Attachment 1—Referral agency conditions

2212-32529 SRA

 

(Under section 56(1)(){) of the Planning Act 2076 the following conditions must be atiached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment S)

 

No.

 

Conditions

 

Condition timing

 

Operational work

 

The chief executive administering the Planning Act 2016 nominates the Director-General of Transport and
Main Roads to be the enforcement authority for the development to which this development approval
relates for the administration and enforcement of any matter relating to the following conditions:

 

1.

All vessels, structures, plant, and equipment associated with the
construction of the approved works must be lit/marked in accordance
with the following specifications and requirements such that undertaking
the construction works does not cause a risk to the safe navigation of
ships:
{a) any anchors deployed must be marked with yellow buoys and
fitted with FL yellow lights fitted
{b) lighting provided must not obscure, disguise or otherwise
interfere with the effectiveness of navigational lighting.

For the duration of
works and for
operation to be
maintained at ail times

 

(a) Prepare a Marine Execution Plan (MEP) by an appropriately
qualified person(s). that includes, but not limited to the following:
i. demonstrating that the construction and operation of the
development will not impede the safe navigation of other
vessels or restrict safe access to or from neighbouring
‘structures
i. is consistent with any requirements of Maritime Safety
Queensland guidelines for major development proposal
ai. lighting/marking requirements, any anchors deployed must be
marked with yellow buoys and fitted with FL yellow lights
fitted. Any floating plant, equipment and pipelines shall be
appropriately fit and / or marked to the satisfaction of the
Harbour Master.

(©) Submit to the Marine Execution Plan (MEP) prepared in accordance
with part (a) of this condition to
[email protected].gov_au or mailed to:

Maritime Safety Queensland
PO Box 1094
Mooloolaba 4557

(c) Carry out the construction and dredging as applicable in accordance
with the Marine Execution Plan (MEP) in accordance with part (a) of
this condition.

(a) and (b)

At least 20 business
days prior to the
commencement of
works

(c) For the duration of
works

 

The chief executive administering the Planning Act 2016 nominates the Director-General of Environment
and Science to be the enforcement authority for the development to which this development approval
relates for the administration and enforcement of any matter relating to the following conditions:

 

3.

 

 

The construction of the dredge channel, sand plugs and beach
nourishment must be undertaken generally in accordance the plans

 

For the duration of the
works

 

 

State Assezsment and Refer: Agency

Document Set ID: 22365982

Version: 3, Version Date: 06/04/2023

Page 4 of 13

Page 8 of 31
Log in to download the original file

Attachment_A-P-EA-100375359_(MCU__OPW_and_EA_Combined).pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.