RFI - Attachment 2 - Permit Environmental Authority No. EPPR01855314
Permit
Environmental authority – EPPR01855314
Release To Waters
WT1 Site erosion protection measures and sediment control measures must be implemented and
must have the hydraulic effectiveness to treat stormwater for 90% of the annual runoff for
each stormwater catchment.
Where soils are temporarily exposed for the construction of new facilities or to facilitate
changes in landfill design, all reasonable and practical measures must be implemented to
minimise the amount of sediments able to discharge from the site. As a minimum the following
design criteria apply:
1. Collect and drain stormwater from disturbed soils to a sediment basin sized to contain
an 80th% five-day event or similar; and
2. The design life and design storm for temporary drainage works to convey waters to
the sediment basin and around disturbed areas are:
a) Disturbed area open for <12 months-1 in 2-year ARI event plus 150mm
freeboard; and
b) Disturbed area open for 12-24 months—1 in 5-year ARI event plus 150mm
freeboard; and
c) Disturbed area open for > 24 months-1 in 10-year ARI event plus 150mm
freeboard; and
d) Temporary culvert crossing—minimum 1 in 1-year ARI hydraulic capacity
WT2 The release of collected and treated stormwater to waters, from areas of the site not likely to
be contaminated with waste materials, must be in accordance with Table 2— Compliance limits
for controlled release of treated stormwater to surface waters.
Table 2—Compliance limits for controlled release of treated stormwater to surface waters
Quality Release Release
Limit Type Monitoring Frequency
Characteristics Point Limit
pH (pH Units) SW2 and 6.5 - 9.0 Range Commencement of release then
SW5 weekly thereafter. If no release
occurs, no sampling is required.
Specific SW2 and 1500 Maximum Commencement of release then
Conductance SW5 weekly thereafter. If no release
(µS/cm) occurs, no sampling is required.
Dissolved SW2 and 6 Minimum Commencement of release then
Oxygen (mg/L) SW5 weekly thereafter. If no release
occurs, no sampling is required.
Total and SW2 and N/A N/A Commencement of release then
dissolved SW5 weekly thereafter. If no release
aluminium* occurs, no sampling is required.
(mg/L)
Suspended SW2 and 50 Maximum Commencement of release then
Solids (mg/L) SW5 weekly thereafter for a minimum
of 5 events and until a reliable
TSS:NTU correlation is
established and agreed to in
writing by the administering
Page 9 of 22 • ESR/2016/3415 • Version 2.04 • Effective: 30 JAN 2017 Department of Environment and Science