Original source · versioned page text
1209 SWQMP Report_3 2013
Catchment A +dam detention Q10 Coo noosa 10-Year Duration=20 min, Inten=127.9 mm/hr
Prepared by {enter your company name here} Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC Page 5
Summary for Reach 4R: (new Reach)
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 11.3630 ha, 0.00% Impervious, Inflow Depth > 37 mm for 10-Year event
Inflow = 1.90082 [email protected] hrs, Volume= 4.176 Ml
Outflow = 1.90082 [email protected] hrs, Volume= 4.176 Ml, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
Reach 4R: (new Reach)
Hydrograph
1.90082 m³/s Inflow
1.90082 m³/s Outflow
2 Inflow Area=11.3630 ha
Flow (m³/s)
1
0
0 1 2 3
Time (hours)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.