2212-32529 SRA

 

Conditions

Condition timing

 

 

(b) Submit the hydrographic survey plan to [email protected] or
mailed to:
Department of Environment and Science
Permit and License Management
GPO Box 2454
Brisbane Qid 4001

 

 

The chief executive administering the Planning Act 2016 nominates the Director-General of Agriculture and
Fisheries to be the enforcement authority for the development to which this development approval relates
for the administration and enforcement of any matter relating to the following conditions:

 

 

 

 

 

 

 

 

 

11. Development authorised under this approval is limited as follows: At all times
Operational work for the permanent removal, destruction or damage of
marine plants for beach nourishment being limited to 244.2m2 of dead
marine wood and shown in Figure 2-1 of Dog Beach Sand Nourishment
project: Marine Plant Monitoring Plan prepared by BMT, reference
R.A10342.002.00.Marine Plant MP.docx
Operational work for the temporary removal, destruction or damage of
marine plans for beach nourishment being limited to 45.9 m2 of subtidal
detritus and shown in Figure 2-1 of Dog Beach Sand Nourishment
project: Marine Plant Monitoring Plan prepared by BMT, reference
R.A10342.002.00._Marine Plant MP.docx
12. The dredging and beach nourishment must be carried out generally in At all times
accordance with the following plans:
- General Arrangement prepared by BMT, reference A10342-02-
02; and
- Typical Sections and Volumes prepared by BMT reference
A10342-02-03.
13. The marine plant monitoring must be undertaken generally in Monitoring:
accordance with Dog Beach Sand Nourishment project: Marine Plant
Monitoring Plan prepared by BMT. reference R.A10242.002.00 Marine
Plant MP.docx A post construction
Monitoring reports must be submitted to [email protected] in hn wa y of
accordance with Table 2-1 of the Dog Beach Sand Nourishment project:
Marine Plant Monitoring Plan.
. completion;
Six months after the
Post-construction
survey, and
Yearly for a period of
three years after
completion of the
works.
State Assessment and Referrs! Agency Page Sof 13

Document Set ID: 22365982

Version: 3, Version Date: 06/04/2023

Page 10 of 31
Log in to download the original file

Attachment_A-P-EA-100375359_(MCU__OPW_and_EA_Combined).pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.