Council archive · source document
Appendix B Code Compliance Statements · MCU22/0038
Noosa Business Centre – Lot 22 Medihub Noosa Plan 2006 dated June 2018
Compliance
Specific Outcomes Probable Solutions Response
ü/û/NA
d) the construction of Walter Hay Drive S103.2
betweenEmu Mountain Road and Eenie Two road accesses are constructed into the Shire
Creek Road; Business Centre site as part ofthe first stage of the
e) interim transport circulation and access development.
strategies in the absence of the internal
looproad73 being complete; S104.1
f) an established landscape theme for No solution provided
thedeveloped precincts;
g) landscaped entry statements;
h) a suitable stormwater management system;
i) appropriate signage;
j) commencement of the associated
pedestrianand bikeway network and
related external connections; and
k) dedication of a substantial area of the
southern part of the Shire Business Centre
aspublic open space;
AND
O104
Subsequent development stages provide fo rthe—
a) completion of the access intersections
leadinginto the Shire Business Centre site;
b) completion of further stages of the
internalloop road;
c) completion of further stages of
developmentwithin the precincts;
d) completion of the pedestrian and bikeway
network;
e) construction of the link road to the
NoosavilleIndustrial Estate;
f) construction of a inter-regional transit
facility(public transport node);
g) completion of the stormwater
managementsystems;
h) completion of landscaping design
elements;and
Page | 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix B Code Compliance Statements.pdfRelated documentApplication case desk ↗
About this file
- File size
- 332 KB (small file)
- File type
No other editions are linked here.