Original source · versioned page text
1209 SWQMP Report_3 2013
Catchment A +dam detention Q10 Coo noosa 10-Year Duration=20 min, Inten=127.9 mm/hr
Prepared by {enter your company name here} Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC Page 7
Summary for Pond 7P: (new Pond)
Inflow Area = 5.6815 ha, 0.00% Impervious, Inflow Depth = 37 mm for 10-Year event
Inflow = 1.29046 [email protected] hrs, Volume= 2.105 Ml
Outflow = 0.95041 [email protected] hrs, Volume= 2.088 Ml, Atten= 26%, Lag= 9.1 min
Primary = 0.95041 [email protected] hrs, Volume= 2.088 Ml
Routing by Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
Peak Elev= 125.255 [email protected] hrs Surf.Area= 0.2736 ha Storage= 0.685 Ml
Plug-Flow detention time= 14.7 min calculated for 2.081 Ml (99% of inflow)
Center-of-Mass det. time= 14.8 min ( 39.5 - 24.7 )
Volume Invert Avail.Storage Storage Description
#1 125.000 m 1.367 Ml 58.00 mD x 0.50 mH Vertical Cone/Cylinder Z=2.0
Device Routing Invert Outlet Devices
#1 Primary 125.000 m 5.00 m long x 1.00 m breadth Broad-Crested Rectangular Weir
Head (meters) 0. 061 0. 122 0. 183 0. 244 0. 305 0. 366 0. 427
0.488 0. 549 0. 610 0. 762 0. 914 1. 067 1. 219 1. 372 1. 524 1. 676
Coef. (Metric) 1. 34 1. 42 1. 48 1. 48 1. 47 1. 46 1. 46 1. 48 1. 48
1.50 1. 54 1. 58 1. 61 1. 65 1. 76 1. 79 1. 83
Primary OutFlow Max=0.95021 [email protected] hrs HW=125.255 m (Free Discharge)
1=Broad-Crested Rectangular Weir (Weir Controls 0.95021 [email protected] m/s)
Pond 7P: (new Pond)
Hydrograph
1.29046 m³/s Inflow
Primary
Inflow Area=5.6815 ha
Peak Elev=125.255 m
0.95041 m³/s Storage=0.685 Ml
1
Flow (m³/s)
0
0 1 2 3
Time (hours)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.