.6893
791.262
1608.899
26.3754

ooo°o

1600
1600

1600
559.4817

SCOCDOOOOD OOOO OOOO OO OOOO OOOO OOO OO OC OOO OOOO OOD

   
 
  
 
 
  
  
  
 
 
 
  
 
 
  
 
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
  
 
 
  
 
  
  
  
  
  
 
 
  
 
  
  
 
 
  

-2464.79
-2708.76
-1146.02
1600
1600
-271.343
1600
559.4817
-1456.93
-2781.29
-2623.04
-2187.85
-2886.8
-522.242
-3051.64
-2240.6
-2596.67
-1403.18
-1996.63
-2926.36
-3915.44
-3981.38
-822.921
-1844.97
-2266.97
-3395.84
-1343.84
-1080.08
-3216.49
-3335.18
-3071.42
-3796.75
-3697.84
-3519.81
-1488.9
-2458.2
-2477.98
-2596.67
-2491.17
-2570.29
-2214.22
-2847.23
-3981.38
-2108.72
-3796.75
-2965.92
-2636.23
-1541.65
-3915.44
1600
-495.534
-1818.59
-1779.03
-3836.31
-3163.74
-2346.1
-3928.62

Page 95

2003
2003
2003
2004
2004
2004
2004
2004
2004
2004
2004
2004
2004
2004
2004
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2006
2006
2006
2006
2006
2006
2006
2006
2006
2006
2006
2007
2007
2007
2007
2007
2007
2007
2007
2007
2007

R
oO

96

57
260
269
188
250
186

RR
NB

13

OMNDKHEWNRK
N

27
103
159
199

181.5

46

31
200
193

29

31

34
116
327
255
159
193

36

89.3
57.6
41.6
124.6
37.8
98

74
75.7
295.2
118.6
18.8
119
136.6
375.4
152.5
60.8
214.8

PPR
NRO

OMNDAWNR

a
NO

OMNDAWNR

PPR
NRO

OMDHRUNAWNR

Pe
NO

average 139.4147

1239.644
725.3235
3402.427
3521.116
2452.912

3270.55
2426.537

65.9385
145.0647

13.1877

13.1877
329.6925
1331.958
2070.469
2597.977
2367.192
580.2588
382.4433
2611.165
2518.851
356.0679
382.4433
422.0064
1503.398
4286.003
3336.488
2070.469
2518.851
448.3818
1151.286
733.2361
522.2329
1616.812
472.1197
1266.019
949.5144
971.9335
3866.634
1537.686
221.5534
1542.961
1775.064
4924.287
1984.749
775.4368
2806.343

1812.184

ScOCDOOOO OOO OOOO OOOO OOOO OOD

331.0025

ecOoOCDoOoOoCoO OOO OOOO OOD

969.2872
0
0

-2715.36
-3229.68
-552.573
-433.884
-1502.09

-684.45
-1528.46
-3889.06
-3809.94
-3941.81
-3941.81
-3625.31
-2623.04
-1884.53
-1357.02
-1587.81
-3374.74
-3572.56
-1343.84
-1436.15
-3598.93
-3572.56
-3532.99

-2451.6
331.0025
-287.509
-1884.53
-1436.15
-3506.62
-2803.71
-3221.76
-3432.77
-2338.19
-3482.88
-2688.98
-3005.49
-2983.07
-88.3664
-2417.31
-3733.45
-2412.04
-2179.94
969.2872
-1000.96
-3179.56
-1148.66

 

Page 96

                                                             Callaghan & Toth


APPENDIX 7                 -        SECURITY OF DAM WATER SUPPLY

                                    CALCULATIONS




                                                                           G
1209 Animal Husbandry – Top Forestry Rd, Ridgewood              SWQMP_REV_3
SEPTEMBER 2013

Page 97

1209 Millighan Farms

Palmwoods Rainfall Data 1930-2007

Year

1930
1930
1930
1930
1930
1930
1930
1930
1930
1930
1930
1930
1931
1931
1931
1931
1931
1931
1931
1931
1931
1931
1931
1931
1932
1932
1932
1932
1932
1932

Q= 1940800 monthly runoff (m’) in month t

A= coefficient of run-off

B= initial loss (mm)

C= roof area connected to tank (m’)

P= 487.2 monthly rainfall (mm) in month t

Vy= 55 volume of water in tank at the end of montht (m?)

