Attachment_A-P-EA-100375359_(MCU__OPW_and_EA_Combined)
2212-32529 SRA Conditions Condition timing (b) Submit the hydrographic survey plan to [email protected] or mailed to: Department of Environment and Science Permit and License Management GPO Box 2454 Brisbane Qid 4001 The chief executive administering the Planning Act 2016 nominates the Director-General of Agriculture and Fisheries to be the enforcement authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following conditions: 11. Development authorised under this approval is limited as follows: At all times Operational work for the permanent removal, destruction or damage of marine plants for beach nourishment being limited to 244.2m2 of dead marine wood and shown in Figure 2-1 of Dog Beach Sand Nourishment project: Marine Plant Monitoring Plan prepared by BMT, reference R.A10342.002.00.Marine Plant MP.docx Operational work for the temporary removal, destruction or damage of marine plans for beach nourishment being limited to 45.9 m2 of subtidal detritus and shown in Figure 2-1 of Dog Beach Sand Nourishment project: Marine Plant Monitoring Plan prepared by BMT, reference R.A10342.002.00._Marine Plant MP.docx 12. The dredging and beach nourishment must be carried out generally in At all times accordance with the following plans: - General Arrangement prepared by BMT, reference A10342-02- 02; and - Typical Sections and Volumes prepared by BMT reference A10342-02-03. 13. The marine plant monitoring must be undertaken generally in Monitoring: accordance with Dog Beach Sand Nourishment project: Marine Plant Monitoring Plan prepared by BMT. reference R.A10242.002.00 Marine Plant MP.docx A post construction Monitoring reports must be submitted to [email protected] in hn wa y of accordance with Table 2-1 of the Dog Beach Sand Nourishment project: Marine Plant Monitoring Plan. . completion; Six months after the Post-construction survey, and Yearly for a period of three years after completion of the works. State Assessment and Referrs! Agency Page Sof 13 Document Set ID: 22365982 Version: 3, Version Date: 06/04/2023 Page 10 of 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.