Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Appendix B Code Compliance Statements · MCU22/0038

of 72

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Noosa Business Centre – Lot 22 Medihub                                                                                                            Noosa Plan 2006 dated June 2018

                                                                                                                  Compliance
 Specific Outcomes                                       Probable Solutions                                                  Response
                                                                                                                  ü/û/NA
                                                         OR                                                                  Shire Business Centre that directs to the future public
                                                                                                                             transport facility location.
                                                         S30.2
                                                         Direct pathway access is provided to thepublic
                                                         transport facility if the facility is containedon site
                                                         or within 50m from the property boundary.
 O31                                                     S31.1                                                       ü       Compliant
                                                         Safe and convenient cycle access to andfrom the
 Business Uses are designed and constructed to                                                                               Please refer to the attached Appendix E – Traffic Impact
                                                         site from the existing road and bicycle network,
 encourage users of the development to access the                                                                            Statement Report.
                                                         and safe pathway movement within the site is
 site by means of footor bicycle through provision of
                                                         provided;
 appropriate end- of-trip facilities including bicycle
 parking and shower/change rooms.
                                                         AND
                                                         S31.2
                                                         Secure and convenient parking space forbicycles is
                                                         provided on site in accordance with AS2890.3
                                                         Bicycle Parking Facilities and Figure 14-1 Minimum
                                                         Requirements for Bicycle Parking;

                                                         AND
                                                         S31.3
                                                         Where at least 5 bicycle parking spacesare required
                                                         in accordance with Figure 14-1 Minimum
                                                         Requirements for Bicycle Parking, end-of-trip cycle
                                                         facilities are provided at the following rate:
                                                           a) 1 locker per 2 bicycle parking spaces; and
                                                           b) 1 shower cubicle with ancillary change
                                                                 rooms per 10 bicycle spaces or part
                                                                 thereof;

                                                         AND
                                                         S31.4
                                                         Bicycle parking spaces and cyclist facilities
                                                         are designed in accordance with
                                                         AUSTROADS Guide to Traffic Engineering
                                                         Practice, Part 14 – Bicycles, Section 10;



                                                                                                                                                                              Page | 47

Used in these records

About this file

File size
332 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix B Code Compliance Statements.pdf · 332 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.