Ver = volume of water in tank at start of month t (m*)

Q= 1940800 monthly inflow (m3) during month t

Month

 

D,= month demand (m°)
T= tank volume (m°)

 

Pp, Q Vea Ve
1 487.2 1940800 0
2 141.2 556800 5000
3 196.1 776400 5000
4 91.7 358800 5000
5 225.3 893200 5000
6 472.2 1880800 5000
7 40.6 154400 5000
8 52.1 200400 5000
9 32 120000 5000
10 49.3 189200 5000
11 56.1 216400 5000
12 77.5 302000 5000
1 291.6 1158400 5000
2 586.2 2336800 5000
3 352 1400000 5000
4 85.3 333200 5000
5 107.2 420800 5000
6 38.1 144400 5000
7 38.1 144400 5000
8 41.9 159600 5000
9 51.6 198400 5000
10 25.1 92400 5000
11 180.1 712400 5000
12 260.6 1034400 5000
1 20.3 73200 5000
2 133.4 525600 5000
3 76.2 296800 5000
4 201.2 796800 5000
5 59.4 229600 5000
6 48.8 187200 5000

 

SOD OODO OOO OOOO ODO OOOO OOOO OOOO OOD

0.017
98.278 %

Page 98

1932
1932
1932
1932
1932
1932
1933
1933
1933
1933
1933
1933
1933
1933
1933
1933
1933
1933
1934
1934
1934
1934
1934
1934
1934
1934
1934
1934
1934
1934
1935
1935
1935
1935
1935
1935
1935
1935
1935
1935
1935
1935
1936
1936
1936
1936
1936
1936
1936
1936
1936
1936
1936
1936
1937
1937
1937
1937
1937

PPB
NPOWwwAN

OWMNDKHAWNR

PPB
NRO

OWMNDKHAWNR

PPB
NRO

CO©ONDUAWNR

Pepe
NRO

COMONDUAWNR

Pepe
NRO

URWNR

10.2
22.9
76.2
81.8
67.1
95
145.3
118.1
69.9
304.3
25.1
62
129.5
34.8
115.6
160.8
377.7
348.2
126.5
396.7
100.8
269.7
193.8
34.3
102.9
40.4
24.4
116.3
188.5
194.3
166.9
397.3
118.1
155.4
72.6
0.8
109.2
117.9
103.6
143.3
24.1
126.2
162.8
83.8
364.2
67.6
131.1
128
23.1
9.1
16.3
26.7
63
35.1
56.1
198.6
494.5
50
23.9

32800
83600
296800
319200
260400
372000
573200
464400
271600
1209200
92400
240000
510000
131200
454400
635200
1502800
1384800
498000
1578800
395200
1070800
767200
129200
403600
153600
89600
457200
746000
769200
659600
1581200
464400
613600
282400
-4800
428800
463600
406400
565200
88400
496800
643200
327200
1448800
262400
516400
504000
84400
28400
57200
98800
244000
132400
216400
786400
1970000
192000
87600

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

 

ScoCoOeC OOOO OOOO OOO OOO OOO OR OOOO OOOO OOOO OOO OOO OOOO OC OOOO OOO OOO OD

Page 99

1937
1937
1937
1937
1937
1937
1937
1938
1938
1938
1938
1938
1938
1938
1938
1938
1938
1938
1938
1939
1939
1939
1939
1939
1939
1939
1939
1939
1939
1939
1939
1940
1940
1940
1940
1940
1940
1940
1940
1940
1940
1940
1940
1941
1941
1941
1941
1941
1941
1941
1941
1941
1941
1941
1941
1942
1942
1942
1942

COMONDUAWNR

10
11

b b
COMI DNBWNRN

RR
NB

COMONDURWNR

10
11

BR
COON DAURWNRN

PPPR
NRO

BWNR

49.3
53.1
81.3
8.1
222.5
342.6
131.1
478.3
107.2
312.9
25.9
678.4
89.4
101.3
18.8
21.8
106.2
135.4
13.7
102.6
82
466.3
210.1
121.2
104.4
86.6
85.3
12.7
77.5
103.9
77.5
122.4
352.6
298.2
96
80.8
82.3
72.6
85.1
7.9
24.1
114
115.6
275.1
160.8
228.1
175.5
271.5
93
7.6
15.7
6.9
21.3
49.3
64.8
130.8
379.2
58.7
182.9

