Original source · versioned page text
1209 SWQMP Report_3 2013
Catchment 4, B. D & E - Gravel Carpark/Road
Catchment C
‘ass adj Shed |
Catchment F - Gravel Road/Parking
Buffer - Catch A.B.D.E Swale - Shed 1
Bioretention Swale 1
—@- ie
Swale - Shed 3 Catchment G & GA- Grass adi Shed 3
Roof Areas of Sheds 1-8 RWT G2 x 50,000)
Swale - Shed 6 Bioretention Basin 1
Buffer - Catch L.M.R.S.V.W1X
Catchment |, O,P & Q - gravel roads:
Catchment U- Grass adj Shed 6
Catchment K & N - gravel road
| Catchment L.M.R.S.Y v1_X - gravel roads
1 4 ‘i 4 Catchment T - gravel road_| |
Agnoul Agricuturs
Beretention - t é
Boretenton - 2
MUSIC MODEL FOR BUNDED COMPOSTING AREA
Recetving Node
Callaghan & Toth "STORMWATER QUALITY MANAGEMENT PLAN MUSIC MODEL
Civil, Environmental &
: : location
, | Hydraulic Engineers
136 TOP FORESTRY ROAD
8/41 Sunshine Beach Road RIDGEWOOD Q4563 .
NOOSA HEADS 4567 Figure 3.1
Ph: 54749081 Fax: 54749041
www.callaghanandtoth.com.au Scale: NTS
DATE: AUGUST 2013 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.