2212-32529 SRA
(Under section 56(1)(){) of the Planning Act 2076 the following conditions must be atiached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment S)
No.
Conditions
Condition timing
Operational work
The chief executive administering the Planning Act 2016 nominates the Director-General of Transport and
Main Roads to be the enforcement authority for the development to which this development approval
relates for the administration and enforcement of any matter relating to the following conditions:
1.
All vessels, structures, plant, and equipment associated with the
construction of the approved works must be lit/marked in accordance
with the following specifications and requirements such that undertaking
the construction works does not cause a risk to the safe navigation of
ships:
{a) any anchors deployed must be marked with yellow buoys and
fitted with FL yellow lights fitted
{b) lighting provided must not obscure, disguise or otherwise
interfere with the effectiveness of navigational lighting.
For the duration of
works and for
operation to be
maintained at ail times
(a) Prepare a Marine Execution Plan (MEP) by an appropriately
qualified person(s). that includes, but not limited to the following:
i. demonstrating that the construction and operation of the
development will not impede the safe navigation of other
vessels or restrict safe access to or from neighbouring
‘structures
i. is consistent with any requirements of Maritime Safety
Queensland guidelines for major development proposal
ai. lighting/marking requirements, any anchors deployed must be
marked with yellow buoys and fitted with FL yellow lights
fitted. Any floating plant, equipment and pipelines shall be
appropriately fit and / or marked to the satisfaction of the
Harbour Master.
(©) Submit to the Marine Execution Plan (MEP) prepared in accordance
with part (a) of this condition to
[email protected].gov_au or mailed to:
Maritime Safety Queensland
PO Box 1094
Mooloolaba 4557
(c) Carry out the construction and dredging as applicable in accordance
with the Marine Execution Plan (MEP) in accordance with part (a) of
this condition.
(a) and (b)
At least 20 business
days prior to the
commencement of
works
(c) For the duration of
works
The chief executive administering the Planning Act 2016 nominates the Director-General of Environment
and Science to be the enforcement authority for the development to which this development approval
relates for the administration and enforcement of any matter relating to the following conditions:
3.
The construction of the dredge channel, sand plugs and beach
nourishment must be undertaken generally in accordance the plans
For the duration of the
works
State Assezsment and Refer: Agency
Document Set ID: 22365982
Version: 3, Version Date: 06/04/2023
Page 4 of 13
Page 8 of 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.