189200
204400
317200
24400
882000
1362400
516400
1905200
420800
1243600
95600
2705600
349600
397200
67200
79200
416800
533600
46800
402400
320000
1857200
832400
476800
409600
338400
333200
42800
302000
407600
302000
481600
1402400
1184800
376000
315200
321200
282400
332400
23600
88400
448000
454400
1092400
635200
904400
694000
1078000
364000
22400
54800
19600
77200
189200
251200
515200
1508800
226800
723600

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

 

SOD ODDODOO DODO OOOO ODDO O OD OOOO OOOO OOOO ODO OO OOO OO ODO OO OOOO OOO OO OOOO OD

Page 100

1942
1942
1942
1942
1942
1942
1942
1942
1943
1943
1943
1943
1943
1943
1943
1943
1943
1943
1943
1943
1944
1944
1944
1944
1944
1944
1944
1944
1944
1944
1944
1944
1945
1945
1945
1945
1945
1945
1945
1945
1945
1945
1945
1945
1946
1946
1946
1946
1946
1946
1946
1946
1946
1946
1946
1946
1947
1947
1947

32.3
67.8
74.9
24.4
8.4
205.7
89.9
456.7
177.3
122.2
74.9
95.5
30.5
45.5
0.8
52.1
161
252.5
59.7
152.9
423.4
80.3
136.4
4.6
59.2
83.8
162.6
45.7
72.6
50.5
80
125.7
120.4
237.2
131.6
162.3
69.9
230.1
122.2
1.5
72.1
98.8
105.7
186.4
236.2
212.3
553.5
175.8
28.2
41
15.2

wonrnaun

PPR
NRO

kB
SCO©M~YNAURWNPR

RR
NB

R
SCO©M~NAURWNPR

RR
NB

kB
CLOMID UBRWNPR

RR
NB

OWMNDKHAWNR

82
87.9
38.1
89.2
160
2 644.9
3 537.7

Ree
RNEO

121200
263200
291600
89600
25600
814800
351600
1818800
701200
480800
291600
374000
114000
174000
-4800
200400
636000
1002000
230800
603600
1685600
313200
537600
10400
228800
327200
642400
174800
282400
194000
312000
494800
473600
940800
518400
641200
271600
912400
480800
-2000
280400
387200
414800
737600
936800
841200
2206000
695200
104800
8400
52800
-4000
320000
343600
144400
348800
632000
2571600
2142800

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

5000
5000
5000
5000
5000
5000

 

ScoCOoOeCOOR OOOO OOOO OO OR OOOO OOO OOO OOO OOOO OO OOOO OR OOO OOO OOO OOO OD

Page 101

1947
1947
1947
1947
1947
1947
1947
1947
1947
1948
1948
1948
1948
1948
1948
1948
1948
1948
1948
1948
1948
1949
1949
1949
1949
1949
1949
1949
1949
1949
1949
1949
1949
1950
1950
1950
1950
1950
1950
1950
1950
1950
1950
1950
1950
1951
1951
1951
1951
1951
1951
1951
1951
1951
1951
1951
1951
1952
1952

C©OMNDUNA

RPPe
NRO

OWMNDKHAWNR

10
11

b b
CLOMID URWNRN

RR
NB

COMONDUAWNR

10
11

b b
COMI DNBWNRN

RR
NB

157.7
94.5
7.9
22.1
36.3
128.8
49.3
196.3
167.9
140.7
135.4
359.9
211.3
199.6
148.8
6.1
37.6
66
15
73.4
211.1
146.6
278.9
417.1
78.2
96.8
42.2
52.8
17.3
140
372.1
94.2
150.9
219.5
856.5
270
151.4
43.7
170.7
371.9
66.3
17.8
133.6
237
153.2
859.8
137
217.3
16.3
48.7
9.7
1.3
14.5
21.6
115.3
15
32.5
84.3
152.1

622800
370000
23600
80400
137200
507200
189200
777200
663600
554800
533600
1431600
837200
790400
587200
16400
142400
256000
-2000
285600
836400
578400
1107600
1660400
304800
379200
160800
203200
61200
552000
1480400
368800
595600
870000
3418000
1072000
597600
166800
674800
1479600
257200
63200
526400
940000
604800
3431200
540000
861200
57200
186800
30800
-2800
50000
78400
453200
-2000
122000
329200
600400

