Attachment_A-P-EA-100375359_(MCU__OPW_and_EA_Combined)
Plan No. Rev. Plan/Document Name Date
A10342-02-02 C General Arrangement 26/05/2021
Prepared by BMT
A10342-02-03 B Typical Sections and Volumes 29/01/2021
Prepared by BMT
Currency Period
2. The Currency Period for this development approval lapses if all conditions have not been
complied with by 31 March 2025, unless an application to extend the currency period is
approved by Council.
General Conditions
3. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
(1994) and the Environmental Protection (Water) Policy 2009.
4. All works must be undertaken in accordance with the conditions within the environmental
authority permit: P-EA-100232409.
5. All works and structures associated with the works must be constructed wholly within the
approved area.
6. Lighting associated with the use must be designed, installed, operated, and maintained in
accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
7. Safe pedestrian, vehicle and vessel access in the vicinity of the works must be maintained
at all times.
Document Set ID: 22365982
Page 2 of 31
Version: 3, Version Date: 06/04/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.