Skip to the record
For the highest quality transcripts.

Original source · versioned page text

1209 SWQMP Report_3 2013

of 114

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

roof catchment Pre development Q10 noosa 10-Year Duration=6 min, Inten=208.9 mm/hr
Prepared by {enter your company name here}                                       Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC                             Page 2

                         Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
                         Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
                Reach routing by Stor-Ind method - Pond routing by Stor-Ind method

Subcatchment 2S: total roof area        Runoff Area=14,653.0 m² 0.00% Impervious Runoff Depth=21 mm
                                                      Tc=6.0 min C=0.74 Runoff=0.63011 m³/s 0.306 Ml

Reach 4R: (new Reach)                                                   Inflow=0.63011 m³/s 0.306 Ml
                                                                       Outflow=0.63011 m³/s 0.306 Ml

           Total Runoff Area = 1.4653 ha Runoff Volume = 0.306 Ml Average Runoff Depth = 21 mm
                                       100.00% Pervious = 1.4653 ha 0.00% Impervious = 0.0000 ha
Log in to download the original file

1209 SWQMP Report_3 2013.pdf · 4.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.