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

5000
5000
5000

5000
5000

 

SCOCOORCOORDCDCOOOOOOO OOO OOOO OOOO OOOO OOOO OOOO OR OOOO OOO OOO OOO OOO OD

Page 102

1952
1952
1952
1952
1952
1952
1952
1952
1952
1952
1953
1953
1953
1953
1953
1953
1953
1953
1953
1953
1953
1953
1954
1954
1954
1954
1954
1954
1954
1954
1954
1954
1954
1954
1955
1955
1955
1955
1955
1955
1955
1955
1955
1955
1955
1955
1956
1956
1956
1956
1956
1956
1956
1956
1956
1956
1956
1956
1957

C©OMNDH BW

Pepe
NRO

COMONDUAWNR

Pepe
NRO

COMONDUAWNR

Pepe
NRO

C©ONDURWNK

PPR
NRO

C©ONDURWNK

Pee
RNEO

261.4
111.4
91.6
158.2
94.8
91.8
38.3
182.1
40.4
92.2
238.7
664.4
275.3
138.7
37.1

19.6
107.4
31.6
158.8
167.1
94.3
234.2
675.3
122.2
76.5
79
49.2
465.7
93.1
80
221.1
111.2
86.6
151.9
172.4
721.7
268
306.3
64.8
53.9
35.7
7.6
93.4
29.3
223.5
226.8
321.5
933.1
181.3
113.1
159.8
58
22.3
44.3
43.4
84.3
287.3
181.8

1037600
437600
358400
624800
371200
359200
145200
720400
153600
360800
946800

2649600

1093200
546800
140400

-8000

70400
421600
118400
627200
660400
369200
928800

2693200
480800
298000
308000
188800

1854800
364400
312000
876400
436800
338400
599600
681600

2878800

1064000

1217200
251200
207600
134800

22400
365600
109200
886000
899200

1278000

3724400
717200
444400
631200
224000

81200
169200
165600
329200

1141200
719200

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

 

ScoCoOeC OOOO OOOO OOO OOO OOOO OOOO OC OOOO OC OOOO OC OOOO OR OOOO OOO OOO OOO OD

Page 103

1957
1957
1957
1957
1957
1957
1957
1957
1957
1957
1957
1958
1958
1958
1958
1958
1958
1958
1958
1958
1958
1958
1958
1959
1959
1959
1959
1959
1959
1959
1959
1959
1959
1959
1959
1960
1960
1960
1960
1960
1960
1960
1960
1960
1960
1960
1960
1961
1961
1961
1961
1961
1961
1961
1961
1961
1961
1961
1961

COMWNDURWN

PPR
NRO

R
SCO©M~NAURWNPR

RR
NB

R
SCO©M~NAURWNPR

RR
NB

R
CL©MYNDUBRWNPR

RR
NB

R
CL©MYNDUBRWNPR

RR
NB

151.6
95.9
25.7

3.3
43.1
96.6
68.9

6.9
36.4
32.3
19.3

199.1

274.4

181.5

438.1
44.5

521.7

46.1
58.4
28.7
100.1
308.7
329.1
304.7
313.7
59.6
58.4
46.8
111.4
30.3
136.1
267.7
289.2
237.3
163.7
208.6
124.1
101.6
140
23.9
34.8
8.6
5.8
64.5
138
58.4
229.9
478.6
103
118.7
84.9
27.4
39.1
31.8
101.1
158.3
323.5
202.4

598400
375600
94800
5200
164400
378400
267600
19600
137600
121200
69200
788400
1089600
718000
1744400
170000
2078800
0
176400
225600
106800
392400
1226800
1308400
1210800
1246800
230400
225600
179200
437600
113200
536400
1062800
1148800
941200
646800
826400
488400
398400
552000
87600
131200
26400
15200
250000
544000
225600
911600
1906400
404000
466800
331600
101600
148400
119200
396400
625200
1286000
801600

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
1045
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

 

SOD ODDODOO DODO OOOO ODDO O OD OOOO OOOO OOOO ODO OO OOO OO ODO OO OOOO OOO OO OOOO OD

Page 104

1962
1962
1962
1962
1962
1962
1962
1962
1962
1962
1962
1962
1963
1963
1963
1963
1963
1963
1963
1963
1963
1963
1963
1963
1964
1964
1964
1964
1964
1964
1964
1964
1964
1964
1964
1964
1965
1965
1965
1965
1965
1965
1965
1965
1965
1965
1965
1965
1966
1966
1966
1966
1966
1966
1966
1966
1966
1966
1966

OWMNDKHAWNR

PPB
NRO

BR
CLOMID UBRWNPR

RR
NB

BR
CLOMID UBRWNPR

RR
NB

BR
CL©MYNDUNAWNHPR

RR
NB

COMONDUAWNR

RR
RO

226.7
110
381.1
168.1
13.8
23.2
100.3
30.1
28.3
13.2
79.4
289.3
498.9
121.6
749.7
83.2
225.6
14
2.5
88.8
12.7
84.7
130.4
140.7
68.9
231.6
448.9
156.8
144.5
29.7
84
26.7
111.8
43.9
185.8
113.8
205.5
107.7
29.7
111.9
120.9
234.5
130.8
127
51
158.9
222
189.9
71.4
144.2
230.3
148.7
36.9
114
47.3
117.9
41.1
126.3
90.7

898800
432000
1516400
664400
47200
84800
393200
112400
105200
44800
309600
1149200
1987600
478400
2990800
324800
894400
48000
2000
347200
42800
330800
513600
554800
267600
918400
1787600
619200
570000
110800
328000
98800
439200
167600
735200
447200
814000
422800
110800
439600
475600
930000
515200
500000
196000
627600
880000
751600
277600
568800
913200
586800
139600
448000
181200
463600
156400
497200
354800

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
3045
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

 

SOD ODDODOO DODO OOOO ODDO O OD OOOO OOOO OOOO ODO OO OOO OO ODO OO OOOO OOO OO OOOO OD

Page 105

1966
1967
1967
1967
1967
1967
1967
1967
1967
1967
1967
1967
1967
1968
1968
1968
1968
1968
1968
1968
1968
1968
1968
1968
1968
1969
1969
1969
1969
1969
1969
1969
1969
1969
1969
1969
1969
1970
1970
1970
1970
1970
1970
1970
1970
1970
1970
1970
1970
1971
1971
1971
1971
1971
1971
1971
1971
1971
1971

b b
COMI DNEBAWNRN

RR
NB

kB
CL©MYNDUNAWNHPR

RR
NB

kB
SCOM~NDAUERWNRK

RR
NB

kB
SCO©M~YNAURWNPR

RR
NB

C©ONDURWNK

kB
°

425.5
444.8
121.4
314.7
79.2
129.4
493.7
74.3
42.7
14.5
144.7
83.6
98.7
667.9
237.5
85.2
45.2
72.1
42.1
62.7
52.6

32.9
124
21.3
54.4
126.5
91.9
62.4
361.9
29.2
79.5
137.4
52.1
330.6
167.9
107.8
543.3
266.3
90.1
121.3

24.1
20.1
37.3
33.6
89.5
221.6
686.1
407.8
581.9
167.5
72.2
13.2
16.8
49.2
96.8
29.6
83.6

1694000
1771200
477600
1250800
308800
509600
1966800
289200
162800
50000
570800
326400
386800
2663600
942000
332800
172800
280400
160400
242800
202400
-8000
123600
488000
77200
209600
498000
359600
241600
1439600
108800
310000
541600
200400
1314400
663600
423200
2165200
1057200
352400
477200
-8000
88400
72400
141200
126400
350000
878400
2736400
1623200
2319600
662000
280800
44800
59200
188800
379200
110400
326400

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

 

ScoCoOeC OOOO OOOO OOO OR OOOO OOO OO OC OOOO OOOO OR OOOO OOOO OO OOOO OOOO OOD

Page 106

1971
1971
1972
1972
1972
1972
1972
1972
1972
1972
1972
1972
1972
1972
1973
1973
1973
1973
1973
1973
1973
1973
1973
1973
1973
1973
1974
1974
1974
1974
1974
1974
1974
1974
1974
1974
1974
1974
1975
1975
1975
1975
1975
1975
1975
1975
1975
1975
1975
1975
1976
1976
1976
1976
1976
1976
1976
1976
1976

RR
NB

kB
SCO©M~YNAURWNPR

RR
NB

kB
SCO©M~YNAURWNPR

RR
NB

kB
COMIN DAUBRWNPR

RR
NB

kB
CLOMID UBRWNPR

RR
NB

OWMNDKHAWNR

59.5
325.8
215.6
811.1

189
214.1
205.8

61.9

0
2.8
5.3
266.6
298.8

58.9
246.5
357.4
104.7

75.4

68.6

41.2
736.3

41.4

56.1
206.2

71.9

206
811
313.2
395.7
226.5
174.1

46.5

22.6

75.5

37
105.1
351.1

25.2

165
155.5

108
156.5

38.5

111

31

65.5

93

76.5

160.5
218
327
346
435
196
234

23

61.5

3
72.5

230000
1295200
854400
3236400
748000
848400
815200
239600
-8000
3200
13200
1058400
1187200
227600
978000
1421600
410800
293600
266400
156800
2937200
157600
216400
816800
279600
816000
3236000
1244800
1574800
898000
688400
178000
82400
294000
140000
412400
1396400
92800
652000
614000
424000
618000
146000
436000
116000
254000
364000
298000
634000
864000
1300000
1376000
1732000
776000
928000
84000
238000
4000
282000

5000
5000
5000
5000
5000
5000
5000
5000
5000

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

 

ScoCoCoOeC OOOO OOOO OOO OOO OO OOOO OC OOOO OOO OOOO OC OOOO OO OOOO ORR OOO OOO OD

Page 107

1976
1976
1976
1977
1977
1977
1977
1977
1977
1977
1977
1977
1977
1977
1977
1978
1978
1978
1978
1978
1978
1978
1978
1978
1978
1978
1978
1979
1979
1979
1979
1979
1979
1979
1979
1979
1979
1979
1979
1980
1980
1980
1980
1980
1980
1980
1980
1980
1980
1980
1980
1981
1981
1981
1981
1981
1981
1981
1981

PPB
NRO

kB
CLOMID UBRWNPR

RR
NB

kB
CLOMID UBRWNPR

RR
NB

kB
CO©MYNDUBRWNPR

RR
NB

kB
CL©MYNDUNAWNHPR

RR
NB

ONAUERWNK

105.5
119.5
55.5
147
149
174
42.5
58
40.5
58.5
15
28
96.5
178
50.5
124.5
198
404
48
137
52.5
59
54.5
103
40.5
211.5
182.5
382
129
88
70.5
23.5
78
28

22.5
113
169

70
185.5
215.5

16.5

56
355.5

15.5

64

41.5

118.5
24.8
172.3
129.5
241
64
209
195.5
64
43.3
36

414000
470000
214000
580000
588000
688000
162000
224000
154000
226000
52000
104000
378000
704000
194000
490000
784000
1608000
184000
540000
202000
228000
210000
404000
154000
838000
722000
1520000
508000
344000
274000
86000
304000
104000
4000
82000
444000
668000
272000
734000
854000
58000
216000
1414000
54000
248000
158000
-8000
466000
91200
681200
510000
956000
248000
828000
774000
248000
165200
136000

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

 

ScoCOoOeC OO OOO OR OOOO OOO OOOO OOOO OC OOO OOOO OOOO OOO OO OOOO OOO OOO OOO OG

Page 108

1981
1981
1981
1981
1982
1982
1982
1982
1982
1982
1982
1982
1982
1982
1982
1982
1983
1983
1983
1983
1983
1983
1983
1983
1983
1983
1983
1983
1984
1984
1984
1984
1984
1984
1984
1984
1984
1984
1984
1984
1985
1985
1985
1985
1985
1985
1985
1985
1985
1985
1985
1985
1986
1986
1986
1986
1986
1986
1986

Pepe
NRPOw

COMONDUAWNR

Pepe
NRO

COMONDUAWNR

Pepe
NRO

COMONDUAWNR

PPR
NRO

C©ONDURWNK

PPR
NRO

NOUR WNPR

12
27
257.5
332
409
124
177
98
126

13
112
26
47
13
91
173
65
128
220
358
451
102
105
104
81
403
185
144
55
39
111
32
133
206
a1
20
175
43
119
105
77
479
7S
107
50
224
52
69
71
86
90
32
38
84
40
148
16.5
143

40000
100000
1022000
1320000
1628000
488000
700000
384000
496000
4000
44000
440000
96000
180000
44000
356000
684000
252000
504000
872000
1424000
1796000
400000
412000
408000
316000
1604000
732000
568000
212000
148000
436000
120000
524000
816000
36000
72000
692000
164000
468000
412000
300000
1908000
292000
420000
192000
888000
200000
268000
276000
336000
352000
120000
144000
328000
152000
584000
58000
564000

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

 

SOD ODDODOO DODO OOOO ODDO O OD OOOO OOOO OOOO ODO OO OOO OO ODO OO OOOO OOO OO OOOO OD

Page 109

1986
1986
1986
1986
1986
1987
1987
1987
1987
1987
1987
1987
1987
1987
1987
1987
1987
1988
1988
1988
1988
1988
1988
1988
1988
1988
1988
1988
1988
1989
1989
1989
1989
1989
1989
1989
1989
1989
1989
1989
1989
1990
1990
1990
1990
1990
1990
1990
1990
1990
1990
1990
1990
1991
1991
1991
1991
1991
1991

PPR
NR Ow Dw

C©ONDURWNK

PPR
NRO

C©ONDURWNK

PPR
NRO

OWMNDKHAWNPR

PPB
NRO

OWMNDKHAWNR

PPB
NRO

DAuURWNRK

74
70
201.5
144
163.5
153
210
115
117.5
106.5
128
97
77

215
85
190
135
82
241
542.5
50
164
211
73
22
38
36
414
251
220
377
713
223
51
77
107
13
17
186
112
89
395
240
266
204
164
35

RO

57
136
89
114
216
101
44
79
54

288000
272000
798000
568000
646000
604000
832000
452000
462000
418000
504000
380000
300000
0
852000
332000
752000
532000
320000
956000
2162000
192000
648000
836000
284000
80000
144000
136000
1648000
996000
872000
1500000
2844000
884000
196000
300000
420000
44000
60000
736000
440000
348000
1572000
952000
1056000
808000
648000
132000
28000
8000
220000
536000
348000
448000
856000
396000
168000
308000
208000

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
1045
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

 

SOD ODDODOO DODO OOOO ODDO O OD OOOO OOOO OOOO ODO OO OOO OO ODO OO OOOO OOO OO OOOO OD

Page 110

1991
1991
1991
1991
1991
1991
1992
1992
1992
1992
1992
1992
1992
1992
1992
1992
1992
1992
1993
1993
1993
1993
1993
1993
1993
1993
1993
1993
1993
1993
1994
1994
1994
1994
1994
1994
1994
1994
1994
1994
1994
1994
1995
1995
1995
1995
1995
1995
1995
1995
1995
1995
1995
1995
1996
1996
1996
1996
1996

PPB
NPOWwwAN

OWMNDKHAWNR

PPB
NRO

OWMNDKHAWNR

PPB
NRO

CO©ONDUAWNR

Pepe
NRO

COMONDUAWNR

Pepe
NRO

URWNR

30
0

5
71
34
480
85
876
416
204
121
16
74
40.5
65
9
138
63
79
182
228
42
69
19
87.5
101
90
73
200
145
289
221
420
197
107
11
60
11
17
48
32
171
49
522
139
108
75
40

35
32
88
187
192
322
75
99
63
292

112000
-8000
12000
276000
128000
1912000
332000
3496000
1656000
808000
476000
56000
288000
154000
252000
28000
544000
244000
308000
720000
904000
160000
268000
68000
342000
396000
352000
284000
792000
572000
1148000
876000
1672000
780000
420000
36000
232000
36000
60000
184000
120000
676000
188000
2080000
548000
424000
292000
152000
12000
132000
120000
344000
740000
760000
1280000
292000
388000
244000
1160000

5000
5000

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

 

ScoCoCoOeC OOOO OOOO OOO OOO OOOO OC OOO OC OO OOO OO OOOO OOO OOO OOO OC OOO OOOO ORS

Page 111

1996
1996
1996
1996
1996
1996
1996
1997
1997
1997
1997
1997
1997
1997
1997
1997
1997
1997
1997
1998
1998
1998
1998
1998
1998
1998
1998
1998
1998
1998
1998
1999
1999
1999
1999
1999
1999
1999
1999
1999
1999
1999
1999
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2001
2001
2001
2001
2001

BR
COMA ND

RR
NB

COMONDUAWNR

Pepe
NRO

COMONDUAWNR

Pepe
NRO

COMONDURWNR

PPR
NRO

ON DUBRWNPR

Pepe
NRO

DARWNR

99
23
15
17
87.5
61
105
164
76
199
114
277
52
47
16
18
123
106
56
232
87
84
175
160
29
60
119
197

115
96.5
215
672
348
160
440
223
149
91
103
136
83
262.3
70.5
132
105
195.5
150.5
80

239.5
162
130
44.4
200
220
58
49

388000
84000
52000
60000

342000

236000

412000

648000

296000

788000

448000

1100000
200000
180000
56000
64000
484000
416000
216000
920000
340000
328000
692000
632000
108000
232000
468000
780000
28000
452000
378000
852000
2680000
1384000

632000
1752000

884000

588000

356000

404000

536000

324000

1041200

274000

520000

412000

774000

594000

312000
12000

-8000

950000

640000

512000

169600

792000

872000

224000

188000

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

5000
5000
5000
5000
5000
5000
5000

 

ScoCoCoOeC OO OR COO OOOO OOO OOOO OOOO OC OOO OOOO OO OO OOO OO OOOO OC OO OOO OOO OD

Page 112

2001
2001
2001
2001
2001
2001
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2003
2003
2003
2003
2003
2003
2003
2003
2003
2003
2003
2003
2004
2004
2004
2004
2004
2004
2004
2004
2004
2004
2004
2004
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2006
2006
2006
2006
2006
2006
2006

PPB
NPOWwwAN

OWMNDKHAWNR

PPB
NRO

OWMNDKHAWNR

PPB
NRO

CO©ONDUAWNR

Pepe
NRO

BR
COMYNDAWNR

a
N

ONDARWNPR

69
14
21.5
35
189
115.5
114
105
113
107
134
86

142
14
77

102

185

560
143
164
167

a1

62
124

96

57
260
269
188
250
186

13

27
103
159
199

181.5

46

31
200
193

29

31

34
116
327
255
159
193

36

89.3
57.6
41.6

268000
48000
78000

132000

748000

454000

448000

412000

444000

420000

528000

336000

-8000

560000
48000

300000

400000

732000
12000

2232000

564000

648000

660000
36000

240000

488000

8000
376000
220000

1032000
1068000

744000

992000

736000
20000
44000

4000

4000

100000

404000

628000

788000

718000

176000

116000

792000

764000

108000

116000

128000

456000

1300000
1012000

628000

764000

136000

349200

222400

158400

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

 

ScoeoCoOeC OOOO OOOO OOO OOO OOO OOO OC OOOO OOO OOOO OC OOOO OOO OR OOOO OOO OOO OG

Page 113

2006
2006
2006
2006
2007
2007
2007
2007
2007
2007
2007
2007
2007
2007

9 124.6
10 37.8
11 98
12 74

1 75.7

2 295.2

3 118.6

4 18.8

5 119

6 136.6

8 375.4

9 152.5
10 60.8
12 214.8

490400
143200
384000
288000
294800
1172800
466400
67200
468000
538400
1493600
602000
235200
851200

average 139.414747 549658.99

5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000

 

eceo0oOoOoO OOOO OOOO

Page 114

                                                                                  Callaghan & Toth

APPENDIX 8                 -         SEDIMENT BASIN CALCULATION




                                         V=10 x CV x A x Rx-day, y-%ile

Where:

10 = a unit conversion factor

CV = the volumetric runoff coefficient defined as that portion of rainfall that runs off as
stormwater over the x-day period

Rx-day, y-%ile = is the x-day total rainfall depth (mm) that is not exceeded in y percent of rainfall
events.

A = total catchment area (Ha)




Sediment storage zone design parameters used here:

    •    50% of setting zone capacity


AREA OF   SITE                  CV          RX-day,y-   TOTAL       SETTING   SEDIMENT     TOTAL
TREATMENT                                   %ile        CMT         ZONE      STORAGE      BASIN
                                                        (Ha)        VOLUME    VOLUME       VOLUME
                                                                    (m3)      (m3)         (m3)
150x21 A                           0.3        43.4       0.315        41.0       20.5        61.50
70x21 B                            0.3        43.4       0.147        19.1       9.55        28.65


Basin A: 13.7m x 3m x 1.5m D, setting depth 1m, storage 0.5m

Basin B: 9.55m x 2m x 1.5m D, setting depth 1m, storage 0.5m




                                                                                                 I
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                               SWQMP_REV_3
SEPTEMBER 2013

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.